Home / Browse projects / Palghar, Maharashtra / DATTACHHAYA

Registered Litigation declared Residential / Group Housing project

DATTACHHAYA

By JAGDISH MANOHAR MHATRE

RG-MH-07003 · RERA P99000054805 · Last updated on MahaRERA portal: 29 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • Completion date moved by 14 months
  • 1 extension taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Nov 2026Possession promisedmoved 14 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 84%
116 of 168Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

DATTACHHAYA is a Residential / Group Housing project by JAGDISH MANOHAR MHATRE in Palghar, Maharashtra, registered with MahaRERA as P99000054805 on 12 Feb 2024. Possession is promised by 30 Nov 2026. The completion date has moved by 14 months from the original filing. 52 of the 168 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameDATTACHHAYA
  • TypeResidential / Group Housing
  • Location
    • M B ESTATE ROAD
    • VIRAR WEST
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401303
  • Pincode401303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000054805
  • ReraGenie IDRG-MH-07003

Builder

  • NameJAGDISH MANOHAR MHATRE
  • Entity typeIndividual
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2024First promiseSep 2025Revised toNov 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Feb 2024
  • Promised completion30 Nov 2026
  • Revised completionRevised to 30 Nov 2026 (originally 30 Sep 2025)
  • Buildings1 building record
  • Documents filed64 files

Current status

31%52 of 168 units booked
33.1%Work done, per cost certificate

Figures as on 29 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DATTACHHAYANA191914622168

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 84%.

DATTACHHAYA: 42% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure84%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises19%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks59%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed90

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots90
Closed/Covered64
Open Space26

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,537 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Sep 2025
LandownerVillageDistrict
DATTACHHAYA CHSLVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVASAI VIRAR CITY MUNCIPAL CORPORATION
Permissible FSI10336.42
Proposed, not sanctioned10,336 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGAOTHAN ROAD, VIRAR WEST, TAL-VASAI, PIN-401303
Estimated costRs 37.00 cr
Cost incurredRs 12.25 cr
Work done33.11%
BuildingWingEstimatedIncurred
DATTACHHAYANARs 34.00 crRs 12.25 cr
-NARs 3.00 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANAT MEHTA
EngineerABHISHEK LENGARE
Chartered AccountantDARSHAN B RAUT & ASSOCIATES
Chartered AccountantB. K. MAJITHIA AND CO.
PartnerRole in project
JAGDISH MANOHAR MHATRE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA23092502678Sep 2025 → Nov 2026

Reason as filed by the promoterhe delay in completion has primarily been due to: 1. Pending Government Approvals: We are awaiting the amendment of the new Commencement Certificate, and the concerned authority has taken longer than anticipated in processing the same. This has impacted the timely execution of construction activities. 2. Contractor’s Personal/Family Issues: Our appointed contractor faced unavoidable personal and family-related issues, which affected manpower deployment and caused further delays in the progress of work.

Litigation declared2

CaseCourtStatus
414/2022VASAI COURTPENDING
R.C.S./0000414/2022/2022COURT OF CIVIL JUDGE (J.D.) AT VASAIOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jan 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jan 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2026

