Home / Browse projects / Raigarh, Maharashtra / DEVASHREE AANGAN
DEVASHREE AANGAN
RG-MH-41344 · RERA P52000013414 · Last updated on MahaRERA portal: 29 Sep 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 3 complaints at MahaRERA
- Completion date moved by 34 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DEVASHREE AANGAN is a Residential / Group Housing project by SHASHIKANT MARUTI DISALE in Raigarh, Maharashtra, registered with MahaRERA as P52000013414 on 5 Oct 2017. Possession is promised by 29 Dec 2026. The completion date has moved by 34 months from the original filing. 33 of the 51 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 3 complaints are on record with the regulator.
At a glance
Project
- NameDEVASHREE AANGAN
- TypeResidential / Group Housing
- Location
- Survey No. 27/0
- Village Khanav
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000013414
- ReraGenie IDRG-MH-41344
Builder
- NameSHASHIKANT MARUTI DISALE
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Oct 2017
- Promised completion29 Dec 2026
- Revised completionRevised to 29 Dec 2026 (originally 9 Feb 2024)
- Buildings1 building record
- Documents filed153 files
Current status
Figures as on 29 Sep 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| DEVASHREE AANGAN | NA | 5 | 4 | 51 | 0 | 51 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
DEVASHREE AANGAN: 55% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 29 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed148
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| DEVASHREE AANGAN | NA | Rs 4.02 cr | Rs 4.02 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | JITENDRA PARMAR AND ASSOCIATES |
| Engineer | YATEESH TARE Tare |
| Chartered Accountant | Keyur Bhayani and Associates |
| Partner | Role in project |
|---|---|
| SHASHIKANT MARUTI DISALE | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.
Reason as filed by the promoter1. 95% Project complete. 2. 69.7 Percent consent obtained 3. Due to Impact of Covid -19 Pandamic, Financial Constraint, Shortage of Skilled Labour and Construction Materail, Unfavouravle Market Condition these unavoidable circumstances, the project has been delayed. 4. The revised date of completion is now 29/12/2026. 5. QPR till date updated, since there is no Tab to upload QPR from March 2025 uploaded here in other tab. 6. Since unable to update professional for Form 2A adn Form 5 update here. 7. We hereby assure the Hon’ble Authority that the project shall be fully completed within this sti
Complaints filed with MahaRERA3
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12502040 | Asmita Anand Dhale | SHASHIKANT MARUTI DISALE | 22/06/2025 |
| CC12504524 | AYESHA A GHADIGAONKAR | SHASHIKANT MARUTI DISALE | 18/12/2025 |
| CC12601501 | TUSHAR PRABHAKAR GONDHALI | SHASHIKAN MARUTI DISALE | 18/03/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Sep 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Sep 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Sep 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 29 Dec 2026
Documents filed153
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 153 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 Devashree Aangan December 2017.pdf | 29 Sep 2025 |
| Form 2File: Form 2 Devashree Aangan December 2017.pdf | 29 Sep 2025 |
| Form 3File: Disale Form 3 December 2017.pdf | 29 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Devashree Aangan December 2017.pdf | 29 Sep 2025 |
| Form 1File: Form 1 Devashree Aangan March 2018.pdf | 29 Sep 2025 |
| Form 2File: Form 2 Devashree Aangan March 2018.pdf | 29 Sep 2025 |
| Form 3File: Form 3 Disale March 2018.pdf | 29 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Devashree March 2018.pdf | 29 Sep 2025 |
| Form 1File: Form 1 Devashree Aangan June 2018.pdf | 29 Sep 2025 |
| Form 2File: Form 2 Deveshree Aangan June 2018.pdf | 29 Sep 2025 |
| Form 3File: Form 3 Devashree Aangan June 2018.pdf | 29 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Devashree Aangan June 2018.pdf | 29 Sep 2025 |
| Form 1File: Form 1 Devashree Aangan September 2018.pdf | 29 Sep 2025 |
| Form 2File: Form 2 Devashree Aangan September 2018.pdf | 29 Sep 2025 |
| Form 3File: Form 3 Devashree Aangan Sept 2018.pdf | 29 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Devashree Aangan September 2018.pdf | 29 Sep 2025 |
| Form 1File: Form 1 Devashree Aangan December 2018.pdf | 29 Sep 2025 |
| Form 2File: Form 2 Devashree Aangan December 2018.pdf | 29 Sep 2025 |
| Form 3File: Form 3 Devashree Aangan December 2018.pdf | 29 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Devashree Aangan Dcember 2018.pdf | 29 Sep 2025 |
| Form 1File: Form 1 Devashree Aangan March 2019.pdf | 29 Sep 2025 |
| Form 2File: Form 2 Devashree Aangan March 2019.pdf | 29 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Devashree March 2019.pdf | 29 Sep 2025 |
| Form 3File: Form 3 Devashree Aangan March 2019.pdf | 29 Sep 2025 |
| Form 1File: Form 1 Devashree Aangan June 2019.pdf | 29 Sep 2025 |
| Form 2File: Form 2 Devashree Aangan June 2019.pdf | 29 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Devashree Aangan June 2019.pdf | 29 Sep 2025 |
| Form 3File: Form 3 Devashree Aangan June 2019.pdf | 29 Sep 2025 |
| Form 1File: Form 1 Devashree Aangan Sept 2019.pdf | 29 Sep 2025 |
| Form 2File: Form 2 Devashree Aangan Sept 2019.pdf | 29 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Devashree Aangan September 2019.pdf | 29 Sep 2025 |
| Form 3File: Form 3 Devashree Aangan Sept 2019.pdf | 29 Sep 2025 |
| Form 1File: Form 1 Devashree Aangan December 2019.pdf | 29 Sep 2025 |
| Form 2File: Form 2 Devashree Aangan December 2019.pdf | 29 Sep 2025 |
| Form 3File: Form 3 Devashree Aangan December 2019.pdf | 29 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Devashree Angan December 2019.pdf | 29 Sep 2025 |
| Form 1File: Form 1 Devashree Aangan March 2020.pdf | 29 Sep 2025 |
| Form 2File: Form 2 Devashree Aangan March 2020.pdf | 29 Sep 2025 |
| Form 3File: Form 3 Devashree Aangan March 2020.pdf | 29 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Devashree Aangan March 2020.pdf | 29 Sep 2025 |
| Form 1File: Form 1 Devashree Aangan June 2020.pdf | 29 Sep 2025 |
| Form 2File: Form 2 Devashree Aangan June 2020.pdf | 29 Sep 2025 |
| Form 3File: Form 3 Disale June 2020 (1).pdf | 29 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Deveshree Aangan June 2020.pdf | 29 Sep 2025 |
| Form 1File: Form 1 Devashree Aangan September 2020.pdf | 29 Sep 2025 |
| Form 2File: Form 2 Devashree Aangan September 2020 (2).pdf | 29 Sep 2025 |
| Form 3File: Form 3 Disale September 2020 (1).pdf | 29 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Devashree Aangan September 2020.pdf | 29 Sep 2025 |
| Form 1File: Form 1 Devashree Aangan December 2020.pdf | 29 Sep 2025 |
| Form 2File: Form 2 Devashree Aangan December 2020.pdf | 29 Sep 2025 |
| Form 3File: Form 3 Devashree Aangan December 2020.pdf | 29 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Devashree Angan December 2020.pdf | 29 Sep 2025 |
| Form 1File: Form 1 Devashree Aangan March 2021.pdf | 29 Sep 2025 |
| Form 2File: Form 2 Devashree Aangan March 2021.pdf | 29 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Devashree Angan March 2021.pdf | 29 Sep 2025 |
| Form 3File: Form 3 Devashree Aangan March 2021.pdf | 29 Sep 2025 |
| Form 1File: Form 1 Devashree Aangan June 2021.pdf | 29 Sep 2025 |
| Form 2File: Form 2 Devashree Aangan June 2021.pdf | 29 Sep 2025 |
| Form 3File: Form 3 Disale June 2021.pdf | 29 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold June 2021.pdf | 29 Sep 2025 |
| Form 1File: Form 1 Devashree Aangan September 2021 (1).pdf | 29 Sep 2025 |
| Form 2File: Form 2 Devashree Aangan September 2021 (1).pdf | 29 Sep 2025 |
| Form 3File: Form 3 Disale Developers September 2021.pdf | 29 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Disale September 2021.pdf | 29 Sep 2025 |
| Form 1File: Form 1 Devashree Aangan December 2021.pdf | 29 Sep 2025 |
| Form 2File: Form 2 Devashree Angan Decembeer 2021.pdf | 29 Sep 2025 |
| Form 3File: Form 3 Devashree Aangan Deceber 2021.pdf | 29 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Devashree Aangan December 2021.pdf | 29 Sep 2025 |
| Form 1File: Form 1 Devashree Aangan March 2022.pdf | 29 Sep 2025 |
| Form 2File: Form 2 Devashree Aangan March 2022.pdf | 29 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Devashree Angan March 2022.pdf | 29 Sep 2025 |
| Form 3File: Form 3 Devashree Aangan March 2022.pdf | 29 Sep 2025 |
| Form 1File: Form 1 Devashree Aangan June 2022.pdf | 29 Sep 2025 |
| Form 2File: Form 2 Devashree Aangan June 2022.pdf | 29 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Devashree Angan June 2022.pdf | 29 Sep 2025 |
| Form 3File: Form 3 Devashree Aangan June 2022.pdf | 29 Sep 2025 |
| Form 1File: Form 1 Devashree Aangan September 2022.pdf | 29 Sep 2025 |
| Form 2File: Form 2 Devashree Aangan September 2022.pdf | 29 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Devashree Angan September 2022.pdf | 29 Sep 2025 |
| Form 3File: Form 3 Devashree Aangan Sept 2022.pdf | 29 Sep 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 153 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep DEVASHREE AANGAN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Village Khanav5,900+ in Raigarh
Filed coordinates, straight-line distance. 402 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: SHASHIKANT MARUTI DISALE
SHASHIKANT MARUTI DISALE has 1 registration on MahaRERA, including DEVASHREE AANGAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if DEVASHREE AANGAN is delayed beyond 29 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DEVASHREE AANGAN?
The registered promoter entity is SHASHIKANT MARUTI DISALE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DEVASHREE AANGAN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against DEVASHREE AANGAN?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for DEVASHREE AANGAN?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DEVASHREE AANGAN?
The professionals named in the filing: Architect: JITENDRA PARMAR AND ASSOCIATES; Engineer: YATEESH TARE Tare; Chartered Accountant: Keyur Bhayani and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DEVASHREE AANGAN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback