Home / Browse projects / Raigarh, Maharashtra / DEEP PEARL
DEEP PEARL
RG-MH-29008 · RERA P52000027548 · Last updated on MahaRERA portal: 23 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 30 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DEEP PEARL is a Residential / Group Housing project by KIRTI HEMCHAND SHAH in Raigarh, Maharashtra, registered with MahaRERA as P52000027548 on 14 Dec 2020. Possession is promised by 31 Dec 2026. The completion date has moved by 30 months from the original filing. 6 of the 22 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameDEEP PEARL
- TypeResidential / Group Housing
- Location
- SECTOR 1
- PUSHPAK (NEW)
- Vadghar (CT)
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000027548
- ReraGenie IDRG-MH-29008
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Dec 2020
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2024)
- Buildings1 building record
- Documents filed90 files
Current status
Figures as on 23 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| DEEP PEARL | NA | 6 | 6 | 22 | 0 | 22 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 23 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.
DEEP PEARL: 81% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 23 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed7
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| ADITYA ASHOK GHARAT | Pargaon | Raigarh |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| DEEP PEARL | NA | Rs 2.13 cr | Rs 2.04 cr |
| - | NA | Rs 8.00 lakh | Rs 4.00 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ATUL PATEL |
| Engineer | B. S. SUKTHANKAR & ASSOCIATES |
| Chartered Accountant | A ABHISHEK & COMPANY |
| Chartered Accountant | Agarwal Vikash & Co. |
| Partner | Role in project |
|---|---|
| KIRTI HEMCHAND SHAH | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterSINCE COMMENCEMENT CERTIFICATE HAS BEEN RECEIVED ON DATED 08/08/2019 AND AFTER THAT LOCKDOWN HAS BEEN IMPOSED BY THE GOVT. DUE TO COVID. WE HAD STARTED THIS PROJECTS ALMOST AFTER MORE THAN ONE YEAR THAT IS WHY PROJECT HAS BEEN DELAYED AND REQUIRED FUTRHER EXTENSION
Reason as filed by the promoterWe have OC received
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Dec 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Dec 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Dec 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed90
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 23 Sep 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 23 Sep 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 23 Sep 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 23 Sep 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 23 Sep 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 23 Sep 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 23 Sep 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 23 Sep 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 23 Sep 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 23 Sep 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 23 Sep 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 23 Sep 2026 |
| Form 5 (FY 2025-2026)File: FORM 5 FY 24-25.pdf | 23 Sep 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 21 Aug 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 21 Aug 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 21 Aug 2026 |
| Form 2A (FY 2024-2025)File: Form 2A 2024-25.pdf | 20 Aug 2026 |
| Form 2A (FY 2025-2026)File: Form 2A 2025-26.pdf | 20 Aug 2026 |
| Form 5 (FY 2023-2024)File: FORM 5 FY 23-24.pdf | 20 Aug 2026 |
| Form 5 (FY 2024-2025)File: FORM 5 FY 24-25.pdf | 20 Aug 2026 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4 FY 24-25.pdf | 19 Apr 2025 |
| OtherFile: Work Completion Photos PL 135.pdf | 19 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A, Q4 FY 24-25.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 PL 135.pdf | 14 Feb 2025 |
| OtherFile: Work Completion Photos PL 135.pdf | 14 Feb 2025 |
| OtherFile: FORM 2A PL 135.pdf | 14 Feb 2025 |
| OtherFile: FORM 2A PL 135.pdf | 22 Nov 2024 |
| OtherFile: Work Completion Photos PL 135.pdf | 22 Nov 2024 |
| OtherFile: Work Completion Photos PL 135.pdf | 26 Jul 2024 |
| OtherFile: S Realtors PL 135.pdf | 26 Jul 2024 |
| Declaration about Commencement CertificateFile: FORMAT D DELARATION OF COMMECEMENT CERTIFICATE.pdf | 25 Jun 2024 |
| Declaration in FORM BFile: Form B RERA EXTENSION.pdf | 25 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT CERTIFICATE.pdf | 25 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEERS CERTIFICATE.pdf | 25 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 25 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory.pdf | 25 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 CA CERTIFICATE.pdf | 25 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A disclosure of interest in other real estate organizations.pdf | 25 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5.pdf | 25 Jun 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account details including no encumbrances on the Bank Account or no escrow o | 25 Jun 2024 |
| OtherFile: Form 2A Plot No 248.pdf | 7 May 2024 |
| OtherFile: Work Completion Photos PL 135.pdf | 7 May 2024 |
| OtherFile: Work Completion Photos PL 135.pdf | 24 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: sambhav Realtors_deep pearl_plot no 135.pdf | 29 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 S realtors 135.pdf | 29 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM-2A PLOT-135 SEC-1.pdf | 3 Nov 2023 |
| OtherFile: 135.pdf | 3 Nov 2023 |
| OtherFile: FORM 2A PL135 (Q1).pdf | 31 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PL-135 QTR 1ST.pdf | 25 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PL-135 QTR 2ND.pdf | 25 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PL-135 QTR 3RD.pdf | 25 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PL-135 QTR 4TH.pdf | 25 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A PL135 (Q1).pdf | 24 Jul 2023 |
| OtherFile: Work Completion Photos PL135.pdf | 24 Jul 2023 |
| OtherFile: Work Completion Photos PL 135.pdf | 27 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: PL 135.pdf | 1 Mar 2023 |
| OtherFile: Work Completion Photos PL 135.pdf | 17 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Sambhav Realtors 135.pdf | 28 Dec 2022 |
| Proforma of Allotment letterFile: (PL-135) allotment letter as per rera 2.pdf | 19 Dec 2022 |
| OtherFile: Work Completion Photos PL 135.pdf | 8 Nov 2022 |
| OtherFile: Work Completion Photo PL-135.pdf | 5 Aug 2022 |
| OtherFile: Work Completion Photos PL 135.pdf | 23 Apr 2022 |
| Details of Restarting of Construction work post lockdownFile: Work Completion Photos PL 135.pdf | 21 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Sambhav Realtors pl 135 Form 5.pdf | 12 Feb 2022 |
| OtherFile: 20 Wotk Completion Photos - PL 135.pdf | 22 Jan 2022 |
| OtherFile: Work Completion Photos PL135.pdf | 24 Oct 2021 |
| OtherFile: Work Completion Photos PL135.pdf | 22 Jul 2021 |
| OtherFile: Work Completion Photos PL 135 REALTORS.pdf | 12 Apr 2021 |
| OtherFile: S Realtors PL 135 Deep Peari.pdf | 2 Feb 2021 |
| OtherFile: S Realtors PL 135 Deep Peari.pdf | 2 Feb 2021 |
| OtherFile: S Realtors PL 135 Deep Peari.pdf | 1 Feb 2021 |
| Declaration in FORM BFile: FORM B - RERA - DECLARATION (DEVELOPERS).pdf | 8 Dec 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 8 Dec 2020 |
| Layout approvalFile: CC BLUE PRINT.pdf | 4 Dec 2020 |
| Building plan approvalFile: CC BLUE PRINT.pdf | 4 Dec 2020 |
| PAN CardFile: KIRTI SHAH PAN CARD.pdf | 4 Dec 2020 |
| Copy of the legal title reportFile: TITLE REPORT.pdf | 4 Dec 2020 |
| Copy of the legal title reportFile: SEARCH REPORT.pdf | 4 Dec 2020 |
| Details of encumbrancesFile: DETAILS OF ENCUMBRANCE (DEVELOPERS).pdf | 4 Dec 2020 |
| Copy of Layout Approval (in case of layout)File: CC BLUE PRINT.pdf | 4 Dec 2020 |
Promoter's earlier projects13
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Deep Destiny | Plot No 33 Sec 2A Karanjade | 68 | Completed | Mar 2020 | Sep 2018 |
| Sai Deep | Plot No 36 Sec 5A Karanjade | 23 | Completed | Dec 2019 | Jan 2019 |
| Deep Rise | Plot No 111 Sector 5 Karanjade | 16 | Completed | Mar 2019 | Mar 2018 |
| Deep Devansh | Plot No 30 Sector 1 Karanjade | 24 | Completed | Jan 2019 | May 2017 |
| Deep Pride | Plot No 95 Sector 3 Karanjade | 13 | Completed | Aug 2018 | Feb 2018 |
| Shyam Residency | Plot No 98 Sector 2A Karanjade | 41 | Completed | May 2018 | Jun 2017 |
| Neal Shivam | Plot No 18 Sec 01 Karanjade | 34 | Completed | Jan 2017 | Aug 2016 |
| Aruna shivam | Plot No 22A Sector 1 karanjade | 44 | Completed | Aug 2016 | Oct 2015 |
| BAL GANESH | PLOT NO-11B SECTOR-24 KAMOTHE | 9 | Completed | Jan 2016 | Feb 2014 |
| Jai Sambhav Lk Planet | Plot No A119 Sector 6 Karanjade | 119 | Completed | Nov 2015 | Late, Sep 2016 |
| Jai plaza | Plot No 22 Sector 2A karanjade | 56 | Completed | Feb 2015 | Late, Jun 2015 |
| Deep shivam | Plot No 48 Sector 4 karanjade | 54 | Completed | Dec 2014 | Late, Feb 2015 |
| Shree ganesh | Plot No 3 Sector 6 karanjade | 22 | Completed | Nov 2014 | Aug 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 90 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DEEP PEARL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PUSHPAK (NEW)5,900+ in Raigarh
Filed coordinates, straight-line distance. 143 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: KIRTI HEMCHAND SHAH
KIRTI HEMCHAND SHAH has 4 registrations on MahaRERA, including DEEP DIVYA and DEEP RESIDENCE. Its filings disclose 27 earlier MahaRERA projects: declares 22 of 27 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if DEEP PEARL is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DEEP PEARL?
The registered promoter entity is KIRTI HEMCHAND SHAH, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DEEP PEARL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DEEP PEARL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DEEP PEARL?
The professionals named in the filing: Architect: ATUL PATEL; Engineer: B. S. SUKTHANKAR & ASSOCIATES; Chartered Accountant: A ABHISHEK & COMPANY; Chartered Accountant: Agarwal Vikash & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DEEP PEARL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback