DELTA VISTARA
By M/s. Shreenathji Enterprises
RG-MH-06843 · RERA P52000053608 · Last updated on MahaRERA portal: 27 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DELTA VISTARA is a Others project by M/s. Shreenathji Enterprises in Raigarh, Maharashtra, registered with MahaRERA as P52000053608 on 10 Nov 2023. Possession is promised by 31 Dec 2027. 219 of the 426 units on this registration are recorded sold or booked, and 6 of 53 construction stages are filed complete.
At a glance
Project
- NameDELTA VISTARA
- TypeOthers
- Location
- PLOT NO 02 + 03 SECTOR 26A PUSHPAK (VAHAL) NAVI MUMBAI
- Wahal
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000053608
- ReraGenie IDRG-MH-06843
Builder
- NameM/s. Shreenathji Enterprises
- Entity typePartnership
- GSTIN27ADQFS2196C1ZR
- PartnersPrashant Babubhai Gajipara, Nitin Babubhai Gajipara, Geetanjali Space Pvt Ltd Through its Partner Prashant B Gajipara
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on10 Nov 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings5 building records
- Documents filed84 files
Current status
Figures as on 27 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 16 | 14 | 98 | 8 | 106 |
| B WING | NA | 16 | 14 | 62 | 8 | 70 |
| C WING | NA | 16 | 14 | 73 | 8 | 81 |
| D WING | NA | 16 | 13 | 74 | 0 | 74 |
| E WING | NA | 16 | 14 | 87 | 8 | 95 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 27 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 53 construction stages are filed complete across 5 buildings. The stage furthest along is External plumbing and external plaster, at 90%.
A WING68%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B WING68%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
C WING68%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
D WING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
E WING0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 27 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed490
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Stilt / Ground | Basement | Total |
|---|---|---|---|---|
| A WING | 99 | 0 | 0 | 99 |
| B WING | 98 | 0 | 0 | 98 |
| C WING | 98 | 0 | 0 | 98 |
| D WING | 0 | 27 | 70 | 97 |
| E WING | 0 | 28 | 70 | 98 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 100.00 cr | Rs 69.80 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DIMENSIONS ARCHITECTS PVT LTD |
| Engineer | ANISH KUMAR YADAV |
| Chartered Accountant | CHETAN JOSHI AND CO |
| Chartered Accountant | CA Naina Jain |
| Chartered Accountant | Vallabh Vijay Joshi & Co Vallabh Vijay Joshi |
| Chartered Accountant | TEJAS METANGALE & CO |
| Partner | Role in project |
|---|---|
| M/s. Shreenathji Enterprises | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 May 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 May 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed84
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Layout approvalFile: Plan 1 - built up area tenement parking highlighted.pdf | 27 May 2026 |
| Building plan approvalFile: Plan 2 - 5.pdf | 27 May 2026 |
| Building plan approvalFile: Plan 6 - 10.pdf | 27 May 2026 |
| Building plan approvalFile: Plan 11 - 15.pdf | 27 May 2026 |
| Building plan approvalFile: Plan 16 - 19.pdf | 27 May 2026 |
| Building plan approvalFile: CC Plan Pl 2 and 3.pdf | 27 Apr 2026 |
| Building plan approval or NA orderFile: CC copy Pl 2 and 3.pdf | 27 Apr 2026 |
| Layout approvalFile: Layout Plan New Pl 2 and 3.pdf | 27 Apr 2026 |
| Building plan approvalFile: Rera Mail Pl 2 and 3.pdf | 27 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 From Architect Delta Vistara.pdf | 13 Apr 2026 |
| Withdrawal Update Form 2File: D Vistara Form No 2 Eng Certificate.pdf | 13 Apr 2026 |
| Withdrawal Update Form 3File: Delta Vistara Form 3 Q4 FY 2023-24.pdf | 13 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 From Architect Delta Vistara.pdf | 11 Mar 2026 |
| Withdrawal Update Form 1File: FORM 1 From Architect Delta Vistara.pdf | 11 Mar 2026 |
| Withdrawal Update Form 1File: FORM 1 From Architect Delta Vistara.pdf | 11 Mar 2026 |
| Withdrawal Update Form 1File: FORM 1 From Architect Delta Vistara.pdf | 11 Mar 2026 |
| Withdrawal Update Form 1File: FORM 1 From Architect Delta Vistara.pdf | 11 Mar 2026 |
| Withdrawal Update Form 2File: D Vistara Form No 2 Eng Certificate.pdf | 11 Mar 2026 |
| Withdrawal Update Form 2File: D Vistara Form No 2 Eng Certificate.pdf | 11 Mar 2026 |
| Withdrawal Update Form 2File: D Vistara Form No 2 Eng Certificate.pdf | 11 Mar 2026 |
| Withdrawal Update Form 2File: D Vistara Form No 2 Eng Certificate.pdf | 11 Mar 2026 |
| Withdrawal Update Form 2File: D Vistara Form No 2 Eng Certificate.pdf | 11 Mar 2026 |
| Withdrawal Update Form 3File: Delta Vistara Form 3 Q4 FY 2023-24.pdf | 11 Mar 2026 |
| Withdrawal Update Form 3File: Delta Vistara Form 3 Q4 FY 2023-24.pdf | 11 Mar 2026 |
| Withdrawal Update Form 3File: Delta Vistara Form 3 Q4 FY 2023-24.pdf | 11 Mar 2026 |
| Withdrawal Update Form 3File: Delta Vistara Form 3 Q4 FY 2023-24.pdf | 11 Mar 2026 |
| Withdrawal Update Form 3File: Delta Vistara Form 3 Q4 FY 2023-24.pdf | 11 Mar 2026 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vistara Form 3 - March 2025.pdf | 30 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Delta Vistara Form 1.pdf | 19 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Delta Vistara Form 5 final.pdf | 21 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Vistara.pdf | 6 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1( From Architect) Vistara.pdf | 23 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: 20241221122307.pdf | 21 Dec 2024 |
| Details of encumbrances concerned to LegalFile: 20241221122307.pdf | 21 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Delta Vistara (Q1) FY 24-25.pdf | 26 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Delta Vistara.pdf | 19 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SIGNED JUNE - 2024 - D Vistara - Form No 2 Eng Certificate.pdf | 19 Jul 2024 |
| Building plan approvalFile: AMENDED CC PLAN - (30-05-2024).pdf | 1 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: AMENDED CC PLAN - (30-05-2024).pdf | 1 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: AMENDED CC COPY - (30-05-2024).pdf | 1 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Delta Vistara Form 3 Q4 FY 2023-24.pdf | 25 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1 2024 FORM 1 DELTA VISTARA below 1mb.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1 2024 Form 2 D Vistara below 1mb.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 22 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Q4 2023 D Vistara Form No 2 Eng Certificate.pdf | 22 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Delta Vistara - Form 3.pdf | 22 Jan 2024 |
| Copy of the legal title reportFile: 1 Copy of the legal title report_compressed (1).pdf | 6 Nov 2023 |
| Layout approvalFile: Delta Vistara Plan 1-2 with area highlighted.pdf | 1 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: Delta Vistara Plan 1-2 with area highlighted.pdf | 1 Nov 2023 |
| Other - TechnicalFile: Delta Vistara Plan 1-2 with area highlighted.pdf | 1 Nov 2023 |
| Declaration about Commencement CertificateFile: Vistara Form D.pdf | 25 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclouser of Interest - Bhavesh patel.pdf | 25 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 19 Oct 2023 |
| Building plan approvalFile: CC Plan 2 4 CC.pdf | 11 Oct 2023 |
| Building plan approvalFile: CC Plan 5 8.pdf | 11 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: CC Plan 2 4 CC.pdf | 11 Oct 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: CC Plan 5 8.pdf | 11 Oct 2023 |
| Declaration in FORM BFile: Form B.pdf | 11 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 11 Oct 2023 |
| CERSAI detailsFile: CERSAI D Vistara.pdf | 11 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclouser of Interest - Nitin Gajipara.pdf | 11 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclouser of Interest - Prashant Gajipara.pdf | 11 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Dosclouser of Interest - GSPL.pdf | 11 Oct 2023 |
| Proforma of Allotment letterFile: Model Letter of Allotment - RERA.pdf | 11 Oct 2023 |
| Proforma of Agreement for saleFile: AFS- DRAFT - model .pdf | 11 Oct 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of Separate Bank Account.pdf | 11 Oct 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment Letter.pdf | 11 Oct 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report - Agreement.pdf | 11 Oct 2023 |
| Other - LegalFile: Agreement to Lease.pdf | 11 Oct 2023 |
| Other - LegalFile: TP 1.pdf | 11 Oct 2023 |
| Other - LegalFile: 2 Tripatite Agrement - PLot 2 Sector 26A Ulwe.pdf | 11 Oct 2023 |
| Other - LegalFile: 3 Tripartite Agreement PLot 2 Sec 26A Ulwe.pdf | 11 Oct 2023 |
| Other - LegalFile: Final Order Plot 2 Sector 26A Pushpak.pdf | 11 Oct 2023 |
| Other - LegalFile: 2 FINAL ORDER.pdf | 11 Oct 2023 |
| Other - LegalFile: Final Order BC to SE.pdf | 11 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Concerned to Finance.pdf | 10 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Concerned to Legal.pdf | 10 Oct 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Concerned to Finance.pdf | 10 Oct 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Concerned to Legal.pdf | 10 Oct 2023 |
| Layout approvalFile: Layout.pdf | 9 Oct 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 84 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DELTA VISTARA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PLOT NO 02 + 03 SECTOR 26A PUSHPAK (VAHAL) NAVI MUMBAI5,900+ in Raigarh
Filed coordinates, straight-line distance. 265 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: M/s. Shreenathji Enterprises
M/s. Shreenathji Enterprises has 1 registration on MahaRERA, including DELTA VISTARA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if DELTA VISTARA is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DELTA VISTARA?
The registered promoter entity is M/s. Shreenathji Enterprises, a partnership as per the filing. Its GSTIN 27ADQFS2196C1ZR can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DELTA VISTARA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DELTA VISTARA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DELTA VISTARA?
The professionals named in the filing: Architect: DIMENSIONS ARCHITECTS PVT LTD; Engineer: ANISH KUMAR YADAV; Chartered Accountant: CHETAN JOSHI AND CO; Chartered Accountant: CA Naina Jain; Chartered Accountant: Vallabh Vijay Joshi & Co Vallabh Vijay Joshi; Chartered Accountant: TEJAS METANGALE & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DELTA VISTARA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback