Home / Browse projects / Raigarh, Maharashtra / Devansh

Completed No litigation declared Residential / Group Housing project

Devansh

By Platinum Enterprise

RG-MH-06006 · RERA P52000052652 · Last updated on MahaRERA portal: 29 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Basement (if any), 0%
19 of 32Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 84 documents Report an error

Devansh is a Residential / Group Housing project by Platinum Enterprise in Raigarh, Maharashtra, registered with MahaRERA as P52000052652 on 15 Sep 2023. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 6 months from the original filing. 13 of the 32 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameDevansh
  • TypeResidential / Group Housing
  • Location
    • Sector No-07
    • New Panvel West
    • New Panvel
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000052652
  • ReraGenie IDRG-MH-06006

Builder

  • NamePlatinum Enterprise
  • Entity typePartnership
  • PartnersVishal Suresh Chaudhari, Suresh Devram Chaudhari, Sanjay Chaturbhai Patel, Devraj Yogesh Thakkar, Sanjay Dineshkumr Pasoria, Niraj Ramakant Sharma

Key dates

this monthRegisteredSep 2023First promiseDec 2025Revised toJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Sep 2023
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed84 files

Current status

41%13 of 32 units booked
100.0%Work done, per cost certificate

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing A and Wing BNA7632032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Wing A and Wing B: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed39

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots39
Closed/Covered24
Open Space15

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area726 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on26 May 2026

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI2149.16
Proposed, not sanctioned1,857 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNirman CHS, Shop No-3 Sec 13 Khanda Colony, New Panvel, Navi Mumbai Raigad Maharashtra 410206
Estimated costRs 5.62 cr
Cost incurredRs 5.62 cr
Work done100.0%
BuildingWingEstimatedIncurred
Wing A and Wing BNARs 5.51 crRs 5.51 cr
-NARs 11.25 lakhRs 11.25 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPMA Architects
EngineerSK Consultants & Engineers
EngineerPankaj Pasoria
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantPratiksha Tulshyan & Associates
Chartered AccountantNB Sayed & Associates
PartnerRole in project
Platinum Enterprise-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA28112518460Dec 2025 → Jun 2026

Reason as filed by the promoterThe construction of the project is almost completed. However, the Planning Authority has not yet issued the Occupancy Certificate (OC) as the installation of fire-fighting equipment is still in progress. We are currently completing the installation of the required fire extinguishers and related fire-safety systems. Once this work is fully completed, we will immediately apply for the Occupancy Certificate. Considering the time required to complete the remaining fire-safety installations and to obtain the OC from the Planning Authority, we anticipate required the extension up to 30/06/2026.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Aug 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Aug 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed84

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: PE_Form 2A_25-26.pdf29 Jun 2026
Occupational CertificateFile: Occupancy Certificate.pdf27 May 2026
Occupational CertificateFile: Commencement Certificate.pdf27 May 2026
Occupational CertificateFile: Sanctioned Plan.pdf27 May 2026
Occupational CertificateFile: OC Verification Mail Screenshot.pdf27 May 2026
Withdrawal Update Form 1File: form 1 of Devansh as on 31-03-2026.pdf12 May 2026
Withdrawal Update Form 2File: Form 2 of Devansh as on 31-03-2026.pdf12 May 2026
Withdrawal Update Form 3File: Form 3 of Devansh as on 31-03-2026.pdf12 May 2026
Withdrawal Update Form 1File: Form 1 - Devansh as on Dec 2025.pdf7 Feb 2026
Withdrawal Update Form 2File: Form 2 - Devansh as on Dec 2025.pdf7 Feb 2026
Withdrawal Update Form 3File: Form 3 - Devansh as on Dec 2025.pdf7 Feb 2026
Withdrawal Update Form 1File: Form 1 - Devansh as on Sep 2025.pdf22 Oct 2025
Withdrawal Update Form 2File: Form 2 - Devansh as on Sept 2025.pdf22 Oct 2025
Withdrawal Update Form 3File: Form 3 - Devansh as on Sept 2025.pdf22 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 - Devansh - FY 2024-2025.pdf30 Sep 2025
Building plan approvalFile: PLAN - 30-05-2025 - Marked.pdf4 Aug 2025
Withdrawal Update Form 1File: Form 1 - Jun 2025.pdf4 Aug 2025
Withdrawal Update Form 2File: Form 2 - Jun 2025.pdf4 Aug 2025
Withdrawal Update Form 3File: Form 3 - June 2025 - Revised SIGNED.pdf4 Aug 2025
Layout approvalFile: PLAN - 30-05-2025.pdf2 Aug 2025
Commencement certificateFile: CC - 30-05-2025.pdf2 Aug 2025
Form 2A (FY 2023-2024)File: Form 2A - 2023-24.pdf30 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A - 2024-25.pdf30 Jul 2025
Form 5 (FY 2023-2024)File: Form 5 - 2023-24.pdf30 Jul 2025
Withdrawal Update Form 1File: Form 1 - Devansh as on June 2024.pdf4 Jul 2025
Withdrawal Update Form 2File: Form 2 - Devansh as on June 2024.pdf4 Jul 2025
Withdrawal Update Form 3File: Form 3 of Devansh as on 30-06-2024.pdf4 Jul 2025
Layout approvalFile: PLAN.pdf18 Jun 2025
Building plan approvalFile: PLAN.pdf18 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Devansh as on 31-03-2025.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Devansh as on March 2025.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Devansh as on March 2025.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Devansh as on 31-12-2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Devansh as on 31-12-2024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Devansh as on Dec 2024.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Circular 29 - Devansh as on Sep 2024.pdf4 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Devansh as on Sep 2024.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Devansh as on 30th September 2024.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Devansh as on Sep 2024.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DEVANSH ARCHITECT CERTIFICATE FORM Sep 2024.pdf8 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Certified Form 5 of Devansh - FY 2023-24.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Devansh as on June 2024.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Devansh as on June 2024.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Devansh as on 30-06-2024.pdf18 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: DECLARATION OF COMPLAINT REDRESSAL CELL.pdf2 Jul 2024
Disclosure of sold/ booked inventoryFile: DEVANSH SOLD UNSOLD LIST.pdf5 Jun 2024
Proforma of Agreement for saleFile: AFS - Devansh.pdf27 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Devansh as on March 2024.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Devansh as on 31-03-2024.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Devansh as on March 2024.pdf18 Apr 2024
Details of encumbrances concerned to FinanceFile: Encumbrance - Devansh.pdf6 Apr 2024
Details of encumbrances concerned to LegalFile: Encumbrance - Devansh.pdf6 Apr 2024
Layout approvalFile: ilovepdf_merged.pdf30 Jan 2024
Copy of Layout Approval (in case of layout)File: ilovepdf_merged.pdf30 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: Devansh - CC 11-01-2024.pdf29 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Devansh as on Dec 2023.pdf9 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 of Devansh as on 30-09-2023.pdf9 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Devansh as on Dec 2023.pdf9 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Devansh as on 30-09-2023.pdf9 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Devansh as on 31-12-2023.pdf9 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Devansh as on September 2023.pdf29 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 of Devansh as on 30-09-2023.pdf20 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Devansh as on 30-09-2023.pdf20 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: First Form 3 of Devansh.pdf28 Jul 2023
Copy of the legal title reportFile: DOC004 (1)_11zon.pdf20 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow20 Jul 2023
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (2).pdf3 Jun 2023
Details of encumbrances concerned to FinanceFile: 2 b Details of encumbrances concerned to Legal (1).pdf3 Jun 2023
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance (2).pdf3 Jun 2023
Details of encumbrances concerned to LegalFile: 2 b Details of encumbrances concerned to Legal (1).pdf3 Jun 2023
Declaration in FORM BFile: Form B 1st page_merged (1)_11zon.pdf3 Jun 2023
CERSAI detailsFile: 1 CERSAI details (1).pdf3 Jun 2023
PAN CardFile: Pan of Firm (1).pdf1 Jun 2023
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate.pdf1 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (2).pdf1 Jun 2023
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter (3).pdf1 Jun 2023
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement (3).pdf1 Jun 2023
Proforma of Agreement for saleFile: AFS_Devansh_Platinum_Enterprise.pdf31 May 2023
Proforma of Allotment letterFile: Allotment Letter_Devansh_Platinum_Enterprise.pdf31 May 2023
Layout approvalFile: dEVANSH pLAN.pdf30 May 2023

How this compares with Raigarh

41%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 6 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Devansh on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near New Panvel West5,900+ in Raigarh

2 kmDevanshCompleted 49Lapsed / revoked 13Other 71Dot size: filed unitsN

Filed coordinates, straight-line distance. 133 registered projects within 2 km.

Builder: Platinum Enterprise

Platinum Enterprise has 1 registration on MahaRERA, including Devansh. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Devansh is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Devansh?

The registered promoter entity is Platinum Enterprise, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Devansh?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Devansh?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Devansh?

The professionals named in the filing: Architect: PMA Architects; Engineer: SK Consultants & Engineers; Engineer: Pankaj Pasoria; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: Pratiksha Tulshyan & Associates; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Devansh?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Devansh. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Devansh to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.