Home / Browse projects / Raigarh, Maharashtra / DELTA GREENS
DELTA GREENS
RG-MH-92933 · RERA P52000034901 · Last updated on MahaRERA portal: 15 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 4 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DELTA GREENS is a Others project by SHREENATHJI ENTERPRISES in Raigarh, Maharashtra, registered with MahaRERA as P52000034901 on 28 Apr 2022. Possession is promised by 31 Jul 2027. The completion date has moved by 4 months from the original filing. 133 of the 204 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.
At a glance
Project
- NameDELTA GREENS
- TypeOthers
- Location
- PLOT NO 08 SECTOR 04 PUSHPAK NODE DAPOLI
- PUSHPAK NODE DAPOLI
- Dapoli
- Panvel
- Raigarh
- 410206
- Pincode410206
- RERA no.P52000034901
- ReraGenie IDRG-MH-92933
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on28 Apr 2022
- Promised completion31 Jul 2027
- Revised completionRevised to 31 Jul 2027 (originally 31 Mar 2027)
- Buildings2 building records
- Documents filed80 files
Current status
Figures as on 15 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 14 | 12 | 74 | 13 | 87 |
| B WING | NA | 14 | 12 | 107 | 10 | 117 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 15 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 97%.
A WING98%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 96% |
| Sanitary Fittings within the flats / premises | 97% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 97% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
B WING98%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 96% |
| Sanitary Fittings within the flats / premises | 97% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 97% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 15 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 20% |
| Open Parking | No | Not applicable |
Parking filed249
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A WING | 124 | 124 |
| B WING | 125 | 125 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SATISH V AHUJA AND ASSOCIATES |
| Engineer | ANISH KUMAR YADAV |
| Engineer | Akshay Uttam Barakade |
| Engineer | SK Consultants & Engineers |
| Chartered Accountant | CHETAN JOSHI & CO |
| Chartered Accountant | CA Naina Jain |
| Chartered Accountant | Vallabh Vijay Joshi & Co |
| Chartered Accountant | Bhavesh Bhanushali & Associates |
| Chartered Accountant | Samarpit Ganesh Pingale |
| Partner | Role in project |
|---|---|
| SHREENATHJI ENTERPRISES | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterNA
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Apr 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Sep 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Sep 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Jul 2027
Documents filed80
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Layout approvalFile: Plan 1 - Built up area highlighted.pdf | 15 Sep 2026 |
| Building plan approvalFile: Plan 2 - Parking and Tenement highlighted.pdf | 15 Sep 2026 |
| Building plan approvalFile: Plan 3 - 8.pdf | 15 Sep 2026 |
| Building plan approvalFile: Plan 9 - 13.pdf | 15 Sep 2026 |
| Form 2A (FY 2022-2023)File: Form 2A - FY 2022-23.pdf | 15 Sep 2026 |
| Form 2A (FY 2023-2024)File: Form 2A - FY 2023-24.pdf | 15 Sep 2026 |
| Form 2A (FY 2024-2025)File: Form 2A - FY 2024-25.pdf | 15 Sep 2026 |
| Form 2A (FY 2025-2026)File: Form 2A - FY 2025-26 - Greens.pdf | 15 Sep 2026 |
| Withdrawal Update Form 1File: Form 1_Greens.pdf | 12 Aug 2026 |
| Withdrawal Update Form 2File: DELTA_GREENS_Form2_Q1_2026-27_06-08-2026_11-23.pdf | 12 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 - DG - 30-06-2026 - signed_compressed.pdf | 12 Aug 2026 |
| Withdrawal Update Form 1File: FORM 1 RERA CERTIFICATE GREENS.pdf | 25 Apr 2026 |
| Withdrawal Update Form 2File: form-2 Delta Greens.pdf | 25 Apr 2026 |
| Withdrawal Update Form 3File: RERA form 3.pdf | 25 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 RERA CERTIFICATE GREENS.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: form-2 Delta Greens.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: RERA form 3.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Q1 2024 FORM 01 DELTA GREEN.pdf | 11 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 RERA CERTIFICATE GREENS.pdf | 11 Jan 2026 |
| Withdrawal Update Form 2File: Q1 2024 Form 2 D Greens below 1MB1.pdf | 11 Jan 2026 |
| Withdrawal Update Form 2File: form-2 Delta Greens.pdf | 11 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - Delta Greens (Q1) FY 24-25.pdf | 11 Jan 2026 |
| Withdrawal Update Form 3File: RERA form 3.pdf | 11 Jan 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Delta Greens Form 1.pdf | 19 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 DELTA GREEN Signed.pdf | 7 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DELTA GREENS FORM 3 Q3[1] signed.pdf | 14 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Greens.pdf | 6 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FLORA 06 RERA FORM 01.pdf | 25 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GREEN 06 RERA FORM 1.pdf | 25 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Delta Greens (Q1) FY 24-25.pdf | 26 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: D Elite FORM 1.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: D Greens FORM 1.pdf | 19 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: D Elite - Form No 2 Eng Certificate.pdf | 19 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: D Greens- Form No 2 Eng Certificate.pdf | 19 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 2024 Form 3 D Greens below 3MB.pdf | 25 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1 2024 FORM 01 DELTA GREEN.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1 2024 Form 2 D Greens below 1MB.pdf | 20 Apr 2024 |
| Proforma of Agreement for saleFile: DRAFT AGREEMENT - DELTA GREENS.pdf | 15 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Delta Greens - Form 3_11zon.pdf | 22 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DELTA GREENS RERA CERTIFICATE Form 1.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Q4 - 2023 D Greens Form No 2 Eng Certificate.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Delta Greens_compressed.pdf | 21 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: D Greens.pdf | 17 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Delta Greens_Form 5_FY 2022-23 scanned copy.pdf | 28 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GREENS 02.pdf | 26 Sep 2023 |
| Proforma of Agreement for saleFile: MORTGAGE DRAFT NEW REVISED DELTA GREENS.pdf | 30 Jan 2023 |
| Building plan approvalFile: Amended CC Drawing - Plot 8 Sector 4.pdf | 24 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended CC Drawing - Plot 8 Sector 4.pdf | 24 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Amended CC - Plot 8 Sector 4.pdf | 24 Nov 2022 |
| Proforma of Allotment letterFile: AFS Plot 08.pdf | 15 Apr 2022 |
| Copy of the legal title reportFile: Legal Report.pdf | 1 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Plot No 08 up to 7th floor.pdf | 1 Apr 2022 |
| Declaration about Commencement CertificateFile: Declaration about CC Format - D.pdf | 1 Apr 2022 |
| Proforma of Allotment letterFile: Allotment Letter - Plot 8 Sector 4 Pushpak Dapoli.pdf | 1 Apr 2022 |
| CERSAI detailsFile: Undertaking CERSAI.pdf | 22 Mar 2022 |
| OtherFile: 1 TP SGE Plot 8 Sec 4 Pushpak-1-25_.pdf | 22 Mar 2022 |
| OtherFile: 2 TP SGE Plot 8 Sec 4 Pushpak-26-45.pdf | 22 Mar 2022 |
| OtherFile: 3 TP SGE Plot 8 Sec 4 Pushpak-46-68_.pdf | 22 Mar 2022 |
| OtherFile: Final Order.pdf | 22 Mar 2022 |
| Building plan approvalFile: 3 CC Plan.pdf | 21 Mar 2022 |
| Building plan approvalFile: 4 CC Plan.pdf | 21 Mar 2022 |
| Building plan approvalFile: 5 CC Plan.pdf | 21 Mar 2022 |
| Building plan approvalFile: 6 CC Plan.pdf | 21 Mar 2022 |
| Layout approvalFile: 1 CC Plan.pdf | 21 Mar 2022 |
| Building plan approvalFile: 1 CC Plan.pdf | 21 Mar 2022 |
| Building plan approvalFile: 2 CC Plan.pdf | 21 Mar 2022 |
| PAN CardFile: Shreenathji Enterprises pan card.pdf | 21 Mar 2022 |
| PAN CardFile: NBG PAN and Aadhar.pdf | 21 Mar 2022 |
| Details of encumbrancesFile: Declaration for Encumbrance.pdf | 21 Mar 2022 |
| Copy of Layout Approval (in case of layout)File: 1 CC Plan.pdf | 21 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 CC Plan.pdf | 21 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 CC Plan.pdf | 21 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 3 CC Plan.pdf | 21 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 4 CC Plan.pdf | 21 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 5 CC Plan.pdf | 21 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 6 CC Plan.pdf | 21 Mar 2022 |
| Declaration in FORM BFile: Form B.pdf | 21 Mar 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Certificate.pdf | 21 Mar 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Delta Greens.pdf | 21 Mar 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate D Greens.pdf | 21 Mar 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 6 other registrations, which the RERA portal never shows together
- All 80 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DELTA GREENS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PUSHPAK NODE DAPOLI5,900+ in Raigarh
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: SHREENATHJI ENTERPRISES
SHREENATHJI ENTERPRISES has 7 registrations on MahaRERA, including DELTA GREENS and DELTA PALACIO. Its filings disclose 5 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if DELTA GREENS is delayed beyond 31 Jul 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DELTA GREENS?
The registered promoter entity is SHREENATHJI ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DELTA GREENS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DELTA GREENS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DELTA GREENS?
The professionals named in the filing: Architect: SATISH V AHUJA AND ASSOCIATES; Engineer: ANISH KUMAR YADAV; Engineer: Akshay Uttam Barakade; Engineer: SK Consultants & Engineers; Chartered Accountant: CHETAN JOSHI & CO; Chartered Accountant: CA Naina Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DELTA GREENS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback