Home / Browse projects / Raigarh, Maharashtra / Devpriya

Completed Litigation declared Others project

Devpriya

By SHREE CHAMUNDA REALTY

RG-MH-06065 · RERA P52000052326 · Last updated on MahaRERA portal: 2 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Internal walls, 98%
24 of 80Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

Devpriya is a Others project by SHREE CHAMUNDA REALTY in Raigarh, Maharashtra, registered with MahaRERA as P52000052326 on 10 Aug 2023. The registration is recorded completed; possession was promised by 30 Jun 2027. 56 of the 80 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameDevpriya
  • TypeOthers
  • Location
    • Plot no-10B
    • Sector-18
    • Ulawe
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000052326
  • ReraGenie IDRG-MH-06065

Builder

  • NameSHREE CHAMUNDA REALTY
  • Entity typePartnership
  • PartnersHARESH DHARAMSHI MINAT, NAVIN HARILAL MINAT
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredAug 2023PromisedJun 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 Aug 2023
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed71 files

Current status

70%56 of 80 units booked
74.4%Work done, per cost certificate

Figures as on 2 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DevpriyaNA1411681280

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 98%.

Devpriya: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.44%

Progress on shared amenities15

As on 2 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed64

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots64
Closed/Covered59
Open Space5

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,698 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 May 2025

Approvals and building plan

Sanctioning authorityCIDCO Limited
Permissible FSI6688.74
Proposed, not sanctioned6,689 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No-1 and 2, Plot No-63, Sector-14, Vashi, Navi Mumbai-400705
Estimated costRs 22.18 cr
Cost incurredRs 16.50 cr
Work done74.38%
BuildingWingEstimatedIncurred
DevpriyaNARs 19.74 crRs 15.50 cr
-NARs 2.44 crRs 1.00 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAtul Patel Architects
EngineerB S Sukthankar & Associates
EngineerMahesh A Bagade
EngineerPrakash Bahuleyan
Chartered AccountantR V Thakkar & Associates Chartered Accountants
Chartered AccountantL K Dedhia & Co
PartnerRole in project
SHREE CHAMUNDA REALTY-

