Registered No litigation declared Residential / Group Housing project

AV PRIDE

By ABHINAV REALTORS

RG-MH-07101 · RERA P99000054750 · Last updated on MahaRERA portal: 27 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 18.00 crore secured on the land, in favour of ADITYA BIRLA HOUSING FINANCE LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
7 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 35%
113 of 311Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 99 documents Report an error

AV PRIDE is a Residential / Group Housing project by ABHINAV REALTORS in Palghar, Maharashtra, registered with MahaRERA as P99000054750 on 12 Feb 2024. Possession is promised by 31 Dec 2028. 198 of the 311 units on this registration are recorded sold or booked, and 7 of 22 construction stages are filed complete.

At a glance

Project

  • NameAV PRIDE
  • TypeResidential / Group Housing
  • Location
    • NILEMORE
    • NALLASOPARA WEST
    • Palghar
    • 401203
  • Pincode401203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000054750
  • ReraGenie IDRG-MH-07101

Builder

  • NameABHINAV REALTORS
  • Entity typePartnership
  • GSTIN27ABWFA4962A1Z9
  • PartnersSUMIT VINODANAND MISHRA, KAMAL RAMAVINOD JHA, RAJU UMESH MISHRA, SUNAND VINODANAND MISHRA, DEEPAK BINAY JHA, ASHWANIKUMAR KAMESHWAR MISHRA, KLING GHANSHYAM MISHRA

Key dates

this monthRegisteredFeb 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Feb 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed99 files

Current status

64%198 of 311 units booked
51.9%Work done, per cost certificate

Figures as on 27 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A-WINGNA202011110121
B-WINGNA19191873190

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 27 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 35%.

A-WING33%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B-WING42%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed21

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots21
Closed/Covered1
Open Space20
BuildingClosed/CoveredOpen SpaceTotal
A-WING11011
B-WING01010

Land and ownership4

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,486 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared present
Charge in favour ofADITYA BIRLA HOUSING FINANCE LIMITED
Secured amountRs 18.00 crore
CERSAI search filedYes
Declared on25 Jun 2026
LandownerVillageDistrict
RAJEEV PATILThane (M Corp.)Thane
UMESH NAIKVasai-Virar City (M Corp)Palghar
RAMJI PREMJI VIRAKandivaliMumbai Suburban
PRAFULLA JAGANNATH SANEVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVVCMC
Permissible FSI19315.96
Proposed, not sanctioned19,316 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Flr, Shop no-16, Gagan Supreme CHS Ltd, Vasai Nallasopara Link Road, Palghar - 401107
Estimated costRs 69.86 cr
Cost incurredRs 36.22 cr
Work done51.85%
BuildingWingEstimatedIncurred
A-WINGNARs 29.69 crRs 18.11 cr
B-WINGNARs 29.69 crRs 18.11 cr
-NARs 10.48 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJAY WADE & ASSOCIATES
EngineerMUKESH KUMAR CHAURASIA
EngineerPramod Pandey
Chartered AccountantJHA MISHRA AND CO
Chartered AccountantCHANDAN CHOUDHARY & ASSOCIATES
Chartered AccountantDhiraj Kanaram and Co
PartnerRole in project
ABHINAV REALTORS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed99

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Abhinav Jan to Mar-26.pdf27 Jun 2026
Withdrawal Update Form 2File: Form 2 Abhinav Jan to Mar-26.pdf27 Jun 2026
Withdrawal Update Form 3File: FORM 3 Abhinav Jan to Mar-26_compressed.pdf27 Jun 2026
Form 2A (FY 2023-2024)File: AV PRIDE Form-2A FY 23-24.pdf23 Apr 2026
Form 2A (FY 2024-2025)File: Abhinav Realtors Form-2A FY 24-25.pdf23 Apr 2026
Form 2A (FY 2025-2026)File: AV PRIDE Form-2A FY 25-26.pdf23 Apr 2026
Form 1File: Abhinav Form-1 Jan to Mar-25.pdf11 Mar 2026
Form 2File: Abhinav Form-2 Jan to Mar-25.pdf11 Mar 2026
Form 3File: Abhinav Form-3 Jan to Mar-25_compressed (1).pdf11 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold AV Pride Mar-25_11zon.pdf11 Mar 2026
Form 1File: Form-1 Abhinav Realtors oct to dec-24.pdf11 Mar 2026
Form 2File: Form-2 Abhinav Realtors oct to dec-24.pdf11 Mar 2026
Form 3File: Form-3 Abhinav Realtors oct to dec-24_compressed.pdf11 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold AV Pride Dec-24_11zon.pdf11 Mar 2026
Form 1File: Form-1 Abhinav Jul to Sep-24_11zon.pdf11 Mar 2026
Form 2File: Form-2 Abhinav Jul to Sep-24_11zon.pdf11 Mar 2026
Form 3File: Form-3 Abhinav Jul to Sep-24_11zon.pdf11 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold AV Pride Sep-24_11zon.pdf11 Mar 2026
Form 1File: Form-1 Abhinav Apr to Jun-24_11zon.pdf11 Mar 2026
Form 2File: Form-2 Abhinav Apr to Jun-24_11zon.pdf11 Mar 2026
Form 3File: Form-3 Abhinav Apr to Jun-24_11zon.pdf11 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold AV Pride Jun-24_11zon.pdf11 Mar 2026
Form 1File: Form-1 Abhinav Realtors Jan to Mar-24.pdf11 Mar 2026
Form 2File: Form-2 Abhinav Realtors Jan to Mar-24.pdf11 Mar 2026
Form 3File: Form-3 Revised Abhinav Realtors Jan to Mar-24_11zon.pdf11 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold AV Pride Mar-24_11zon.pdf11 Mar 2026
Form 1File: Form-1 Abhinav Oct to dec-25.pdf2 Mar 2026
Form 2File: Form-2 Abhinav Realtors Oct to Dec-25.pdf2 Mar 2026
Form 3File: Form-3 Abhinav Realtors Oct to Dec-25.pdf2 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold Dec-25 - Abhinav_11zon.pdf2 Mar 2026
Form 1File: Form-1 Abhinav Realtors Jul to Sep-25.pdf14 Feb 2026
Form 2File: Form-2 Abhinav Realtors Jul to Sep-25.pdf14 Feb 2026
Form 3File: Form-3 Abhinav Realtors Jul to Sep-25.pdf14 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold List Jul to Sep-25_11zon.pdf14 Feb 2026
Form 1File: abhinav -1.pdf11 Sep 2025
Form 2File: abhinav -2.pdf11 Sep 2025
Form 3File: Form-3 Abhinav Apr to Jun-25.pdf11 Sep 2025
Disclosure of Sold and Booked InventoryFile: sold unsold apr to jun-25_compressed.pdf11 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Abhinav Form-1 Jan to Mar-25.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Abhinav Form-3 Jan to Mar-25_compressed (1).pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Abhinav Form-2 Jan to Mar-25.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Abhinav Realtors oct to dec-24.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Abhinav Realtors oct to dec-24_compressed.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Abhinav Realtors oct to dec-24.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Abhinav Apr to Jun-24_11zon.pdf8 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Abhinav Jul to Sep-24_11zon.pdf8 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Abhinav Apr to Jun-24_11zon.pdf8 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Abhinav Jul to Sep-24_11zon.pdf8 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Abhinav Apr to Jun-24_11zon.pdf8 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Abhinav Jul to Sep-24_11zon.pdf8 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Revised Abhinav Realtors Jan to Mar-23_11zon.pdf25 Oct 2024
Other - LegalFile: sale agreement as per MAHA RERA.pdf24 Oct 2024
Proforma of Agreement for saleFile: sale agreement as per MAHA RERA.pdf24 Oct 2024
Details of encumbrances concerned to FinanceFile: encumbrance av.pdf9 Oct 2024
Other - LegalFile: deedof retirement av.pdf9 Oct 2024
Details of encumbrances concerned to LegalFile: encumbrance av.pdf9 Oct 2024
Other - FinanceFile: encumbrance av.pdf9 Oct 2024
Other - FinanceFile: secured loan av.pdf9 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: secured loan av.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Abhinav Realtors Jan to Mar-24.pdf21 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Abhinav Realtors Jan to Mar-24.pdf21 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Abhinav Realtors Jan to Mar-24 - compressed.pdf21 May 2024
Building plan approvalFile: 02 of 06 Gr 1st - Typical A-Wing 31-08-2023.pdf26 Feb 2024
Building plan approvalFile: 03 of 06 Section A-Wing 31-08-2023.pdf26 Feb 2024
Building plan approvalFile: 04 of 06 Gr 1st B-Wing 31-08-2023.pdf26 Feb 2024
Building plan approvalFile: 05 of 06 Typical - Refuge B-Wing 31-08-2023.pdf26 Feb 2024
Building plan approvalFile: 06 of 06 Section B-Wing 31-08-2023.pdf26 Feb 2024
Layout approvalFile: 01 of 06 Layout 31-08-2023.pdf26 Feb 2024
Copy of Layout Approval (in case of layout)File: 01 of 06 Layout 31-08-2023.pdf26 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 02 of 06 Gr 1st - Typical A-Wing 31-08-2023.pdf26 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 03 of 06 Section A-Wing 31-08-2023.pdf26 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 04 of 06 Gr 1st B-Wing 31-08-2023.pdf26 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 05 of 06 Typical - Refuge B-Wing 31-08-2023.pdf26 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: 06 of 06 Section B-Wing 31-08-2023.pdf26 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Abhinav Realtors.pdf7 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest - all partners.pdf7 Feb 2024
Other - TechnicalFile: Declaration Cum undertaking.pdf7 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 44 Declaration of Separate Bank account.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate AV Pride.pdf29 Jan 2024
Details of encumbrances concerned to FinanceFile: 4 Declaration for Legal Encumbrances.pdf27 Jan 2024

How this compares with Palghar

64%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AV PRIDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NALLASOPARA WEST3,200+ in Palghar

2 kmAV PRIDECompleted 58Lapsed / revoked 45Other 115Dot size: filed unitsN

Filed coordinates, straight-line distance. 218 registered projects within 2 km.

Builder: ABHINAV REALTORS

ABHINAV REALTORS has 1 registration on MahaRERA, including AV PRIDE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if AV PRIDE is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AV PRIDE?

The registered promoter entity is ABHINAV REALTORS, a partnership as per the filing. Its GSTIN 27ABWFA4962A1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AV PRIDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AV PRIDE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AV PRIDE?

The professionals named in the filing: Architect: AJAY WADE & ASSOCIATES; Engineer: MUKESH KUMAR CHAURASIA; Engineer: Pramod Pandey; Chartered Accountant: JHA MISHRA AND CO; Chartered Accountant: CHANDAN CHOUDHARY & ASSOCIATES; Chartered Accountant: Dhiraj Kanaram and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AV PRIDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AV PRIDE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AV PRIDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.