Red flags
- Completion date moved by 25 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DEVKRUPA CO-OPERATIVE SOCIETY LTD is a Others project by SHREE JALARAM BUILDERS & DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800031248 on 15 Oct 2021. The registration is recorded completed; possession was promised by 12 Jun 2025. The completion date has moved by 25 months from the original filing. 7 of the 22 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.
At a glance
Project
- NameDEVKRUPA CO-OPERATIVE SOCIETY LTD
- TypeOthers
- Location
- F P NO 772 S V ROAD
- BORIVALI WEST
- Borivali
- Mumbai Suburban
- 400092
- Pincode400092
- RERA no.P51800031248
- ReraGenie IDRG-MH-49951
Builder
- NameSHREE JALARAM BUILDERS & DEVELOPERS
- Entity typePartnership
- GSTIN27ABYFS8469G1Z3
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersMAHENDRA AMBALAL PATEL, HARISHBHAI RANCHHODBHAI SOJITRA
- Other registrations1 more →
- Completed1 of 2
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on15 Oct 2021
- Promised completion12 Jun 2025
- Revised completionRevised to 12 Jun 2025 (originally 15 May 2023)
- Buildings1 building record
- Documents filed97 files
Current status
Figures as on 26 Jun 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| DEVKRUPA CO-OPERATIVE SOCIETY LTD | NA | 15 | 15 | 15 | 7 | 22 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 26 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
DEVKRUPA CO-OPERATIVE SOCIETY LTD: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 26 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed40
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| DEV KRUPA CO OP HSG SOC LTD | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ASHOK GANDHI CONSULTANTS LLP |
| Engineer | MINESH SHAH |
| Chartered Accountant | KANKOTIYA & CO |
| Chartered Accountant | VINODRAY DONGA |
| Partner | Role in project |
|---|---|
| SHREE JALARAM BUILDERS & DEVELOPERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterProject Completion delayed due to financial reasons
Reason as filed by the promoterPart OC upto 12th Floor was received on 08th February 2024, But Full OC delayed due to Parking Installation
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Oct 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Oct 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Oct 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed97
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Arch Certificate 31-03-2024.pdf | 26 Jun 2025 |
| Form 2File: Er Certificate 31-3-24.pdf | 26 Jun 2025 |
| Form 3File: compressed_Form -3 Date 31032024.pdf | 26 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold-Unsold Inventory-31-3-24.pdf | 26 Jun 2025 |
| Form 1File: Architech Certificate 300624.pdf | 26 Jun 2025 |
| Form 2File: Form -2 30062024.pdf | 26 Jun 2025 |
| Form 3File: Form -3 30062024.pdf | 26 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold-30-6-24.pdf | 26 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold-30-9-24.pdf | 26 Jun 2025 |
| Form 1File: Architech Certificate 30924.pdf | 26 Jun 2025 |
| Form 2File: Form -2 30092024.pdf | 26 Jun 2025 |
| Form 3File: Form -3 30092024.pdf | 26 Jun 2025 |
| Form 3File: Form -3 31122024.pdf | 26 Jun 2025 |
| Form 1File: Architech Certificate 311224.pdf | 26 Jun 2025 |
| Form 2File: Form -2 31122024.pdf | 26 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold-31-12-24.pdf | 26 Jun 2025 |
| Form 1File: Architech Certificate 310325.pdf | 26 Jun 2025 |
| Form 2File: Form -2 31032025.pdf | 26 Jun 2025 |
| Form 3File: form-3 31032025.pdf | 26 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Discolsure of sold ulsold 31325.pdf | 26 Jun 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A FY 2024-25.pdf | 26 Jun 2025 |
| Form 2A (FY 2025-2026)File: Form 2A FY 2025-26.pdf | 26 Jun 2025 |
| Form 5 (FY 2024-2025)File: Form-5 FY 2024-25.pdf | 26 Jun 2025 |
| Occupational CertificateFile: Full Occupation 12-06-2025.pdf | 26 Jun 2025 |
| Form 1File: Arch Certificate 31-12-2021.pdf | 21 Jun 2025 |
| Form 2File: Er Certificate 31-12-21.pdf | 21 Jun 2025 |
| Form 3File: Form -3 Date 31122021_compressed.pdf | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold-Unsold Inventory-31-12-21.pdf | 21 Jun 2025 |
| Form 1File: Arch Certificate 31-03-2022.pdf | 21 Jun 2025 |
| Form 2File: Er Certificate 31-3-22.pdf | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold-Unsold Inventory-31-3-22.pdf | 21 Jun 2025 |
| Form 3File: compressed_Form -3 Date 31032022.pdf | 21 Jun 2025 |
| Form 1File: Arch Certificate 30-06-2022.pdf | 21 Jun 2025 |
| Form 2File: Er Certificate 30-6-22.pdf | 21 Jun 2025 |
| Form 3File: compressed_Form -3 Date 300622.pdf | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold-Unsold Inventory-30-6-22.pdf | 21 Jun 2025 |
| Form 1File: Arch Certificate 30-09-2022.pdf | 21 Jun 2025 |
| Form 2File: Er Certificate 30-9-22.pdf | 21 Jun 2025 |
| Form 3File: compressed_Form -3 Date 3009022.pdf | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold-Unsold Inventory-30-9-22.pdf | 21 Jun 2025 |
| Form 1File: Arch Certificate 31-12-2022.pdf | 21 Jun 2025 |
| Form 2File: Er Certificate 31-12-22.pdf | 21 Jun 2025 |
| Form 3File: compressed_Form -3 Date 311222.pdf | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold-Unsold Inventory-31-12-22.pdf | 21 Jun 2025 |
| Form 1File: Arch Certificate 31-03-2023.pdf | 21 Jun 2025 |
| Form 2File: Er Certificate 31-3-23.pdf | 21 Jun 2025 |
| Form 3File: compressed_Form -3 Date 31032023.pdf | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold-Unsold Inventory-31-3-23.pdf | 21 Jun 2025 |
| Form 1File: Arch Certificate 30-06-2023.pdf | 21 Jun 2025 |
| Form 2File: Er Certificate 30-6-23.pdf | 21 Jun 2025 |
| Form 3File: compressed_Form -3 Date 30062023.pdf | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold-Unsold Inventory-30-6-23.pdf | 21 Jun 2025 |
| Form 1File: Arch Certificate 30-09-2023.pdf | 21 Jun 2025 |
| Form 2File: Er Certificate 30-9-23.pdf | 21 Jun 2025 |
| Form 3File: compressed_Form -3 Date 30092023.pdf | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold-Unsold Inventory-30-9-23.pdf | 21 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold-Unsold Inventory-31-12-23.pdf | 21 Jun 2025 |
| Form 1File: Arch Certificate 31-12-2023.pdf | 21 Jun 2025 |
| Form 2File: Er Certificate 31-12-23.pdf | 21 Jun 2025 |
| Form 3File: compressed_Form -3 Date 31122023.pdf | 21 Jun 2025 |
| Form 2A (FY 2021-2022)File: Form 2A 31-03-2022.pdf | 21 Jun 2025 |
| Form 2A (FY 2022-2023)File: Form 2A 31-03-2023 new.pdf | 21 Jun 2025 |
| Form 2A (FY 2023-2024)File: Form 2A 31-03-2024 new.pdf | 21 Jun 2025 |
| Form 5 (FY 2021-2022)File: Form -5 FY 21-22.pdf | 21 Jun 2025 |
| Form 5 (FY 2022-2023)File: Form -5 FY 22-23.pdf | 21 Jun 2025 |
| Form 5 (FY 2023-2024)File: Form -5 FY 23-24.pdf | 21 Jun 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Jalaram Revalidated CC.pdf | 19 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: edited_Jalaram fORM 1.pdf | 19 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: edited_Jalaram fORM 2.pdf | 19 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: edited_Soldunsold.pdf | 19 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: edited_Jalaram fORM 3_11zon.pdf | 19 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SJBD.pdf | 21 Feb 2023 |
| Layout approvalFile: Layout1.pdf | 6 Oct 2021 |
| Layout approvalFile: Layout2.pdf | 6 Oct 2021 |
| Building plan approvalFile: iod.pdf | 6 Oct 2021 |
| Layout approvalFile: Layout3.pdf | 6 Oct 2021 |
| Layout approvalFile: Layout4.pdf | 6 Oct 2021 |
| Layout approvalFile: Layout5.pdf | 6 Oct 2021 |
| Layout approvalFile: Layout6.pdf | 6 Oct 2021 |
| Layout approvalFile: Layout7.pdf | 6 Oct 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| THE BOB EMPLOYEES AMARJYOTI CHS LTD | F P NO 719-6 KASTUR PARK SHIMPOLI BORIVALI WEST MUMBAI 400092 | 76 | Completed | Dec 2017 | Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 97 filed documents as one ZIP, foldered, with a manifest
Keep DEVKRUPA CO-OPERATIVE SOCIETY LTD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BORIVALI WEST6,700+ in Mumbai Suburban
Hiranandani Bluecrest
SHODEN DEVELOPERS PRIVATE LIMITED
KANAKIA PRIVAASA TOWER 1 & 2
KANAKIA TRANSPARENT DEVELOPERS PRIVATE LIM
BHOOMI AIRAVAT
Bhoomi Shashwat Estate Private limited
Shraddha Paradise
Shraddha Prime Projects Limited
UNIQUE REGALIA
UNIQUE SHANTI DEVELOPERS LLP
NICCO VANASHRI AND NICCO HEIGHTS
NEW INDIA CONSTRUCTION COMPANY
See every Mumbai Suburban project, with the district possession charts
Builder: SHREE JALARAM BUILDERS & DEVELOPERS
SHREE JALARAM BUILDERS & DEVELOPERS has 2 registrations on MahaRERA, including DEVKRUPA CO-OPERATIVE SOCIETY LTD and KANDIVALI MATRU ASHISH CHSL. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if DEVKRUPA CO-OPERATIVE SOCIETY LTD is delayed beyond 12 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DEVKRUPA CO-OPERATIVE SOCIETY LTD?
The registered promoter entity is SHREE JALARAM BUILDERS & DEVELOPERS, a partnership as per the filing. Its GSTIN 27ABYFS8469G1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DEVKRUPA CO-OPERATIVE SOCIETY LTD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DEVKRUPA CO-OPERATIVE SOCIETY LTD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DEVKRUPA CO-OPERATIVE SOCIETY LTD?
The professionals named in the filing: Architect: ASHOK GANDHI CONSULTANTS LLP; Engineer: MINESH SHAH; Chartered Accountant: KANKOTIYA & CO; Chartered Accountant: VINODRAY DONGA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DEVKRUPA CO-OPERATIVE SOCIETY LTD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback