Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2020Possession promisedregistration recorded completed
50 of 55Construction stages doneacross 5 buildings; furthest along: Podiums (if any), 0%
0 of 109Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 32 documents Report an error

DEEP CITY 1 is a Residential / Group Housing project by DEEP MILAN ENTERPRISES in Raigarh, Maharashtra, registered with MahaRERA as P52000027891 on 10 Jan 2021. The registration is recorded completed; possession was promised by 31 Dec 2020. 109 of the 109 units on this registration are recorded sold or booked, and 50 of 55 construction stages are filed complete.

At a glance

Project

  • NameDEEP CITY 1
  • TypeResidential / Group Housing
  • Location
    • PANVEL
    • Usarli Kh
    • Raigarh
    • 410218
  • Pincode410218
  • RERA no.P52000027891
  • ReraGenie IDRG-MH-29129

Builder

  • NameDEEP MILAN ENTERPRISES
  • Entity typePartnership
  • GSTIN27AAJFD5585E1Z8
  • PartnersLAKHMAN GOVABHAI BHATESHRA, NARAYAN DHANJI DUBARIYA, LALJI AMBAVI DUBARIYA, AMBALAL BHAGWANJI RAVARIYA, NARAN AMBA CHOUDHARI, HARESHBHAI BHACHUBHAI CHOUDHARY, RAMESHCHANDRA MOHANLAL SAMAR, SUSHIL RAJMAL CHORDIA, KAPIL ARJUNLAL BAPNA, JASWANTKUMAR SOHANLAL JAIN, GELJI PARBAT PATEL, ANILKUMAR SOHANLAL SINGHVI
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects2 →

Key dates

Registered
10 Jan 2021
Promised
31 Dec 2020

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 Jan 2021
  • Promised completion31 Dec 2020
  • Revised completionNone
  • Buildings5 building records
  • Documents filed32 files

Current status

100%109 of 109 units booked

Figures as on 18 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING A-1NA5435035
BUILDING B-1NA5321021
BUILDING C-1NA5325025
BUILDING D-1NA5328028
CLUB HOUSENA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 18 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

50 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.

BUILDING A-191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING B-191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING C-191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING D-191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
CLUB HOUSE91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Closed/Covered4
Open Space24
BuildingClosed/CoveredOpen SpaceTotal
BUILDING A-1145
BUILDING B-1145
BUILDING C-1145
BUILDING D-1145
CLUB HOUSE088

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,265 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Mar 2026

Approvals and building plan

Sanctioning authorityGroup Gram Panchayat, Usarli-Khurd
Permissible FSI4680.96
Proposed, not sanctioned4,681 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSIDDHIVINAYAK APT, MATHERAN ROAD , PANVEL EAST, NEW PANVEL , RAIGAD 410206

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBUILTECH ENTERPRISES
EngineerBUILTECH ENTERPRISES
Chartered AccountantYOGESH NANDA
Chartered AccountantPreeti Chaudhary & Associates
PartnerRole in project
DEEP MILAN ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Dec 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Dec 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jan 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jan 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 12 Jan 2024

Documents filed32

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Declaration for OC and Society Registration Certificate (4 buildings).pdf18 Jun 2026
Occupational CertificateFile: Society Registration Certificate (4 buildings).pdf18 Jun 2026
Occupational CertificateFile: OC along with declaration.pdf27 Apr 2026
Occupational CertificateFile: A1 - Layout plan.pdf27 Apr 2026
Occupational CertificateFile: B1- Layout plan.pdf27 Apr 2026
Occupational CertificateFile: C1 - Layout plan.pdf27 Apr 2026
Occupational CertificateFile: D1 - Layout plan.pdf27 Apr 2026
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Ocupation Certificate F-3.pdf12 Jan 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: Furdetion Certificate.pdf12 Jan 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: A-1 Registation Certficate.pdf12 Jan 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: B-1 Registation Certificate.pdf12 Jan 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: C-1 Registation Certificate.pdf12 Jan 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: D-1 Registation Certificate.pdf12 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Fom 5 FY 2020-21 Deep City 1.pdf25 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 FY 2021-22 DEEP CITY 1.pdf25 Feb 2023
Details of encumbrancesFile: EN CERTIFICATE.pdf6 Jan 2021
Commencement Certificates / NA Order for plotted developmentFile: commencement Certificate deep city (1).pdf6 Jan 2021
PAN CardFile: deepmilan pancard.pdf4 Jan 2021
Building plan approvalFile: NA Order.pdf1 Jan 2021
Building Plan Approval / NA Order for plotted developmentFile: NA Order.pdf1 Jan 2021
Declaration in FORM BFile: AFFIODAVIT-DEEP CITY1.pdf1 Jan 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEEP MILAN RERA1.pdf1 Jan 2021
Proforma of Allotment letterFile: Performa Allotment Deepcity.pdf1 Jan 2021
Layout approvalFile: PLAN 1.pdf23 Dec 2020
Layout approvalFile: PLAN 2.pdf23 Dec 2020
Layout approvalFile: PLAN 3.pdf23 Dec 2020
Layout approvalFile: PLAN 4.pdf23 Dec 2020
Copy of the legal title reportFile: TITLE REPORT-compressed.pdf23 Dec 2020
Copy of Layout Approval (in case of layout)File: PLAN 1.pdf23 Dec 2020
Copy of Layout Approval (in case of layout)File: PLAN 2.pdf23 Dec 2020
Copy of Layout Approval (in case of layout)File: PLAN 3.pdf23 Dec 2020
Copy of Layout Approval (in case of layout)File: PLAN 4.pdf23 Dec 2020

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
DEEP CITY PHASE - 1SURVEY NO 150-1 Hissa No 1-2-3 Usarli Village Ta Panvel Raigad403CompletedOct 2016Late, Dec 2016
GURUKUL RESIDENCYSURVEY NO 144 PLOT NO 3 AND 4 VICHUMBE VILLAGE TA PANVEL RAIGAD 41020642CompletedMar 2015Late, Dec 2015

How this compares with Raigarh

100%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DEEP CITY 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PANVEL5,900+ in Raigarh

Builder: DEEP MILAN ENTERPRISES

DEEP MILAN ENTERPRISES has 2 registrations on MahaRERA, including DEEP CITY and DEEP CITY 1. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if DEEP CITY 1 is delayed beyond 31 Dec 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DEEP CITY 1?

The registered promoter entity is DEEP MILAN ENTERPRISES, a partnership as per the filing. Its GSTIN 27AAJFD5585E1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DEEP CITY 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DEEP CITY 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DEEP CITY 1?

The professionals named in the filing: Architect: BUILTECH ENTERPRISES; Engineer: BUILTECH ENTERPRISES; Chartered Accountant: YOGESH NANDA; Chartered Accountant: Preeti Chaudhary & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DEEP CITY 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DEEP CITY 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DEEP CITY 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.