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: OMSAIOM-2A-FY25-26.pdf29 Jul 2026
Withdrawal Update Form 1File: FORM-1.pdf27 Jun 2026
Withdrawal Update Form 2File: FORM-2.pdf27 Jun 2026
Withdrawal Update Form 3File: Form-3-MARCH-2026.pdf27 Jun 2026
Form 5 (FY 2024-2025)File: Form 5 FY-24-25.pdf27 Jun 2026
Form 5 (FY 2023-2024)File: FORM 5 FY 2023-24.pdf27 Jun 2026
Withdrawal Update Form 1File: FORM- 1122 E Arch Cft July-Sept 2025.pdf12 May 2026
Withdrawal Update Form 1File: FORM-1-Arch cft Dattachhya (Oct-Dec 2025).pdf12 May 2026
Withdrawal Update Form 2File: FORM-2 - Adobe Scan 30-OCT-2025.pdf12 May 2026
Withdrawal Update Form 2File: FORM-2 Adobe Scan 6 Mar 2026 (1).pdf12 May 2026
Withdrawal Update Form 3File: Form-III_July to Sept 2025.pdf12 May 2026
Withdrawal Update Form 3File: Form-III-Oct-Dec-25.pdf12 May 2026
Layout approvalFile: LAYOUT.pdf9 Jan 2026
Building plan approvalFile: B1.pdf9 Jan 2026
Building plan approvalFile: B2.pdf9 Jan 2026
Building plan approvalFile: B3.pdf9 Jan 2026
Withdrawal Update Form 1File: Arch Ctf (April-June-2025)-(Form-I).pdf12 Sep 2025
Withdrawal Update Form 2File: ENGINEER FORM-2- Adobe Scan 22 Aug 2025.pdf12 Sep 2025
Withdrawal Update Form 3File: FORM-3 -OM SAI OM CONSTRUCTION -JUNE-25.pdf12 Sep 2025
Withdrawal Update Form 1File: FORM 1.pdf11 Sep 2025
Withdrawal Update Form 2File: FORM2.pdf11 Sep 2025
Withdrawal Update Form 3File: FORM 3 01-02-2024.pdf11 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2_FORM 3 JAN-24 TO MAR-24.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3_FORM 3 APRIL-24 TO JUNE-24.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4_FORM 3 JULY-24 TO SEPT-24.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5_FORM 3 OCT-24 TO DEC-24.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_FORM-2-Jan-Mar-24.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3_FORM-2-JUNE-2024.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4_FORM-2-SEPT-2024.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5_FORM-2 -DEC-2025.pdf11 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FY 2023-24.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 01-02-2024.pdf1 Feb 2024
Details of encumbrances concerned to FinanceFile: FINANCE.pdf18 Jan 2024
Details of encumbrances concerned to LegalFile: FINANCE.pdf18 Jan 2024
Copy of the legal title reportFile: Dattachaya Letter.pdf9 Jan 2024
Proforma of Agreement for saleFile: Dattachaya Letter.pdf9 Jan 2024
Proforma of Allotment letterFile: Dattachaya Letter.pdf9 Jan 2024
Details of encumbrances concerned to FinanceFile: 6_ENCUMBRANCE LETTER LEGAL.pdf26 Dec 2023
Details of encumbrances concerned to LegalFile: 6_ENCUMBRANCE LETTER LEGAL.pdf26 Dec 2023
Declaration about Commencement CertificateFile: CC DECLARATION -1.pdf19 Dec 2023
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCE LETTER.pdf18 Nov 2023
Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCE LETTER.pdf18 Nov 2023
CERSAI detailsFile: 5_CERSAI.pdf18 Nov 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: PARTNER INTEREST LETTER.pdf18 Nov 2023
Proforma of Agreement for saleFile: 8_Model Form of Agreement-2023 RERA First Sale Agreement-.pdf18 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPERATE BANK AC.pdf18 Nov 2023
Deviation Report with respect to Allotment letterFile: 3_ALLOTMENT DEVATION.pdf18 Nov 2023
Deviation Report with respect to model copy of AgreementFile: 2-AGREEMENT DEVATION.pdf18 Nov 2023
Layout approvalFile: LAYOUT-PLAN.pdf2 Nov 2023
Building plan approvalFile: BUILDING-1.pdf2 Nov 2023
Building plan approvalFile: BUILDING-2.pdf2 Nov 2023
Building plan approvalFile: BUILDING-3.pdf2 Nov 2023
PAN CardFile: PAN CARD-JAGDISH MHATRE.pdf2 Nov 2023
Copy of the legal title reportFile: NEW LEGAL REPORT.pdf2 Nov 2023
Copy of Layout Approval (in case of layout)File: LAYOUT-PLAN.pdf2 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING-1.pdf2 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING-2.pdf2 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING-3.pdf2 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE-1.pdf2 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: COMMECEMENT-CERTIFICATE-2.pdf2 Nov 2023
Declaration in FORM BFile: B FORM-DEVELOPERS.pdf2 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf2 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2.pdf2 Nov 2023
Proforma of Allotment letterFile: Allotment letter.pdf2 Nov 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationRegisteredStatusPromisedDelivered
VIVA AAKANKSHA COMPLEX PHASE 1P99000007383Vasai-Virar City (M Corp), PalgharAug 2017Certificate SignedDec 2017Late, Oct 2018

How this compares with Palghar

31%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 14 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DATTACHHAYA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VIRAR WEST3,200+ in Palghar

2 kmDATTACHHAYACompleted 64Lapsed / revoked 40Other 99Dot size: filed unitsN

Filed coordinates, straight-line distance. 203 registered projects within 2 km.

Builder: JAGDISH MANOHAR MHATRE

JAGDISH MANOHAR MHATRE has 1 registration on MahaRERA, including DATTACHHAYA. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if DATTACHHAYA is delayed beyond 30 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DATTACHHAYA?

The registered promoter entity is JAGDISH MANOHAR MHATRE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DATTACHHAYA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DATTACHHAYA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DATTACHHAYA?

The professionals named in the filing: Architect: SANAT MEHTA; Engineer: ABHISHEK LENGARE; Chartered Accountant: DARSHAN B RAUT & ASSOCIATES; Chartered Accountant: B. K. MAJITHIA AND CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DATTACHHAYA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DATTACHHAYA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DATTACHHAYA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.