Registered No litigation declared Residential / Group Housing project

DELPHINE CHSL

By GLASSWOOD REALTY PRIVATE LIMITED

RG-MH-27013 · RERA P51800005847 · Last updated on MahaRERA portal: 29 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 93 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedmoved 93 months from the original
4 of 9Construction stages donefurthest along: Internal walls, 45%
37 of 41Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 51 documents Report an error

DELPHINE CHSL is a Residential / Group Housing project by GLASSWOOD REALTY PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800005847 on 14 Aug 2017. Possession is promised by 30 Jun 2028. The completion date has moved by 93 months from the original filing. 4 of the 41 units on this registration are recorded sold or booked, and 4 of 9 construction stages are filed complete.

At a glance

Project

  • NameDELPHINE CHSL
  • TypeResidential / Group Housing
  • Location
    • 1265 1265 1/4 AND 1266 1266 1/9
    • Kandivali
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800005847
  • ReraGenie IDRG-MH-27013

Builder

  • NameGLASSWOOD REALTY PRIVATE LIMITED
  • Entity typeCompany
  • GSTIN27AADCG5785E1ZF
  • Managing DirectorANISH PURSHOTTAM KHETAN
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseSep 2020Revised toJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Aug 2017
  • Promised completion30 Jun 2028
  • Revised completionRevised to 30 Jun 2028 (originally 30 Sep 2020)
  • Buildings1 building record
  • Documents filed51 files

Current status

10%4 of 41 units booked
16.4%Work done, per cost certificate

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DELPHINENA10941041

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 9 construction stages are filed complete. The stage furthest along is Internal walls, at 45%.

DELPHINE: 54% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks45%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Closed/Covered21
Open Space19

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,331 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 May 2026

Approvals and building plan

Sanctioning authorityMunicipal Corporation of Greater Mumbai
Permissible FSI1959.15
Proposed, not sanctioned1,944 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCHINTAMANI M G ROAD GOREGAON WEST MUMBAI 400062
Estimated costRs 18.00 cr
Cost incurredRs 2.95 cr
Work done16.39%
BuildingWingEstimatedIncurred
DELPHINENARs 10.50 crRs 2.95 cr
-NARs 7.50 cr-

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRASIK P HINGOO ASSOCIATES
EngineerKC SHAH CONSULTANTS
EngineerSher Singh Chilotra
EngineerM M Enterprises
EngineerAditya D Mehta
Chartered AccountantNiyati S Loladia & Associates
Chartered AccountantAmit Kothari & Associates LLP
Chartered AccountantRonen Joshi & Associates
PartnerRole in project
GLASSWOOD REALTY PRIVATE LIMITED-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800008683Sep 2020 → Dec 2022

Reason as filed by the promoterPlease note that we have obtained the IOD for the project on 15th September 2015 and the CC was granted to us by the MCGM on 17th May 2016 upto 5 Stilt Slab level. We had completed the stilt slab level work and had further applied for further CC and the MCGM sanctioned further CC on 23rd February 2017 for upto 9th floor. Thereafter when we approached the MCGM for further permissions, we were told that as the 30 feet DP road leading to our plot is encroached upon by unauthorized slum dwellers to the extent that, road width of 30 feet is not available on site and as the project is of 16 floors,

EA20052621038Sep 2020 → Jun 2028

Reason as filed by the promoterDear Sir/Ma’am, We, Glasswood Realty Private Limited, hereby declare the following with respect to the project “DELPHINE CHSL” bearing registration number P51800005847 registered under MahaRERA 1. Status of Work Completed: We are pleased to inform you that we have completed the 100% of RCC (Reinforced Cement Concrete) work for the all the buildings. Currently, we are undertaking the Pending finishing work, which includes plastering, flooring, electrical fittings, and other essential internal and external works. 2. Expected Timeline for Completion: We are committed to completing all balance wor

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed51

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form_No_2A_25_26.pdf29 Jun 2026
Layout approvalFile: Delphine - IOD Plan - 14 09 2015.pdf1 Jun 2026
Building plan approvalFile: Delphine - IOD Plan - 14 09 2015.pdf1 Jun 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE 28-07-2025.pdf1 Jun 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE 29-10-2025.pdf1 Jun 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE 29-10-2025.pdf1 Jun 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE 29-10-2025.pdf1 Jun 2026
Withdrawal Update Form 2File: Engineer certificate 1st april 2025 to 30th june 2025.pdf1 Jun 2026
Withdrawal Update Form 2File: Engineer certificate 1st july 2025 to 30th sep 2025.pdf1 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate 1st oct 2025 to 31st dec 2025.pdf1 Jun 2026
Withdrawal Update Form 2File: Engineer Certificate 1st oct 2025 to 31st dec 2025.pdf1 Jun 2026
Withdrawal Update Form 3File: as on 30-06-2025.pdf1 Jun 2026
Withdrawal Update Form 3File: as on 30-09-2025.pdf1 Jun 2026
Withdrawal Update Form 3File: as on 31-12-2025.pdf1 Jun 2026
Withdrawal Update Form 3File: as on 31-12-2025.pdf1 Jun 2026
Form 1File: Form 1 Latest.pdf20 May 2026
Form 2File: Form 2 Latest.pdf20 May 2026
Form 3File: Form 3 Latest.pdf20 May 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 Latest.pdf20 May 2026
Withdrawal Update Form 1File: Form 1 Latest.pdf20 May 2026
Withdrawal Update Form 2File: Form 2 Latest.pdf20 May 2026
Withdrawal Update Form 3File: Form 3 Latest.pdf20 May 2026
Form 2A (FY 2017-2018)File: Form 2A 17-18.pdf19 May 2026
Form 2A (FY 2018-2019)File: Form 2A 18-19.pdf19 May 2026
Form 2A (FY 2019-2020)File: Quality Assurance Certificatte 1-4-2019 to 31-3-2020.pdf19 May 2026
Form 2A (FY 2020-2021)File: Quality Assurance Certificatte 1-4-2020 to 31-3-2021.pdf19 May 2026
Form 2A (FY 2021-2022)File: Quality Assurance Certificatte 1-4-2021 to 31-3-2022.pdf19 May 2026
Form 2A (FY 2022-2023)File: Quality Assurance Certificatte 1-4-2022 to 31-3-2023.pdf19 May 2026
Form 2A (FY 2023-2024)File: Quality Assurance Certificatte 1-4-2023 to 31-3-2024.pdf19 May 2026
Form 5 (FY 2017-2018)File: Form 5 FY 17-18.pdf19 May 2026
Form 5 (FY 2018-2019)File: Form 5 FY 18-19.pdf19 May 2026
Form 5 (FY 2019-2020)File: April 012019 - March 312020.pdf19 May 2026
Form 5 (FY 2020-2021)File: April 012020 - March 312021.pdf19 May 2026
Form 5 (FY 2021-2022)File: April 012021 - March 312022.pdf19 May 2026
Form 5 (FY 2022-2023)File: April 012022 - March 312023.pdf19 May 2026
Form 5 (FY 2023-2024)File: April 012023 - March 312024.pdf19 May 2026
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5 - FY 17-18 DELPHINE.pdf10 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 - FY 18-19 DELPHINE.pdf10 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate of Hingoo.pdf5 Nov 2018
Details of encumbrancesFile: DELPHIN- FORM-B-compressed.pdf31 Jul 2017
Declaration in FORM BFile: DELPHIN- FORM-B-compressed.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate_Delphine.pdf31 Jul 2017
Certificates of CA (Form 3)File: CA Certificate_Delphine.pdf31 Jul 2017
Proforma of Allotment letterFile: AGREEMENT RERA - Delphine2.pdf31 Jul 2017
Layout approvalFile: LAYOUT APPROVAL.pdf30 Jul 2017
Building plan approvalFile: IOD.pdf30 Jul 2017
Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT APPROVAL.pdf30 Jul 2017
Building Plan Approval (IOD)File: IOD.pdf30 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFIACTE.pdf30 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
JEEVAN VIBHUTI JAY MAYURASANHAJI BAPU ROAD MALAD EAST55CompletedSep 2012Late, Dec 2012

How this compares with Mumbai Suburban

10%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 93 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DELPHINE CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kandivali6,700+ in Mumbai Suburban

2 kmDELPHINE CHSLCompleted 154Lapsed / revoked 103Other 145Dot size: filed unitsN

Filed coordinates, straight-line distance. 402 registered projects within 2 km.

Builder: GLASSWOOD REALTY PRIVATE LIMITED

GLASSWOOD REALTY PRIVATE LIMITED has 3 registrations on MahaRERA, including OM SARJAN CHSL and DELPHINE CHSL. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if DELPHINE CHSL is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DELPHINE CHSL?

The registered promoter entity is GLASSWOOD REALTY PRIVATE LIMITED, a company as per the filing. Its GSTIN 27AADCG5785E1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DELPHINE CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DELPHINE CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DELPHINE CHSL?

The professionals named in the filing: Architect: RASIK P HINGOO ASSOCIATES; Engineer: KC SHAH CONSULTANTS; Engineer: Sher Singh Chilotra; Engineer: M M Enterprises; Engineer: Aditya D Mehta; Chartered Accountant: Niyati S Loladia & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DELPHINE CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DELPHINE CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DELPHINE CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.