Home / Browse projects / Raigarh, Maharashtra / DEEP PEARL

Registered No litigation declared Residential / Group Housing project

DEEP PEARL

By KIRTI HEMCHAND SHAH

RG-MH-29008 · RERA P52000027548 · Last updated on MahaRERA portal: 23 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 30 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 30 months from the original
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 90%
16 of 22Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

DEEP PEARL is a Residential / Group Housing project by KIRTI HEMCHAND SHAH in Raigarh, Maharashtra, registered with MahaRERA as P52000027548 on 14 Dec 2020. Possession is promised by 31 Dec 2026. The completion date has moved by 30 months from the original filing. 6 of the 22 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameDEEP PEARL
  • TypeResidential / Group Housing
  • Location
    • SECTOR 1
    • PUSHPAK (NEW)
    • Vadghar (CT)
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000027548
  • ReraGenie IDRG-MH-29008

Builder

  • NameKIRTI HEMCHAND SHAH
  • Entity typeIndividual
  • Other registrations3 more →
  • Completed3 of 4
  • Declared earlier projects27 →

Key dates

this monthRegisteredDec 2020First promiseJun 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Dec 2020
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2024)
  • Buildings1 building record
  • Documents filed90 files

Current status

27%6 of 22 units booked
94.3%Work done, per cost certificate

Figures as on 23 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DEEP PEARLNA6622022

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

DEEP PEARL: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 23 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed7

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots7
Closed/Covered5
Open Space2

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area650 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
ADITYA ASHOK GHARATPargaonRaigarh

Approvals and building plan

Sanctioning authorityCity and Industrial Development Corporation of Maharashtra Limited
Permissible FSI520.31
Proposed, not sanctioned520 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO-5 TO 8 MORESHWAR HEIGHTS KAMOTHE NAVI MUMBAI 410209
Estimated costRs 2.21 cr
Cost incurredRs 2.08 cr
Work done94.33%
BuildingWingEstimatedIncurred
DEEP PEARLNARs 2.13 crRs 2.04 cr
-NARs 8.00 lakhRs 4.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectATUL PATEL
EngineerB. S. SUKTHANKAR & ASSOCIATES
Chartered AccountantA ABHISHEK & COMPANY
Chartered AccountantAgarwal Vikash & Co.
PartnerRole in project
KIRTI HEMCHAND SHAH-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000023031Jun 2024 → Jun 2025

Reason as filed by the promoterSINCE COMMENCEMENT CERTIFICATE HAS BEEN RECEIVED ON DATED 08/08/2019 AND AFTER THAT LOCKDOWN HAS BEEN IMPOSED BY THE GOVT. DUE TO COVID. WE HAD STARTED THIS PROJECTS ALMOST AFTER MORE THAN ONE YEAR THAT IS WHY PROJECT HAS BEEN DELAYED AND REQUIRED FUTRHER EXTENSION

EA21082622339Jun 2024 → Dec 2026

Reason as filed by the promoterWe have OC received

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Dec 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Dec 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Dec 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf23 Sep 2026
Withdrawal Update Form 1File: Form 1.pdf23 Sep 2026
Withdrawal Update Form 1File: Form 1.pdf23 Sep 2026
Withdrawal Update Form 1File: Form 1.pdf23 Sep 2026
Withdrawal Update Form 2File: Form 2.pdf23 Sep 2026
Withdrawal Update Form 2File: Form 2.pdf23 Sep 2026
Withdrawal Update Form 2File: Form 2.pdf23 Sep 2026
Withdrawal Update Form 2File: Form 2.pdf23 Sep 2026
Withdrawal Update Form 3File: Form 3.pdf23 Sep 2026
Withdrawal Update Form 3File: Form 3.pdf23 Sep 2026
Withdrawal Update Form 3File: Form 3.pdf23 Sep 2026
Withdrawal Update Form 3File: Form 3.pdf23 Sep 2026
Form 5 (FY 2025-2026)File: FORM 5 FY 24-25.pdf23 Sep 2026
Withdrawal Update Form 1File: Form 1.pdf21 Aug 2026
Withdrawal Update Form 2File: Form 2.pdf21 Aug 2026
Withdrawal Update Form 3File: Form 3.pdf21 Aug 2026
Form 2A (FY 2024-2025)File: Form 2A 2024-25.pdf20 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A 2025-26.pdf20 Aug 2026
Form 5 (FY 2023-2024)File: FORM 5 FY 23-24.pdf20 Aug 2026
Form 5 (FY 2024-2025)File: FORM 5 FY 24-25.pdf20 Aug 2026
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 FY 24-25.pdf19 Apr 2025
OtherFile: Work Completion Photos PL 135.pdf19 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A, Q4 FY 24-25.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 PL 135.pdf14 Feb 2025
OtherFile: Work Completion Photos PL 135.pdf14 Feb 2025
OtherFile: FORM 2A PL 135.pdf14 Feb 2025
OtherFile: FORM 2A PL 135.pdf22 Nov 2024
OtherFile: Work Completion Photos PL 135.pdf22 Nov 2024
OtherFile: Work Completion Photos PL 135.pdf26 Jul 2024
OtherFile: S Realtors PL 135.pdf26 Jul 2024
Declaration about Commencement CertificateFile: FORMAT D DELARATION OF COMMECEMENT CERTIFICATE.pdf25 Jun 2024
Declaration in FORM BFile: Form B RERA EXTENSION.pdf25 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT CERTIFICATE.pdf25 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEERS CERTIFICATE.pdf25 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf25 Jun 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory.pdf25 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 CA CERTIFICATE.pdf25 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A disclosure of interest in other real estate organizations.pdf25 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5.pdf25 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account details including no encumbrances on the Bank Account or no escrow o25 Jun 2024
OtherFile: Form 2A Plot No 248.pdf7 May 2024
OtherFile: Work Completion Photos PL 135.pdf7 May 2024
OtherFile: Work Completion Photos PL 135.pdf24 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: sambhav Realtors_deep pearl_plot no 135.pdf29 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 S realtors 135.pdf29 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A PLOT-135 SEC-1.pdf3 Nov 2023
OtherFile: 135.pdf3 Nov 2023
OtherFile: FORM 2A PL135 (Q1).pdf31 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PL-135 QTR 1ST.pdf25 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PL-135 QTR 2ND.pdf25 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PL-135 QTR 3RD.pdf25 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PL-135 QTR 4TH.pdf25 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A PL135 (Q1).pdf24 Jul 2023
OtherFile: Work Completion Photos PL135.pdf24 Jul 2023
OtherFile: Work Completion Photos PL 135.pdf27 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: PL 135.pdf1 Mar 2023
OtherFile: Work Completion Photos PL 135.pdf17 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Sambhav Realtors 135.pdf28 Dec 2022
Proforma of Allotment letterFile: (PL-135) allotment letter as per rera 2.pdf19 Dec 2022
OtherFile: Work Completion Photos PL 135.pdf8 Nov 2022
OtherFile: Work Completion Photo PL-135.pdf5 Aug 2022
OtherFile: Work Completion Photos PL 135.pdf23 Apr 2022
Details of Restarting of Construction work post lockdownFile: Work Completion Photos PL 135.pdf21 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Sambhav Realtors pl 135 Form 5.pdf12 Feb 2022
OtherFile: 20 Wotk Completion Photos - PL 135.pdf22 Jan 2022
OtherFile: Work Completion Photos PL135.pdf24 Oct 2021
OtherFile: Work Completion Photos PL135.pdf22 Jul 2021
OtherFile: Work Completion Photos PL 135 REALTORS.pdf12 Apr 2021
OtherFile: S Realtors PL 135 Deep Peari.pdf2 Feb 2021
OtherFile: S Realtors PL 135 Deep Peari.pdf2 Feb 2021
OtherFile: S Realtors PL 135 Deep Peari.pdf1 Feb 2021
Declaration in FORM BFile: FORM B - RERA - DECLARATION (DEVELOPERS).pdf8 Dec 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf8 Dec 2020
Layout approvalFile: CC BLUE PRINT.pdf4 Dec 2020
Building plan approvalFile: CC BLUE PRINT.pdf4 Dec 2020
PAN CardFile: KIRTI SHAH PAN CARD.pdf4 Dec 2020
Copy of the legal title reportFile: TITLE REPORT.pdf4 Dec 2020
Copy of the legal title reportFile: SEARCH REPORT.pdf4 Dec 2020
Details of encumbrancesFile: DETAILS OF ENCUMBRANCE (DEVELOPERS).pdf4 Dec 2020
Copy of Layout Approval (in case of layout)File: CC BLUE PRINT.pdf4 Dec 2020

Promoter's earlier projects13

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

10 delivered on promise3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Deep DestinyPlot No 33 Sec 2A Karanjade68CompletedMar 2020Sep 2018
Sai DeepPlot No 36 Sec 5A Karanjade23CompletedDec 2019Jan 2019
Deep RisePlot No 111 Sector 5 Karanjade16CompletedMar 2019Mar 2018
Deep DevanshPlot No 30 Sector 1 Karanjade24CompletedJan 2019May 2017
Deep PridePlot No 95 Sector 3 Karanjade13CompletedAug 2018Feb 2018
Shyam ResidencyPlot No 98 Sector 2A Karanjade41CompletedMay 2018Jun 2017
Neal ShivamPlot No 18 Sec 01 Karanjade34CompletedJan 2017Aug 2016
Aruna shivamPlot No 22A Sector 1 karanjade44CompletedAug 2016Oct 2015
BAL GANESHPLOT NO-11B SECTOR-24 KAMOTHE9CompletedJan 2016Feb 2014
Jai Sambhav Lk PlanetPlot No A119 Sector 6 Karanjade119CompletedNov 2015Late, Sep 2016
Jai plazaPlot No 22 Sector 2A karanjade56CompletedFeb 2015Late, Jun 2015
Deep shivamPlot No 48 Sector 4 karanjade54CompletedDec 2014Late, Feb 2015
Shree ganeshPlot No 3 Sector 6 karanjade22CompletedNov 2014Aug 2013

How this compares with Raigarh

27%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 30 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DEEP PEARL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUSHPAK (NEW)5,900+ in Raigarh

2 kmDEEP PEARLCompleted 14Lapsed / revoked 15Other 114Dot size: filed unitsN

Filed coordinates, straight-line distance. 143 registered projects within 2 km.

Builder: KIRTI HEMCHAND SHAH

KIRTI HEMCHAND SHAH has 4 registrations on MahaRERA, including DEEP DIVYA and DEEP RESIDENCE. Its filings disclose 27 earlier MahaRERA projects: declares 22 of 27 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if DEEP PEARL is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DEEP PEARL?

The registered promoter entity is KIRTI HEMCHAND SHAH, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DEEP PEARL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DEEP PEARL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DEEP PEARL?

The professionals named in the filing: Architect: ATUL PATEL; Engineer: B. S. SUKTHANKAR & ASSOCIATES; Chartered Accountant: A ABHISHEK & COMPANY; Chartered Accountant: Agarwal Vikash & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DEEP PEARL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DEEP PEARL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DEEP PEARL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.