ReraGenieLog inGet a buyer report

Home / Browse projects / Raigarh, Maharashtra / DELTA GREENS

Registered No litigation declared Others project

DELTA GREENS

By SHREENATHJI ENTERPRISES

RG-MH-92933 · RERA P52000034901 · Last updated on MahaRERA portal: 15 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jul 2027Possession promisedmoved 4 months from the original
14 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 97%
71 of 204Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

DELTA GREENS is a Others project by SHREENATHJI ENTERPRISES in Raigarh, Maharashtra, registered with MahaRERA as P52000034901 on 28 Apr 2022. Possession is promised by 31 Jul 2027. The completion date has moved by 4 months from the original filing. 133 of the 204 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.

At a glance

Project

  • NameDELTA GREENS
  • TypeOthers
  • Location
    • PLOT NO 08 SECTOR 04 PUSHPAK NODE DAPOLI
    • PUSHPAK NODE DAPOLI
    • Dapoli
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • RERA no.P52000034901
  • ReraGenie IDRG-MH-92933

Builder

  • NameSHREENATHJI ENTERPRISES
  • Entity typePartnership
  • PartnersNITIN BABUBHAI GAJIPARA, PRASHANT BABUBHAI GAJIPARA, GEETANJALI SPACE PRIVATE LIMITED THROUGH ITS DIRECTOR NITIN B GAJIPARA
  • Other registrations6 more →
  • Declared earlier projects5 →

Key dates

this monthRegisteredApr 2022First promiseMar 2027Revised toJul 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Apr 2022
  • Promised completion31 Jul 2027
  • Revised completionRevised to 31 Jul 2027 (originally 31 Mar 2027)
  • Buildings2 building records
  • Documents filed80 files

Current status

65%133 of 204 units booked

Figures as on 15 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA1412741387
B WINGNA141210710117

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 15 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 97%.

A WING98%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
Sanitary Fittings within the flats / premises97%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
B WING98%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96%
Sanitary Fittings within the flats / premises97%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 15 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes20%
Open ParkingNoNot applicable

Parking filed249

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots249
Closed/Covered249
BuildingClosed/CoveredTotal
A WING124124
B WING125125

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,410 sq m
Land owned byThe promoter
Named landownersNone
Declared on23 Sep 2024

Approvals and building plan

Sanctioning authorityCIDCO LTD
Permissible FSI14789.89
Proposed, not sanctioned14,231 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSECTOR 15 CBD BELAPUR NAVI MUMBAI 400614

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSATISH V AHUJA AND ASSOCIATES
EngineerANISH KUMAR YADAV
EngineerAkshay Uttam Barakade
EngineerSK Consultants & Engineers
Chartered AccountantCHETAN JOSHI & CO
Chartered AccountantCA Naina Jain
Chartered AccountantVallabh Vijay Joshi & Co
Chartered AccountantBhavesh Bhanushali & Associates
Chartered AccountantSamarpit Ganesh Pingale
PartnerRole in project
SHREENATHJI ENTERPRISES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P52000034901/WarMar 2027 → Jul 2027

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Sep 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Sep 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2027

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: Plan 1 - Built up area highlighted.pdf15 Sep 2026
Building plan approvalFile: Plan 2 - Parking and Tenement highlighted.pdf15 Sep 2026
Building plan approvalFile: Plan 3 - 8.pdf15 Sep 2026
Building plan approvalFile: Plan 9 - 13.pdf15 Sep 2026
Form 2A (FY 2022-2023)File: Form 2A - FY 2022-23.pdf15 Sep 2026
Form 2A (FY 2023-2024)File: Form 2A - FY 2023-24.pdf15 Sep 2026
Form 2A (FY 2024-2025)File: Form 2A - FY 2024-25.pdf15 Sep 2026
Form 2A (FY 2025-2026)File: Form 2A - FY 2025-26 - Greens.pdf15 Sep 2026
Withdrawal Update Form 1File: Form 1_Greens.pdf12 Aug 2026
Withdrawal Update Form 2File: DELTA_GREENS_Form2_Q1_2026-27_06-08-2026_11-23.pdf12 Aug 2026
Withdrawal Update Form 3File: Form 3 - DG - 30-06-2026 - signed_compressed.pdf12 Aug 2026
Withdrawal Update Form 1File: FORM 1 RERA CERTIFICATE GREENS.pdf25 Apr 2026
Withdrawal Update Form 2File: form-2 Delta Greens.pdf25 Apr 2026
Withdrawal Update Form 3File: RERA form 3.pdf25 Apr 2026
Withdrawal Update Form 1File: FORM 1 RERA CERTIFICATE GREENS.pdf20 Apr 2026
Withdrawal Update Form 2File: form-2 Delta Greens.pdf20 Apr 2026
Withdrawal Update Form 3File: RERA form 3.pdf20 Apr 2026
Withdrawal Update Form 1File: Q1 2024 FORM 01 DELTA GREEN.pdf11 Jan 2026
Withdrawal Update Form 1File: FORM 1 RERA CERTIFICATE GREENS.pdf11 Jan 2026
Withdrawal Update Form 2File: Q1 2024 Form 2 D Greens below 1MB1.pdf11 Jan 2026
Withdrawal Update Form 2File: form-2 Delta Greens.pdf11 Jan 2026
Withdrawal Update Form 3File: Form 3 - Delta Greens (Q1) FY 24-25.pdf11 Jan 2026
Withdrawal Update Form 3File: RERA form 3.pdf11 Jan 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Delta Greens Form 1.pdf19 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 DELTA GREEN Signed.pdf7 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DELTA GREENS FORM 3 Q3[1] signed.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Greens.pdf6 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FLORA 06 RERA FORM 01.pdf25 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GREEN 06 RERA FORM 1.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Delta Greens (Q1) FY 24-25.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: D Elite FORM 1.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: D Greens FORM 1.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: D Elite - Form No 2 Eng Certificate.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: D Greens- Form No 2 Eng Certificate.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 2024 Form 3 D Greens below 3MB.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1 2024 FORM 01 DELTA GREEN.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1 2024 Form 2 D Greens below 1MB.pdf20 Apr 2024
Proforma of Agreement for saleFile: DRAFT AGREEMENT - DELTA GREENS.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Delta Greens - Form 3_11zon.pdf22 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DELTA GREENS RERA CERTIFICATE Form 1.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Q4 - 2023 D Greens Form No 2 Eng Certificate.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Delta Greens_compressed.pdf21 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: D Greens.pdf17 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Delta Greens_Form 5_FY 2022-23 scanned copy.pdf28 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GREENS 02.pdf26 Sep 2023
Proforma of Agreement for saleFile: MORTGAGE DRAFT NEW REVISED DELTA GREENS.pdf30 Jan 2023
Building plan approvalFile: Amended CC Drawing - Plot 8 Sector 4.pdf24 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Amended CC Drawing - Plot 8 Sector 4.pdf24 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: Amended CC - Plot 8 Sector 4.pdf24 Nov 2022
Proforma of Allotment letterFile: AFS Plot 08.pdf15 Apr 2022
Copy of the legal title reportFile: Legal Report.pdf1 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Plot No 08 up to 7th floor.pdf1 Apr 2022
Declaration about Commencement CertificateFile: Declaration about CC Format - D.pdf1 Apr 2022
Proforma of Allotment letterFile: Allotment Letter - Plot 8 Sector 4 Pushpak Dapoli.pdf1 Apr 2022
CERSAI detailsFile: Undertaking CERSAI.pdf22 Mar 2022
OtherFile: 1 TP SGE Plot 8 Sec 4 Pushpak-1-25_.pdf22 Mar 2022
OtherFile: 2 TP SGE Plot 8 Sec 4 Pushpak-26-45.pdf22 Mar 2022
OtherFile: 3 TP SGE Plot 8 Sec 4 Pushpak-46-68_.pdf22 Mar 2022
OtherFile: Final Order.pdf22 Mar 2022
Building plan approvalFile: 3 CC Plan.pdf21 Mar 2022
Building plan approvalFile: 4 CC Plan.pdf21 Mar 2022
Building plan approvalFile: 5 CC Plan.pdf21 Mar 2022
Building plan approvalFile: 6 CC Plan.pdf21 Mar 2022
Layout approvalFile: 1 CC Plan.pdf21 Mar 2022
Building plan approvalFile: 1 CC Plan.pdf21 Mar 2022
Building plan approvalFile: 2 CC Plan.pdf21 Mar 2022
PAN CardFile: Shreenathji Enterprises pan card.pdf21 Mar 2022
PAN CardFile: NBG PAN and Aadhar.pdf21 Mar 2022
Details of encumbrancesFile: Declaration for Encumbrance.pdf21 Mar 2022
Copy of Layout Approval (in case of layout)File: 1 CC Plan.pdf21 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: 1 CC Plan.pdf21 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: 2 CC Plan.pdf21 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: 3 CC Plan.pdf21 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: 4 CC Plan.pdf21 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: 5 CC Plan.pdf21 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: 6 CC Plan.pdf21 Mar 2022
Declaration in FORM BFile: Form B.pdf21 Mar 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Certificate.pdf21 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Delta Greens.pdf21 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate D Greens.pdf21 Mar 2022

How this compares with Raigarh

65%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 4 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DELTA GREENS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUSHPAK NODE DAPOLI5,900+ in Raigarh

Builder: SHREENATHJI ENTERPRISES

SHREENATHJI ENTERPRISES has 7 registrations on MahaRERA, including DELTA GREENS and DELTA PALACIO. Its filings disclose 5 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if DELTA GREENS is delayed beyond 31 Jul 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DELTA GREENS?

The registered promoter entity is SHREENATHJI ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DELTA GREENS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DELTA GREENS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DELTA GREENS?

The professionals named in the filing: Architect: SATISH V AHUJA AND ASSOCIATES; Engineer: ANISH KUMAR YADAV; Engineer: Akshay Uttam Barakade; Engineer: SK Consultants & Engineers; Chartered Accountant: CHETAN JOSHI & CO; Chartered Accountant: CA Naina Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DELTA GREENS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DELTA GREENS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DELTA GREENS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.