Home / Browse projects / Raigarh, Maharashtra / DEEP PLANET

Registration lapsed No litigation declared Residential / Group Housing project

DEEP PLANET

By SAMBHAV PLANET PROJECTS

RG-MH-29349 · RERA P52000028303 · Last updated on MahaRERA portal: 19 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date
  • 2 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
9 of 11Construction stages donefurthest along: Installation of Lifts, 57%
2Complaints at MahaRERAon this registration
Jump to the 56 documents Report an error

DEEP PLANET is a Residential / Group Housing project by SAMBHAV PLANET PROJECTS in Raigarh, Maharashtra, registered with MahaRERA as P52000028303 on 18 Feb 2021. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 12 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameDEEP PLANET
  • TypeResidential / Group Housing
  • Location
    • SECTOR 34B
    • KHARGHAR
    • Panvel
    • Raigarh
    • 410210
  • Pincode410210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000028303
  • ReraGenie IDRG-MH-29349

Builder

  • NameSAMBHAV PLANET PROJECTS
  • Entity typePartnership
  • PartnersHABIB MOHAMMED UMAR KHAN, VIKRAM SUBHASH PATRA, SHAILESH GHANSHYAMDAS KABRA, BILAL RAFIUDDIN PATEL
  • Declared earlier projects13 →

Key dates

16 months past promisethis monthRegisteredFeb 2021First promiseJun 2024Revised toJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on18 Feb 2021
  • Promised completion30 Jun 2025
  • Revised completionRevised to 30 Jun 2025 (originally 30 Jun 2024)
  • Buildings1 building record
  • Documents filed56 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DEEP PLANETNA1614000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 57%.

DEEP PLANET: 87% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.57%

Progress on shared amenities15

As on 19 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed23

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots23
Closed/Covered1
Open Space22

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,049 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
TOUCHSTONE BUILDERS & DEVELOPERSThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra Limited
Permissible FSI1565.37
Proposed, not sanctioned1,565 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 5 TO 8 MORESHWAR HEIGHTS KAMOTHE 410209

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectATUL PATEL
EngineerS. V. PATEL & ASSOCIATES
Chartered AccountantA ABHISHEK & COMPANY
PartnerRole in project
SAMBHAV PLANET PROJECTS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000023030Jun 2024 → Jun 2025

Reason as filed by the promoterSINCE COMMENCEMENT CERTIFICATE HAS BEEN RECEIVED ON DATED 24/11/2020 AND AFTER THAT LOCKDOWN HAS BEEN IMPOSED BY THE GOVT. DUE TO COVID. WE HAD STARTED THIS PROJECTS ALMOST AFTER MORE THAN ONE YEAR THAT IS WHY PROJECT HAS BEEN DELAYED AND REQUIRED FUTRHER EXTENSION

Litigation declared1

CaseCourtStatus
45/2016PANVELNEXT HEARING

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12503254Rubina Abdul Rauf PatelTouchstone Builders and Developers through its partners13/09/2025
CC12503722Sachin TailangSAMBHAV PLANET PROJECTS21/10/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Feb 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Feb 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Feb 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Feb 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Mar 2025

Documents filed56

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
OtherFile: Work Completion Photos PL 6A.pdf19 Apr 2025
OtherFile: FORM 2A Q4 FY 24-25.pdf19 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Copy.pdf24 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Oct to Dec 24 PL 6A.pdf6 Feb 2025
OtherFile: Work Completion Photos PL 6A.pdf6 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A PL 6A.pdf6 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 S PLANET PROJECTS PL 6A FY 23-24.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 July to Sept 24 PL 6A.pdf22 Nov 2024
OtherFile: Work Completion Photos PL 6A.pdf22 Nov 2024
OtherFile: FORM 2A PL 6A.pdf22 Nov 2024
OtherFile: S Planet Project PL 6A.pdf26 Jul 2024
OtherFile: Work Completion Photos PL 6A.pdf26 Jul 2024
OtherFile: Work Completion Photos PL 6A.pdf29 Apr 2024
OtherFile: Form 2A Plot No 6A.pdf29 Apr 2024
OtherFile: Work Completion Photos PL6A.pdf24 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: sambhav planet project_deep planet_plot no 6A.pdf29 Dec 2023
OtherFile: 6A.pdf3 Nov 2023
OtherFile: FORM-2A PLOT-6A SEC-34B.pdf3 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PL-6A QTR 1ST.pdf31 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PL-6A QTR 2ND.pdf31 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PL-6A QTR 3RD.pdf31 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PL-6A QTR 4TH.pdf31 Jul 2023
OtherFile: FORM 2A PL 6A (Q1).pdf31 Jul 2023
OtherFile: Work Completion Photos PL 6A.pdf27 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: PL 6A.pdf1 Mar 2023
OtherFile: Work Completion Photos PL 6A.pdf21 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Sambhav Planet Projects.pdf28 Dec 2022
Proforma of Allotment letterFile: (PL-6A) allotment letter as per rera 2.pdf18 Dec 2022
OtherFile: Work Completion Photos 6A.pdf8 Nov 2022
OtherFile: 16Work Completion Photo PL-6A.pdf5 Aug 2022
OtherFile: Work Completion Photos PL 6A.pdf23 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Sambhav Planet Projects_Deep Planet.pdf8 Feb 2022
OtherFile: 23 Work Completion Photos - PL 6A.pdf22 Jan 2022
OtherFile: Work Completion Photos PL6A.pdf24 Oct 2021
OtherFile: Work Completion Photos PL6A.pdf22 Jul 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rera Certificate .pdf6 Feb 2021
Proforma of Allotment letterFile: DRAFT AGREEMENT FOR SALE PLOT NO 6A SEC 34 B KHARGHAR.pdf4 Feb 2021
Proforma of Allotment letterFile: DRAFT ALLOTMENT LETTER PLOT NO 6A SEC 34 B KHARGHAR SAMBHAV PLANET PROJECTS.pdf4 Feb 2021
Layout approvalFile: CC DRG.pdf3 Feb 2021
Building plan approvalFile: CC DRG.pdf3 Feb 2021
PAN CardFile: COMPANY PAN CARD.pdf3 Feb 2021
Copy of the legal title reportFile: SEARCH REPORT.pdf3 Feb 2021
Copy of the legal title reportFile: TITLE CERTIFICATE.pdf3 Feb 2021
Details of encumbrancesFile: DETAILS OF ENCUMBRANCE (DEVELOPERS).pdf3 Feb 2021
Copy of Layout Approval (in case of layout)File: CC DRG.pdf3 Feb 2021
Building Plan Approval / NA Order for plotted developmentFile: CC DRG.pdf3 Feb 2021
Commencement Certificates / NA Order for plotted developmentFile: CC copy.pdf3 Feb 2021
Declaration in FORM BFile: FORM B - RERA - DECLARATION (DEVELOPERS).pdf3 Feb 2021
OtherFile: AGREEMENT TO LEASE-1-13.pdf3 Feb 2021
OtherFile: AGREEMENT TO LEASE-14-26.pdf3 Feb 2021
OtherFile: AGREEMENT TO LEASE-27-39.pdf3 Feb 2021
OtherFile: AGREEMENT TO LEASE-40-52.pdf3 Feb 2021
OtherFile: TRIPARTITE AGREEMENT-1-10.pdf3 Feb 2021
OtherFile: TRIPARTITE AGREEMENT-11-20.pdf3 Feb 2021
OtherFile: TRIPARTITE AGREEMENT-21-30.pdf3 Feb 2021
OtherFile: TRIPARTITE AGREEMENT-31-41.pdf3 Feb 2021

Promoter's earlier projects13

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

10 delivered on promise3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Deep DestinyPlot No 33 Sec 2A Karanjade68CompletedMar 2020Sep 2018
Sai DeepPlot No 36 Sec 5A Karanjade23CompletedDec 2019Jan 2019
Deep RisePlot No 111 Sector 5 Karanjade16CompletedMar 2019Mar 2018
Deep DevanshPlot No 30 Sector 1 Karanjade24CompletedJan 2019May 2017
Deep PridePlot No 95 Sector 3 Karanjade13CompletedAug 2018Feb 2018
Shyam ResidencyPlot No 98 Sector 2A Karanjade41CompletedMay 2018Jun 2017
Neal ShivamPlot No 18 Sec 01 Karanjade34CompletedJan 2017Aug 2016
Aruna shivamPlot No 22A Sector 1 karanjade44CompletedAug 2016Oct 2015
BAL GANESHPlot No 11B Sector 24 kamothe9CompletedJan 2016Feb 2014
Jai Sambhav Lk PlanetPlot No A119 Sector 6 Karanjade119CompletedNov 2015Late, Sep 2016
Jai plazaPlot No 22 Sector 2A karanjade56CompletedFeb 2015Late, Jun 2015
Deep shivamPlot No 48 Sector 4 karanjade54CompletedDec 2014Late, Feb 2015
Shree ganeshPlot No 3 Sector 6 karanjade22CompletedNov 2014Aug 2013

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DEEP PLANET on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KHARGHAR5,900+ in Raigarh

2 kmDEEP PLANETCompleted 59Lapsed / revoked 32Other 80Dot size: filed unitsN

Filed coordinates, straight-line distance. 171 registered projects within 2 km.

Builder: SAMBHAV PLANET PROJECTS

SAMBHAV PLANET PROJECTS has 1 registration on MahaRERA, including DEEP PLANET. Its filings disclose 13 earlier MahaRERA projects: declares 10 of 13 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that DEEP PLANET shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if DEEP PLANET is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DEEP PLANET?

The registered promoter entity is SAMBHAV PLANET PROJECTS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DEEP PLANET?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against DEEP PLANET?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for DEEP PLANET?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DEEP PLANET?

The professionals named in the filing: Architect: ATUL PATEL; Engineer: S. V. PATEL & ASSOCIATES; Chartered Accountant: A ABHISHEK & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DEEP PLANET?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DEEP PLANET. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DEEP PLANET to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.