Home / Browse projects / Thane, Maharashtra / DELTA VRINDAVAN

Completed No litigation declared Others project

DELTA VRINDAVAN

By Delta venture

RG-MH-27036 · RERA P51700009969 · Last updated on MahaRERA portal: 3 Dec 2022

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2021Possession promisedregistration recorded completed
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
2Complaints at MahaRERAon this registration
Jump to the 29 documents Report an error

DELTA VRINDAVAN is a Others project by Delta venture in Thane, Maharashtra, registered with MahaRERA as P51700009969 on 23 Aug 2017. The registration is recorded completed; possession was promised by 31 Mar 2021. The completion date has moved by 6 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameDELTA VRINDAVAN
  • TypeOthers
  • Location
    • MIRA ROAD
    • MAHAJANWADI
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401104
  • Pincode401104
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700009969
  • ReraGenie IDRG-MH-27036

Builder

  • NameDelta venture
  • Entity typeOthers
  • Named personsASHRAFALI V MOMIN, ALIMOHMED KADIWAL, RAHEMTULLA A. KADIWALA, ALLAUDDIN N. KADIWALA
  • Other registrations2 more →
  • Completed3 of 3

Key dates

this monthRegisteredAug 2017First promiseSep 2020Revised toMar 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Aug 2017
  • Promised completion31 Mar 2021
  • Revised completionRevised to 31 Mar 2021 (originally 30 Sep 2020)
  • Buildings3 building records
  • Documents filed29 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DELTA VRINDAVAN E WINGNA250000
DELTA VRINDAVAN F WINGNA260000
DELTA VRINDAVAN G WINGNA260000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 3 Dec 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

DELTA VRINDAVAN E WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
DELTA VRINDAVAN F WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
DELTA VRINDAVAN G WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 3 Dec 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable
Club HouseYes100%

Parking filed101

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots101
Closed/Covered101
BuildingClosed/CoveredTotal
DELTA VRINDAVAN E WING7070
DELTA VRINDAVAN F WING3131

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,626 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI19863.18
Proposed, not sanctioned19,863 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJOGESHWARI WEST

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAvinash Mhatre & Associates
EngineerDAMLE & THAKURDESAI
PartnerRole in project
Delta venture-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700006295Sep 2020 → Mar 2021

Reason as filed by the promoterThe building plans for the proposed project were approved and CC was issued by MBMC on 31.03.2016. As on today the construction work of building is completed in all respects as per the sanctioned plans and necessary compliance for grant of OCC are complied with and accordingly application for OCC has been submitted to MBMC for their approval and the same is awaited. The proposed project is registered under Rera under No. P51700009969 with validity period upto 31.03.2020. There is a revision of project registration validity for six month as per MahaRera order dated 02.04.2020 & 18.05.2020. As M

Litigation declared2

CaseCourtStatus
3523/2017BOMBAY HIGH COURTHIGH ON BOARD
3523/2017BOMBAY HIGH COURTDISPOSED OFF

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC006000000161331KAMAL GUPTAM/s Delta Venture11/11/2019
CC12504126Delta Vrindavan CHS LtdDelta venture23/11/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Dec 2020

Documents filed29

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 VRINDAVAN 2019-20.pdf3 Dec 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Delta Vrindavan Society Certificate.pdf21 Jun 2021
Architect’s Certificate on Completion of Project (Form 4)File: FORM4.pdf31 May 2021
OtherFile: OC COPY.pdf4 Dec 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Delta Vrindawan-compressed.pdf3 Dec 2020
Layout approvalFile: aj.pdf29 Jul 2020
Copy of Layout Approval (in case of layout)File: aj.pdf29 Jul 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Delta Vrindavan Form 2A.pdf10 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: DELTA VRINDAVAN FORM 5 2018-19.pdf11 Nov 2019
Certificates of CA (Form 5)File: DELTA VRINDAVAN FORM 5 APRIL 17 TO MARCH 18.pdf24 Jul 2019
Commencement Certificates / NA Order for plotted developmentFile: compresspdf_PJA00Qn9.pdf28 Apr 2018
Details of encumbrancesFile: Sunday, July 30, 2017 (5).pdf30 Jul 2017
Declaration in FORM BFile: DELTA VRINDAVAN Affidavit cum Declaration for RERA.pdf30 Jul 2017
Certificates of CA (Form 3)File: CA Certificate DELTA VRINDAVAN.pdf30 Jul 2017
Proforma of Allotment letterFile: Allotment letter format.pdf30 Jul 2017
Building plan approvalFile: IOD Copy.pdf29 Jul 2017
Layout approvalFile: Layout APP.pdf29 Jul 2017
PAN CardFile: Delta Venture Pan Card.pdf29 Jul 2017
Copy of the legal title reportFile: Title Certificate.pdf29 Jul 2017
Details of encumbrancesFile: INDEX 2.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout APP.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOD Copy.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC4.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC5.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT’S CERTIFICATE E,F,G.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_DT_E.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_DT_F.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate_DT_G.pdf29 Jul 2017
Proforma of Allotment letterFile: DELTA VRINDAVAN Agreement.pdf29 Jul 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 6 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DELTA VRINDAVAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MAHAJANWADI7,600+ in Thane

2 kmDELTA VRINDAVANCompleted 174Lapsed / revoked 64Other 156Dot size: filed unitsN

Filed coordinates, straight-line distance. 394 registered projects within 2 km.

Builder: Delta venture

Delta venture has 3 registrations on MahaRERA, including DELTA VRINDAVAN and DELTA GARDEN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if DELTA VRINDAVAN is delayed beyond 31 Mar 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DELTA VRINDAVAN?

The registered promoter entity is Delta venture, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DELTA VRINDAVAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against DELTA VRINDAVAN?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for DELTA VRINDAVAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DELTA VRINDAVAN?

The professionals named in the filing: Architect: Avinash Mhatre & Associates; Engineer: DAMLE & THAKURDESAI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DELTA VRINDAVAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DELTA VRINDAVAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DELTA VRINDAVAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.