Litigation declared2

CaseCourtStatus
169/2014Civil Court Senior Division PanvelOngoing
SCS-169/2014/2014Civil Court, Senior Division, PanvelOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 as on 30th December 2025.pdf2 May 2026
Withdrawal Update Form 2File: Form 2 as on 31st December 2025.pdf2 May 2026
Withdrawal Update Form 3File: Form 3 as on 31st December 2025.pdf2 May 2026
Occupational CertificateFile: OC Scanned.pdf2 May 2026
Occupational CertificateFile: Form 4.pdf2 May 2026
Withdrawal Update Form 1File: Form 1 as on 30th December 2025.pdf24 Jan 2026
Withdrawal Update Form 2File: Form 2 as on 31st December 2025.pdf24 Jan 2026
Withdrawal Update Form 3File: Form 3 as on 31st December 2025.pdf24 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 as on 31st March 2025, Devpriya.pdf6 Nov 2025
Withdrawal Update Form 1File: Form 1 as on 30th September 2025.pdf4 Nov 2025
Withdrawal Update Form 2File: Form 2 as on 30 September 2025 Devpriya.pdf4 Nov 2025
Withdrawal Update Form 3File: Withdrawal Application Form 3 as on 30th September 2025.pdf4 Nov 2025
Form 2A (FY 2024-2025)File: form 2A as on 31st March 2025.pdf23 Jun 2025
Form 2A (FY 2023-2024)File: Form 2A as on 31st March 2024.pdf23 Jun 2025
Form 1File: Rera Form 1 as on 31st March 2025.pdf22 May 2025
Form 2File: Form-2 as on 31st March 2025.pdf22 May 2025
Form 3File: Form 3 as on 31st March 2025.pdf22 May 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD,BOOKED INVENTORY 16 May 2025.pdf22 May 2025
Form 1File: Rera Form 1 as on 31st March 2025.pdf19 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on Sept 2024.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD,BOOKED INVENTORY.pdf17 Oct 2024
Building plan approvalFile: CC Amended plans Devpriya 1.pdf10 Oct 2024
Building plan approvalFile: CC Amended plans Devpriya 2.pdf10 Oct 2024
Building plan approvalFile: CC Amended plans Devpriya 3.pdf10 Oct 2024
Building plan approvalFile: CC Amended plans Devpriya 4.pdf10 Oct 2024
Building plan approvalFile: CC Amended plans Devpriya 5.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on 30th September 2024.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on 30th September 2024.pdf10 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Amended Devpriya.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: CC Amended plans Devpriya 1.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: CC Amended plans Devpriya 2.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: CC Amended plans Devpriya 3.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: CC Amended plans Devpriya 4.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: CC Amended plans Devpriya 5.pdf10 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 as on 31st March 2024.pdf27 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 as on 31st March 2024.pdf17 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A as on 31st March 2024.pdf17 May 2024
Details of encumbrances concerned to FinanceFile: Case Status.pdf16 May 2024
Details of encumbrances concerned to LegalFile: Case Status.pdf16 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form-1 as on 31st March 2024.pdf16 May 2024
Other - TechnicalFile: Declaration order number 45 of 2023.pdf27 Jul 2023
Details of encumbrances concerned to FinanceFile: Details of encumbranes Legal and case status.pdf6 Jul 2023
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to finance.pdf6 Jul 2023
Details of encumbrances concerned to LegalFile: Details of encumbranes Legal and case status.pdf6 Jul 2023
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to finance.pdf6 Jul 2023
Copy of the legal title reportFile: Search Title Pavti compressed.pdf5 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Navin Harilal Minat.pdf5 Jul 2023
Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf5 Jul 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report with respect to model copy of agreement for sale compressed.pdf5 Jul 2023
Other - TechnicalFile: Agreement to lease plot no 10B sector 18 ulwe.pdf4 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3, Rera, CA Certificate.pdf3 Jul 2023
Layout approvalFile: CC plans Devpriya-1.pdf26 Jun 2023
Building plan approvalFile: CC plans Devpriya-2.pdf26 Jun 2023
Building plan approvalFile: CC plans Devpriya-3.pdf26 Jun 2023
Building plan approvalFile: CC plans Devpriya-4.pdf26 Jun 2023
Copy of Layout Approval (in case of layout)File: CC plans Devpriya-1.pdf26 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: CC plans Devpriya-2.pdf26 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: CC plans Devpriya-3.pdf26 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: CC plans Devpriya-4.pdf26 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: Devpriya CC.pdf26 Jun 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf26 Jun 2023
Declaration in FORM BFile: Affidavit cum Declaration Form B.pdf26 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1, Rera Architect's Certificate.pdf26 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 Engineer Certificate.pdf26 Jun 2023
CERSAI detailsFile: CERSAI_Search_Report_200272605532_For_Asset_Based_Search_26_06_2023_18_19_07_007.pdf26 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure A- Vipul Minat.pdf26 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Haresh D minat.pdf26 Jun 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf26 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration About Separate Bank Account.pdf26 Jun 2023
Deviation Report with respect to Allotment letterFile: Deviation report with respect to allotment letter.pdf26 Jun 2023
PAN CardFile: PAN Shree Chamunda Realty.pdf6 Jun 2023

How this compares with Raigarh

70%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Devpriya on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sector-185,900+ in Raigarh

2 kmDevpriyaCompleted 124Lapsed / revoked 41Other 127Dot size: filed unitsN

Filed coordinates, straight-line distance. 292 registered projects within 2 km.

Builder: SHREE CHAMUNDA REALTY

SHREE CHAMUNDA REALTY has 2 registrations on MahaRERA, including DAMODARPRIYA and Devpriya. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Devpriya is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Devpriya?

The registered promoter entity is SHREE CHAMUNDA REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Devpriya?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Devpriya?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Devpriya?

The professionals named in the filing: Architect: Atul Patel Architects; Engineer: B S Sukthankar & Associates; Engineer: Mahesh A Bagade; Engineer: Prakash Bahuleyan; Chartered Accountant: R V Thakkar & Associates Chartered Accountants; Chartered Accountant: L K Dedhia & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Devpriya?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Devpriya. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Devpriya to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.