Home / Browse projects / Palghar, Maharashtra / DANGE CHAWRE CROWN B WING
DANGE CHAWRE CROWN B WING
RG-MH-02928 · RERA P99000020884 · Last updated on MahaRERA portal: 26 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 24 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DANGE CHAWRE CROWN B WING is a Residential / Group Housing project by DANGE DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000020884 on 16 May 2019. Possession is promised by 5 May 2027. The completion date has moved by 24 months from the original filing. 31 of the 108 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.
At a glance
Project
- NameDANGE CHAWRE CROWN B WING
- TypeResidential / Group Housing
- Location
- NIL
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401203
- Pincode401203
- RERA no.P99000020884
- ReraGenie IDRG-MH-02928
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 May 2019
- Promised completion5 May 2027
- Revised completionRevised to 5 May 2027 (originally 5 May 2025)
- Buildings1 building record
- Documents filed94 files
Current status
Figures as on 26 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| DANGE CHAWRE CROWN B WING | NA | 18 | 16 | 108 | 0 | 108 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 26 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 86%.
DANGE CHAWRE CROWN B WING: 64% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 86% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
Progress on shared amenities15
As on 26 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 35% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 90% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed36
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| DANGE CHAWRE CROWN B WING | NA | Rs 17.91 cr | Rs 15.40 cr |
| - | NA | Rs 3.60 cr | Rs 1.44 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANAT MEHTA & ASSOCIATES |
| Engineer | SHILPLEKHA CONSULTANT |
| Chartered Accountant | STR & ASSOSIATES |
| Chartered Accountant | HARESH MEHTA & ASSOCIATES |
| Partner | Role in project |
|---|---|
| DANGE DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDear Sir, Due to the recent revision in the project’s Floor Space Index (FSI), we kindly request an extension for the completion of the project. We anticipate that additional time will be required to accommodate these changes and ensure the project's successful completion. Therefore, we respectfully request an extension of the project completion deadline to 05-05-2027. Thanking you,
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Mar 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Jun 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Jun 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Jun 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 5 May 2027
Documents filed94
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2023-2024)File: FORM 5 FY_2023-24.pdf | 26 Jun 2026 |
| Withdrawal Update Form 1File: FORM 1 - MAR 2026.pdf | 29 May 2026 |
| Withdrawal Update Form 2File: FORM 2 - MAR 2026.pdf | 29 May 2026 |
| Withdrawal Update Form 3File: FORM 3_DANGE DEV 4B_Q4 MAR 2026- SIGNED.pdf | 29 May 2026 |
| Form 5 (FY 2024-2025)File: FORM 5_FY 2024-2025-SIGNED.pdf | 10 Mar 2026 |
| Withdrawal Update Form 1File: FORM 1 - DEC 2025.pdf | 10 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2 - DEC 2025.pdf | 10 Feb 2026 |
| Withdrawal Update Form 3File: FORM 3_DANGE DEV 4B_QE DEC 25-SIGNED.pdf | 10 Feb 2026 |
| Form 1File: FORM 1 - JUNE 2025.pdf | 11 Nov 2025 |
| Form 2File: FORM 2 - JUNE 2025.pdf | 11 Nov 2025 |
| Form 3File: FORM 3_DANGE DEV 4B_QE JUNE 25-SIGNED.pdf | 11 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY - JUNE 2025.pdf | 11 Nov 2025 |
| Form 1File: FORM 1 - SEP 2025.pdf | 11 Nov 2025 |
| Form 2File: FORM 2 - SEP 2025.pdf | 11 Nov 2025 |
| Form 3File: FORM 3_DANGE DEV 4B_QE SEP 25-SIGNED.pdf | 11 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY - SEP 2025.pdf | 11 Nov 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cft Form I Jan-March Bldg 4 Wing B.pdf | 16 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf | 16 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DETAIL DTD 31 03 25.pdf | 16 Jun 2025 |
| Layout approvalFile: PLAN HL.pdf | 13 Jun 2025 |
| Building plan approvalFile: BLDG PLAN.pdf | 13 Jun 2025 |
| Copy of Layout Approval (in case of layout)File: PLAN HL.pdf | 13 Jun 2025 |
| Certificates of CA (Form 3)File: FORM 3_DANGE DEV 4B_QE MAR 25-SIGNED.pdf | 13 Jun 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: RDP 31032023 NEW optimized.pdf | 13 Jun 2025 |
| Building Plan Approval (IOD)File: BLDG PLAN.pdf | 13 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY AS ON 31 12 24 SIGNED.pdf | 2 Apr 2025 |
| Other - FinanceFile: JUSTIFICATION SIGNED.pdf | 2 Apr 2025 |
| Other - FinanceFile: WORK STATUS SIGNED.pdf | 2 Apr 2025 |
| Declaration in FORM BFile: FORM B - AFFIDAVITE REVISED ON RS 500 SP.pdf | 30 Mar 2025 |
| Declaration about Commencement CertificateFile: RDP 31032023 NEW optimized.pdf | 30 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A FY21 22.pdf | 30 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A FY22 23.pdf | 30 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A FY23 24.pdf | 30 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 2024 SIGNED.pdf | 14 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 DEC 2024 CR.pdf | 13 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 MARCH 2024 CR.pdf | 13 Feb 2025 |
| Certificates of CA (Form 3)File: FORM 3_DANGE DEV 4B_QE DEC 24-SIGNED.pdf | 3 Feb 2025 |
| Certificates of CA (Form 3)File: FORM 3_DANGE DEV 4B_QE DEC 24-SIGNED.pdf | 3 Feb 2025 |
| Certificates of CA (Form 3)File: FORM 3_DANGE DEV 4B_QE DEC 24-SIGNED.pdf | 3 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cft Form I Oct-Dec 2024 Bldg 4 Wing B.pdf | 25 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE FOR Q-3.pdf | 25 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cft Form I Oct-Dec 2024 Bldg 4 Wing B.pdf | 25 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE FOR Q-3.pdf | 25 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cft Form I Oct-Dec 2024 Bldg 4 Wing B.pdf | 25 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE FOR Q-3.pdf | 25 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cft Form I July-Sept 2024 Bldg 4 Wing B Dange Complex.pdf | 12 Dec 2024 |
| Certificates of CA (Form 3)File: FORM 3 Q4-DANG DEV.pdf | 12 Dec 2024 |
| Certificates of CA (Form 3)File: FORM 3_Tower 4B wing_June 2024(SIGNED).pdf | 12 Dec 2024 |
| Certificates of CA (Form 3)File: FORM 3_Tower 4B wing_SEP 2024(for sign).pdf | 12 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cft Form I July-Sept 2024 Bldg 4 Wing B Dange Complex.pdf | 12 Dec 2024 |
| Certificates of CA (Form 3)File: FORM 3 Q4-DANG DEV.pdf | 12 Dec 2024 |
| Certificates of CA (Form 3)File: FORM 3_Tower 4B wing_June 2024(SIGNED).pdf | 12 Dec 2024 |
| Certificates of CA (Form 3)File: FORM 3_Tower 4B wing_SEP 2024(for sign).pdf | 12 Dec 2024 |
| Certificates of CA (Form 3)File: FORM 3 Q4-DANG DEV.pdf | 12 Dec 2024 |
| Certificates of CA (Form 3)File: FORM 3_Tower 4B wing_June 2024(SIGNED).pdf | 12 Dec 2024 |
| Certificates of CA (Form 3)File: FORM 3_Tower 4B wing_SEP 2024(for sign).pdf | 12 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cft Form I July-Sept 2024 Bldg 4 Wing B Dange Complex.pdf | 12 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cft Form I July-Sept 2024 Bldg 4 Wing B Dange Complex.pdf | 11 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cft Form I July-Sept 2024 Bldg 4 Wing B Dange Complex.pdf | 11 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cft Form I July-Sept 2024 Bldg 4 Wing B Dange Complex.pdf | 11 Dec 2024 |
| Certificates of CA (Form 3)File: FORM 3- DANGE DEV Q3 signed.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cft Form I Bldg 4 Wing B.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cft Form I Bldg 4 Wing B Dange Complex.pdf | 7 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cft Form I Bldg 4 Wing B.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cft Form I Bldg 4 Wing B Dange Complex.pdf | 7 Oct 2024 |
| Certificates of CA (Form 3)File: FORM 3- DANGE DEV Q3 signed.pdf | 7 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SCAN COPY OF FORM 5 DANGE CHAWRE.pdf | 8 Mar 2024 |
| Certificates of CA (Form 3)File: DD RARA FORM 3 CERTIFICATE Q-1 signed.pdf | 20 Oct 2023 |
| Certificates of CA (Form 3)File: DD RERA CA CERTIFICATE Q-2.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf | 17 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate.pdf | 17 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 5 2022.pdf | 25 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 2020.pdf | 25 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 2021.pdf | 25 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 2022.pdf | 25 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: REVISED DEV PLAN opt.pdf | 29 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DECLARATION opt.pdf | 29 Apr 2022 |
| Declaration about Commencement CertificateFile: DECLARATION FOR B WING T-4.pdf | 28 Jul 2021 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| DANGE COPMPLEX TOWER 2 | DANGE COMPLEX NEAR ORCHID SCHOOL SOPARA VILLAGE NALLASOPARA WEST 401203 | 112 | Completed | Nov 2015 | Nov 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 94 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DANGE CHAWRE CROWN B WING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NIL3,200+ in Palghar
Sheetal Yash
DGS BUILDERS AND DEVELOPERS
DEEP SKYRISE
DEEP REALCON LLP
VIMAL CLASSIC
OM VIMAL DEVELOPERS
DHANANJAY HILL VIEW
DHANLAXMI DEVELOPERS
NAKSHATRA AURIS
RAJLAXMI JSB REALTY LLP
COMFORT HERITAGE
SAI RYDAM REAL ESTATE DEVELOPERS LLP
See every Palghar project, with the district possession charts
Builder: DANGE DEVELOPERS
DANGE DEVELOPERS has 3 registrations on MahaRERA, including SEAGULL BLDG 3 and DANGE CHAWRE CROWN B WING. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if DANGE CHAWRE CROWN B WING is delayed beyond 5 May 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DANGE CHAWRE CROWN B WING?
The registered promoter entity is DANGE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DANGE CHAWRE CROWN B WING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DANGE CHAWRE CROWN B WING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DANGE CHAWRE CROWN B WING?
The professionals named in the filing: Architect: SANAT MEHTA & ASSOCIATES; Engineer: SHILPLEKHA CONSULTANT; Chartered Accountant: STR & ASSOSIATES; Chartered Accountant: HARESH MEHTA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DANGE CHAWRE CROWN B WING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback