Completed No litigation declared Residential / Group Housing project

DEEP PRIDE ATO E WING

By DEEP HOMES

RG-MH-68170 · RERA P99000010595 · Last updated on MahaRERA portal: 22 Jun 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 54 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jun 2023Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 41 documents Report an error

DEEP PRIDE ATO E WING is a Residential / Group Housing project by DEEP HOMES in Palghar, Maharashtra, registered with MahaRERA as P99000010595 on 31 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2023. The completion date has moved by 54 months from the original filing.

At a glance

Project

  • NameDEEP PRIDE ATO E WING
  • TypeResidential / Group Housing
  • Location
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401203
  • Pincode401203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000010595
  • ReraGenie IDRG-MH-68170

Builder

  • NameDEEP HOMES
  • Entity typePartnership
  • PartnersSANJAY YADAV, Sushila Sanjay Yadav, PRAVIN VASANT JAIN, HITESH VASANT RATHOD

Key dates

this monthRegisteredAug 2017First promiseDec 2018Revised toJun 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Aug 2017
  • Promised completion30 Jun 2023
  • Revised completionRevised to 30 Jun 2023 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed41 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DEEP PRIDE A TO ENA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jun 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

DEEP PRIDE A TO E: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 Jun 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed60

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots60
Closed/Covered60

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area981 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI4524.13
Proposed, not sanctioned4,524 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNIKHIL HERITGE ACHOLE ROAD NALLASOPARA EAST

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANAT MEHTA AND ASSOCIATES
PartnerRole in project
DEEP HOMES-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000012398Dec 2018 → Jun 2023

Reason as filed by the promoterOur Project “DEEP PRIDE A TO E WING” having Maharera No. P99000010595 with completion date 30-12-2021 is already completed within the stipulated time. As per revision in development plan of the region, The Vasai Virar City Municipal Corporation (VVCMC), the Town Planning Authority has approved the Extra FSI for the construction Vide Revised Development Plan No. - VVCMC/TP/RDP/VP-0111/170/202122 dated 14-06-2021. The same is attached herewith. As to construct and complete as per Revised Approval, we seek further time till 30-06-2023. The Approval of Existing allottees of atleast 51% as required

EXT99000005366Dec 2018 → Dec 2020

Reason as filed by the promoterRESPECTED SIR, THE PROJECT IS COMPLETE ON ALL GROUNDS OF CONSTRUCTION, APPLICATION OF OC IS ALSO SUBMITTED IN DEPARTMENT. HOWEVER WE ARE WAITING FOR OC OF THE PROJECT AND THEREFORE REQUEST YOU TO EXTEND THE PROJECT. THANKING YOU

EXT99000001392Dec 2018 → Dec 2020

Reason as filed by the promoterI MR. SANJAY YADAV, PARTNER OF M/S ARTHARVA DEVELOPERS WANTS TO STATE THAT OUR PROJECT DEEP GARDEN LOCATED IN NALASOPARA WAS BOUND TO BE COMPLETED ON 31ST DECEMBER 2018, HOWEVER DUE TO ENVIRONMENTAL CLEARANCE HAS NOT YET RECEIVED BY THE LAND OWNER. THEREFORE, THE PROJECT COMPLETION IS DELAYED DUE TO REASONS NOT IN OUR CONTROL. WE HAVE ENCLOSED THE LETTER DIRECTED TO US. WE REQUEST YOU TO KINDLY EXTEND THE PROJECT COMPLETION FOR TIME PERIOD TILL THE ENVIRONMENTAL CLEARANCE IS OBTAINED AND WE CAN APPLY FOR OCCUPANCY CERTIFICATE.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Jun 2023

Documents filed41

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 REVISED.pdf22 Jun 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Deep Homes OC OPT.pdf16 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE _opt.pdf3 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENG CERT_opt.pdf3 Feb 2023
Certificates of CA (Form 3)File: FORM 3_SIGNED opt.pdf3 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5_DEEP HOMES_2022_opt.pdf19 Jan 2023
Declaration about Commencement CertificateFile: RDP REVISED APPROVAL ORDER.pdf25 Aug 2022
Other - TechnicalFile: RDP REVISED APPROVAL ORDER.pdf25 Aug 2022
Declaration about Commencement CertificateFile: CC DECLAIRATION.pdf17 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A.pdf17 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A.pdf17 Aug 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 1.pdf17 Aug 2022
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 2.pdf17 Aug 2022
Certificates of CA (Form 5)File: FORM 5 2017-18 REVISED_opt.pdf2 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 FY 1819_opt.pdf2 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FOMR 5 FY 2019-20_opt.pdf2 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 FY 2020-21_opt.pdf2 Jul 2022
Certificates of CA (Form 3)File: deep homes 1.pdf2 May 2022
Certificates of CA (Form 3)File: CA CERTIFICATE 300621.pdf2 May 2022
Certificates of CA (Form 3)File: CA CERTIFICATE 04052019.pdf2 May 2022
Certificates of CA (Form 3)File: CA CERTIFICATE 18052019.pdf2 May 2022
Certificates of CA (Form 5)File: FORM 5 DEEP HOMES.pdf15 Jun 2019
Certificates of CA (Form 3)File: CA certificate 1.pdf9 Sep 2017
Layout approvalFile: AB C 1 3.pdf4 Aug 2017
Layout approvalFile: D E WING 12.pdf4 Aug 2017
Building plan approvalFile: AB C 1 3.pdf4 Aug 2017
Building plan approvalFile: D E WING 12.pdf4 Aug 2017
PAN CardFile: FIRM PAN CARD-DEEP HOMES.pdf4 Aug 2017
Copy of the legal title reportFile: Search Tital 1.pdf4 Aug 2017
Details of encumbrancesFile: Form B 1 (4 files merged).pdf4 Aug 2017
Copy of Layout Approval (in case of layout)File: AB C 1 3.pdf4 Aug 2017
Copy of Layout Approval (in case of layout)File: D E WING 12.pdf4 Aug 2017
Building Plan Approval (IOD)File: AB C 1 3.pdf4 Aug 2017
Building Plan Approval (IOD)File: D E WING 12.pdf4 Aug 2017
Commencement Certificates / NA Order for plotted developmentFile: CC 1 (4 files merged).pdf4 Aug 2017
Declaration in FORM BFile: Form B 1 (4 files merged).pdf4 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archi Cft Wing D E.pdf4 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: St Engg Cft Wing A B C.pdf4 Aug 2017
Certificates of CA (Form 3)File: CA Certificate.pdf4 Aug 2017
Proforma of Allotment letterFile: Allotment of Flat.pdf4 Aug 2017
Proforma of Allotment letterFile: DEEPPRIDE DEEP HOME NEW.pdf4 Aug 2017

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 54 months
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DEEP PRIDE ATO E WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vasai-Virar City (M Corp)3,200+ in Palghar

2 kmDEEP PRIDE ATO E WINGCompleted 34Lapsed / revoked 25Other 69Dot size: filed unitsN

Filed coordinates, straight-line distance. 128 registered projects within 2 km.

Builder: DEEP HOMES

DEEP HOMES has 1 registration on MahaRERA, including DEEP PRIDE ATO E WING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if DEEP PRIDE ATO E WING is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DEEP PRIDE ATO E WING?

The registered promoter entity is DEEP HOMES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DEEP PRIDE ATO E WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DEEP PRIDE ATO E WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DEEP PRIDE ATO E WING?

The professionals named in the filing: Architect: SANAT MEHTA AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DEEP PRIDE ATO E WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DEEP PRIDE ATO E WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DEEP PRIDE ATO E WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.