DEEP DIVINE-5

By SAMBHAV ESTATE

RG-MH-27940 · RERA P52000024624 · Last updated on MahaRERA portal: 13 Dec 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Apr 2024Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 45 documents Report an error

DEEP DIVINE-5 is a Others project by SAMBHAV ESTATE in Raigarh, Maharashtra, registered with MahaRERA as P52000024624 on 24 Feb 2020. The registration is recorded completed; possession was promised by 30 Apr 2024.

At a glance

Project

  • NameDEEP DIVINE-5
  • TypeOthers
  • Location
    • SECTOR R4
    • PUSHPAK (NEW)
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • RERA no.P52000024624
  • ReraGenie IDRG-MH-27940

Builder

  • NameSAMBHAV ESTATE
  • Entity typePartnership
  • PartnerHARILAL SHAMJI PATEL
  • Declared earlier projects13 →

Key dates

this monthRegisteredFeb 2020PromisedApr 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Feb 2020
  • Promised completion30 Apr 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed45 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DEEP DIVINE-5NA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

DEEP DIVINE-5: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed10

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots10
Closed/Covered9
Open Space1

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area490 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
DAYAL GANGARAM PAWARKolhi koparRaigarh
EKNATH GANGARAM PAWARKolhi koparRaigarh

Approvals and building plan

Permissible FSI733.44
Proposed, not sanctioned733 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 5-8 MORESHWAR HEIGHTS KAMOTHE 410209

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
SAMBHAV ESTATE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Feb 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Feb 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Feb 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Jun 2023

Documents filed45

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 S ESTATE PL 21 FY 23-24.pdf13 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Sambhav Estate _Deep divine - 5 _Plot no 21.pdf28 Dec 2023
OtherFile: FORM 2A PL 21 (Q1).pdf31 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PL-21 QTR 1ST.pdf25 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PL-21 QTR 2ND .pdf25 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PL-21 QTR 3RD .pdf25 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PL-21 QTR 4THpdf.pdf25 Jul 2023
OtherFile: Work Completion Photos PL21.pdf25 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC COPY.pdf17 Jun 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf17 Jun 2023
OtherFile: Work Completion Photos PL 21.pdf27 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: PL 21 F Y 19-20.pdf1 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: PL 21 F Y 20-21.pdf1 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: PL 21 F Y 21-22.pdf1 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 s estate 19-20.pdf1 Feb 2023
OtherFile: Work Completion Photos PL 21.pdf21 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 s estate 21-r4.pdf17 Dec 2022
OtherFile: Work Completion Photos PL 21.pdf8 Nov 2022
Proforma of Allotment letterFile: (PL-21) Draft allotment letter as per rera.pdf14 Oct 2022
OtherFile: Work Completion Photo PL-21 (1).pdf4 Aug 2022
OtherFile: Work Completion Photo PL 21.pdf23 Apr 2022
Details of Restarting of Construction work post lockdownFile: Work Completion Photo PL 21.pdf21 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Sambhav Estate_Deep Divine-5.pdf8 Feb 2022
OtherFile: 18 Work Completion Photos - PL 21.pdf22 Jan 2022
OtherFile: Work Completion Photos PL21.pdf24 Oct 2021
OtherFile: Work Completion Photos PL 21.pdf22 Jul 2021
OtherFile: Work Completion photos PL 21 ESTATE.pdf12 Apr 2021
OtherFile: S Estate PL 21 R4 Deep divine-compressed.pdf2 Feb 2021
OtherFile: WORK COMPLETED PHOTOS.pdf22 Oct 2020
OtherFile: BUILDING PHOTOS.pdf24 Aug 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA CERTIFICATE.pdf8 Feb 2020
Layout approvalFile: PL- 21 CC BLUE PRINT.pdf5 Feb 2020
Building plan approvalFile: PL- 21 CC BLUE PRINT.pdf5 Feb 2020
PAN CardFile: PAN CARD.pdf5 Feb 2020
Copy of the legal title reportFile: SEARCH REPORT.pdf5 Feb 2020
Copy of the legal title reportFile: TITLE REPORT.pdf5 Feb 2020
Details of encumbrancesFile: DETAILS OF ENCUMBRANCE (DEVELOPERS).pdf5 Feb 2020
Copy of Layout Approval (in case of layout)File: PL- 21 CC BLUE PRINT.pdf5 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: PL- 21 CC BLUE PRINT.pdf5 Feb 2020
Commencement Certificates / NA Order for plotted developmentFile: CC COPY-1-4.pdf5 Feb 2020
Commencement Certificates / NA Order for plotted developmentFile: CC COPY-5-8.pdf5 Feb 2020
Commencement Certificates / NA Order for plotted developmentFile: CC COPY-9-13.pdf5 Feb 2020
Declaration in FORM BFile: FORM B - RERA - DECLARATION (DEVELOPERS).pdf5 Feb 2020
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf5 Feb 2020
Proforma of Allotment letterFile: DRAFT AGREEMENT FOR SALE PLOT NO 21 R4 490 MTR SAMBHAV ESTATES.pdf5 Feb 2020

Promoter's earlier projects13

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

10 delivered on promise3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Deep DestinyPlot No 33 Sec 2A Karanjade68CompletedMar 2020Sep 2018
Sai DeepPlot No 36 Sec 5A Karanjade23CompletedDec 2019Jan 2019
Deep RisePlot No 111 Sector 5 Karanjade16CompletedMar 2019Mar 2018
Deep DevanshPlot No 30 Sector 1 Karanjade24CompletedJan 2019May 2017
Deep PridePlot No 95 Sector 3 Karanjade13CompletedAug 2018Feb 2018
Shyam ResidencyPlot No 98 Sector 2A Karanjade41CompletedMay 2018Jun 2017
Neal ShivamPlot No 18 Sec 01 Karanjade34CompletedJan 2017Aug 2016
Aruna shivamPlot No 22A Sector 1 karanjade44CompletedAug 2016Oct 2015
BAL GANESHPlot No 11B Sector 24 kamothe9CompletedJan 2016Feb 2014
Jai Sambhav Lk PlanetPlot No A119 Sector 6 Karanjade119CompletedNov 2015Late, Sep 2016
Jai plazaPlot No 22 Sector 2A karanjade56CompletedFeb 2015Late, Jun 2015
Deep shivamPlot No 48 Sector 4 karanjade54CompletedDec 2014Late, Feb 2015
Shree ganeshPlot No 3 Sector 6 karanjade22CompletedNov 2014Aug 2013

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DEEP DIVINE-5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUSHPAK (NEW)5,900+ in Raigarh

Builder: SAMBHAV ESTATE

SAMBHAV ESTATE has 1 registration on MahaRERA, including DEEP DIVINE-5. Its filings disclose 13 earlier MahaRERA projects: declares 10 of 13 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if DEEP DIVINE-5 is delayed beyond 30 Apr 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DEEP DIVINE-5?

The registered promoter entity is SAMBHAV ESTATE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DEEP DIVINE-5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DEEP DIVINE-5?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in DEEP DIVINE-5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DEEP DIVINE-5. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DEEP DIVINE-5 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.