Home / Browse projects / Thane, Maharashtra / DEVANSH GALAXY

Completed No litigation declared Residential / Group Housing project

DEVANSH GALAXY

By MOHAN NANA ADHIKARI

RG-MH-53680 · RERA P51700047077 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
May 2026Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
5 of 22Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 133 documents Report an error

DEVANSH GALAXY is a Residential / Group Housing project by MOHAN NANA ADHIKARI in Thane, Maharashtra, registered with MahaRERA as P51700047077 on 29 Sep 2022. The registration is recorded completed; possession was promised by 23 May 2026. The completion date has moved by 12 months from the original filing. 17 of the 22 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameDEVANSH GALAXY
  • TypeResidential / Group Housing
  • Location
    • Kalambhe
    • Shahapur
    • Thane
    • 421601
  • Pincode421601
  • RERA no.P51700047077
  • ReraGenie IDRG-MH-53680

Builder

  • NameMOHAN NANA ADHIKARI
  • Entity typeIndividual

Key dates

this monthRegisteredSep 2022First promiseMay 2025Revised toMay 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Sep 2022
  • Promised completion23 May 2026
  • Revised completionRevised to 23 May 2026 (originally 25 May 2025)
  • Buildings1 building record
  • Documents filed133 files

Current status

77%17 of 22 units booked
100.0%Work done, per cost certificate

Figures as on 15 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Devansh GalaxyNA6619322

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Devansh Galaxy: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed35

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots35
Closed/Covered8
Open Space27

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area685 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1534.26
Proposed, not sanctioned1,534 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop no 9,10 and 11, Shree Narayan Chs Ltd, Asangaon Shahapur Road, Kalambhe, Tal Shahapur, 421601
Estimated costRs 4.50 cr
Cost incurredRs 4.50 cr
Work done100.0%
BuildingWingEstimatedIncurred
Devansh GalaxyNARs 3.75 crRs 3.75 cr
-NARs 75.00 lakhRs 75.00 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUnicorne Group
EngineerUnicorne Group
EngineerZainuddin H Tole Tole
Chartered AccountantPrashant Raghuram Prabhu
Chartered AccountantKishor Madhukar Phaltankar
Chartered Accountantishwar kashinath Kadav
PartnerRole in project
MOHAN NANA ADHIKARI-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700028331May 2025 → Nov 2025

Reason as filed by the promoterWe would like to bring to your kind attention that despite our best efforts to complete the project within the stipulated timeline, we are experiencing some delay in construction progress due to an ongoing shortage of skilled and unskilled labour. This shortage has impacted the execution of critical construction activities and disrupted our planned workflow.Moreover due to severe flood-like conditions experienced in the area during July 2024, construction activities at the project site were significantly hampered. We are actively working to resolve the issue and mobilize an adequate workforce.

EA02032620065May 2025 → May 2026

Reason as filed by the promoterThe Project completion date as per RERA registration is 24.11.2025. The construction of the project was completed prior to the said date. The Promoter had also applied for issuance of Occupancy Certificate before 24.11.2025. However, due to procedural and administrative delays at the end of the concerned statutory authority, the Occupancy Certificate was issued on 12.02.2026. The delay is solely attributable to the statutory authority and beyond the control of the Promoter. Hence, extension of registration is sought under RERA to complete the compliance process

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed133

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 133 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Occupancy Certificate.pdf15 May 2026
Withdrawal Update Form 1File: Form 1 -Q4.pdf17 Apr 2026
Withdrawal Update Form 2File: Form 2 Q-4.pdf17 Apr 2026
Withdrawal Update Form 3File: Form 3 Q-4.pdf17 Apr 2026
Withdrawal Update Form 1File: Form 1 Q-1.pdf26 Nov 2025
Withdrawal Update Form 1File: Form 1 Q-2.pdf26 Nov 2025
Withdrawal Update Form 1File: Form 1 Q-3.pdf26 Nov 2025
Withdrawal Update Form 2File: Form 2 Q-1.pdf26 Nov 2025
Withdrawal Update Form 2File: Form 2 Q-2.pdf26 Nov 2025
Withdrawal Update Form 2File: Form 2 Q-3.pdf26 Nov 2025
Withdrawal Update Form 3File: Form 3 Q-1.pdf26 Nov 2025
Withdrawal Update Form 3File: Form 3 Q-2.pdf26 Nov 2025
Withdrawal Update Form 3File: Form 3 Q-3.pdf26 Nov 2025
Form 2A (FY 2025-2026)File: Form 2A.pdf26 Nov 2025
Form 1File: form 1.pdf24 Nov 2025
Form 2File: form 2.pdf24 Nov 2025
Form 3File: form 3.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold -Un sold Inventory.pdf24 Nov 2025
Form 1File: form 1.pdf24 Nov 2025
Form 2File: form 2.pdf24 Nov 2025
Form 3File: form 3.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold -Un sold Inventory.pdf24 Nov 2025
Form 1File: form 1.pdf24 Nov 2025
Form 2File: form 2.pdf24 Nov 2025
Form 3File: form 3.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold -Un sold Inventory.pdf24 Nov 2025
Form 1File: Form 1 (30-06-2023).pdf24 Nov 2025
Form 2File: Form 2 (30-06-2023).pdf24 Nov 2025
Form 3File: Form 3 (30-06-2023).pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory- 30 06 2023.pdf24 Nov 2025
Form 1File: Form 1 (30-09-2023).pdf24 Nov 2025
Form 2File: Form 2 (30-09-2023).pdf24 Nov 2025
Form 3File: Form 3 (30-09-2023).pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold Inventory - 30 09 2023.pdf24 Nov 2025
Form 1File: Form 1 (31-12-2023).pdf24 Nov 2025
Form 2File: Form 2 (31-12-2023).pdf24 Nov 2025
Form 3File: Form 3 (31-12-2023).pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Un sold inventory- 31 12 2023.pdf24 Nov 2025
Form 1File: Form 1 (31-03-2024).pdf24 Nov 2025
Form 2File: Form 2 (31-03-2024).pdf24 Nov 2025
Form 3File: Form 3 (31-03-2024)_compressed.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold inventory- 31 03 2024.pdf24 Nov 2025
Form 1File: Architect Certificate - 31 03 2025.pdf24 Nov 2025
Form 2File: Form 2 Engineer Certificate.pdf24 Nov 2025
Form 3File: Form 3 CA Certificate .pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold.pdf24 Nov 2025
Form 1File: Form 1 (30-06-2024).pdf24 Nov 2025
Form 2File: Form 2 (30-06-2024).pdf24 Nov 2025
Form 3File: from-3 30-06-2024.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold- 30 06 2024.pdf24 Nov 2025
Form 1File: Form 1(30-09-2024).pdf24 Nov 2025
Form 2File: Form 2 (30-09-2024).pdf24 Nov 2025
Form 3File: form-3 30-9-2024.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold- 30 09 2024.pdf24 Nov 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold-31 12 2024.pdf24 Nov 2025
Form 1File: Form 1(31-12-2024).pdf24 Nov 2025
Form 2File: Form 2 (31-12-2024).pdf24 Nov 2025
Form 3File: form-3 31-12-2024.pdf24 Nov 2025
Withdrawal Update Form 1File: form 1.pdf24 Nov 2025
Withdrawal Update Form 1File: form 1.pdf24 Nov 2025
Withdrawal Update Form 1File: form 1.pdf24 Nov 2025
Withdrawal Update Form 2File: form 2.pdf24 Nov 2025
Withdrawal Update Form 2File: form 2.pdf24 Nov 2025
Withdrawal Update Form 2File: form 2.pdf24 Nov 2025
Withdrawal Update Form 3File: form 3.pdf24 Nov 2025
Withdrawal Update Form 3File: form 3.pdf24 Nov 2025
Withdrawal Update Form 3File: form 3.pdf24 Nov 2025
Form 2A (FY 2022-2023)File: Form 2A - Quality Assurance Certificate 31-03-2023.pdf24 Nov 2025
Form 2A (FY 2023-2024)File: Form 2A Quality Assurance Certificate 31-03-2024.pdf24 Nov 2025
Form 2A (FY 2024-2025)File: Form 2A Quality Assurance Certificate 31-03-2025.pdf24 Nov 2025
Form 5 (FY 2024-2025)File: Form 5.pdf24 Nov 2025
Form 5 (FY 2022-2023)File: form 5.pdf21 Nov 2025
Form 5 (FY 2023-2024)File: Form 5-Scan Copy-17-01-2024.pdf21 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - 31 03 2025.pdf6 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate .pdf5 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf5 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Quality Assurance Certificate 31-03-2023.pdf5 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance Certificate 31-03-2024.pdf5 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance Certificate 31-03-2025.pdf5 Jun 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold.pdf4 Jun 2025

How this compares with Thane

77%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DEVANSH GALAXY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shahapur7,600+ in Thane

Builder: MOHAN NANA ADHIKARI

MOHAN NANA ADHIKARI has 1 registration on MahaRERA, including DEVANSH GALAXY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if DEVANSH GALAXY is delayed beyond 23 May 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DEVANSH GALAXY?

The registered promoter entity is MOHAN NANA ADHIKARI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DEVANSH GALAXY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DEVANSH GALAXY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DEVANSH GALAXY?

The professionals named in the filing: Architect: Unicorne Group; Engineer: Unicorne Group; Engineer: Zainuddin H Tole Tole; Chartered Accountant: Prashant Raghuram Prabhu; Chartered Accountant: Kishor Madhukar Phaltankar; Chartered Accountant: ishwar kashinath Kadav. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DEVANSH GALAXY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DEVANSH GALAXY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DEVANSH GALAXY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.