Home / Browse projects / Nagpur, Maharashtra / Daffodil Highs, Unity Studio Apartments and Eternity Villa
Daffodil Highs, Unity Studio Apartments and Eternity Villa
By FIRE Arcor Infrastructure Private Limited
RG-MH-00656 · RERA P50500001342 · Last updated on MahaRERA portal: 30 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 4 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Daffodil Highs, Unity Studio Apartments and Eternity Villa is a Residential / Group Housing project by FIRE Arcor Infrastructure Private Limited in Nagpur, Maharashtra, registered with MahaRERA as P50500001342 on 27 Jul 2017. Possession is promised by 30 Dec 2027. 83 of the 251 units on this registration are recorded sold or booked, and 63 of 99 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameDaffodil Highs, Unity Studio Apartments and Eternity Villa
- TypeResidential / Group Housing
- Location
- Kotewada Road
- Kothewada
- Hingna
- Nagpur
- 441122
- Pincode441122
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500001342
- ReraGenie IDRG-MH-00656
Builder
- NameFIRE Arcor Infrastructure Private Limited
- Entity typeCompany
- GSTIN27AABCF0909M1ZL
- DirectorsSiddharth Nandlal Saraf, Sachin Dharne
- Executive DirectorSanidhya Saraf
- Whole Time DirectorSwapan Manoranjan Bhattacharjee
- Declared earlier projects5 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Jul 2017
- Promised completion30 Dec 2027
- Revised completionNone
- Buildings9 building records
- Documents filed141 files
Current status
Figures as on 30 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Daffodil Highs 18-X | NA | 9 | 7 | 42 | 0 | 42 |
| Daffodil Highs 19-X | NA | 9 | 7 | 42 | 0 | 42 |
| Eternity Villa No 5 | NA | 3 | 3 | 1 | 0 | 1 |
| Eternity Villa No 14 | NA | 3 | 3 | 1 | 0 | 1 |
| Eternity Villa No 19 | NA | 3 | 3 | 1 | 0 | 1 |
| Eternity Villa No 20 | NA | 3 | 3 | 1 | 0 | 1 |
| Eternity Villa No 21 | NA | 3 | 3 | 1 | 0 | 1 |
| Daffodil Highs X-20 | NA | 9 | 7 | 42 | 0 | 42 |
| Unity Studio Apartments | NA | 12 | 10 | 120 | 0 | 120 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building9
As on 30 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
63 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is Internal walls, at 80%.
Daffodil Highs 18-X0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Daffodil Highs 19-X3%
| Activity | Progress |
|---|---|
| Excavation | 15% |
| Basement (if any) | 10% |
| Podiums (if any) | 0% |
| Plinth | 10% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Eternity Villa No 582%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Eternity Villa No 1482%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Eternity Villa No 1982%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Eternity Villa No 2082%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Eternity Villa No 2182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Daffodil Highs X-2087%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Unity Studio Apartments91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities25
As on 30 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 98% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 98% |
| Storm Water Drains | Yes | 98% |
| Landscaping & Tree Planting | Yes | 99% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 95% |
| Solid Waste Management And Disposal | Yes | 60% |
| Water conservation /Rain water harvesting | Yes | 66% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 80% |
| Multi Purpose Hall with restricted facilites like Marriage Hall and Badminton Courts | Yes | 0% |
| Neighbourhood Gardens and Parks | Yes | 95% |
| Neighbourhood Shopping Complex | Yes | 100% |
| Police Chowki | Yes | 100% |
| Reticulated LPG System | Yes | 80% |
| Jogging / Cycling Track | Yes | 100% |
| Common Area Electricity Back Up | Yes | 100% |
| Club House for internal and external members | Yes | 100% |
| CCTV Camera | Yes | 100% |
| Amphitheatre | Yes | 100% |
Parking filed256
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Daffodil Highs 18-X | 18 | 24 | 42 |
| Daffodil Highs 19-X | 18 | 24 | 42 |
| Eternity Villa No 5 | 0 | 2 | 2 |
| Eternity Villa No 14 | 0 | 2 | 2 |
| Eternity Villa No 19 | 0 | 2 | 2 |
| Eternity Villa No 20 | 0 | 2 | 2 |
| Eternity Villa No 21 | 0 | 2 | 2 |
| Daffodil Highs X-20 | 18 | 24 | 42 |
| Unity Studio Apartments | 0 | 120 | 120 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rajiv Choudhary |
| Engineer | Dhiraj Jagyasi |
| Chartered Accountant | Saurabh Bajaj |
| Chartered Accountant | RK Ganeriwala |
| Partner | Role in project |
|---|---|
| FIRE Arcor Infrastructure Private Limited | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12601635 | ANANTKUMAR PRALHAD GUPTA | FIRE Arcor Infrastructure Private Limited | 23/03/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Nov 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 27 Jun 2024
Documents filed141
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 141 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 31 03 2026.pdf | 30 May 2026 |
| Form 2File: Form 2 31 03 2026.pdf | 30 May 2026 |
| Form 3File: Form 3 31 03 2026_compressed.pdf | 30 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 31 03 2026_compressed.pdf | 30 May 2026 |
| Form 1File: Form 1 Dec2025.pdf | 30 May 2026 |
| Form 2File: Form2 Dec2025.pdf | 30 May 2026 |
| Form 3File: Form 3 Dec2025_compressed (1).pdf | 30 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory.pdf | 30 May 2026 |
| Form 1File: RERA Architect Certificate Upto Sept 2025.pdf | 30 May 2026 |
| Form 2File: RERA Engineer Certificate RS Sep 2025.pdf | 30 May 2026 |
| Form 3File: RERA CA Sep 2025 compressed.pdf | 30 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory.pdf | 30 May 2026 |
| Form 1File: Form 1.pdf | 30 May 2026 |
| Form 2File: Engineer Certificate June 2025.pdf | 30 May 2026 |
| Form 3File: Form 3 June 25.pdf | 30 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory.pdf | 30 May 2026 |
| Form 1File: Rera Architect certificate Mar-25_RS.pdf | 30 May 2026 |
| Form 2File: Form 2.pdf | 30 May 2026 |
| Form 3File: CA Certificate 31 03 2025 RS.pdf | 30 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory.pdf | 30 May 2026 |
| Form 1File: form 1 Architect certificate dec-24_compressed.pdf | 30 May 2026 |
| Form 2File: Form 2 RERA Engineer certificate dec-24_compressed.pdf | 30 May 2026 |
| Form 3File: Form 3 CA Rera certificate dec-24 (1)_compressed.pdf | 30 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory.pdf | 30 May 2026 |
| Form 1File: Form 1 3 Sep 2024.pdf | 30 May 2026 |
| Form 2File: Form 2 3 Sep 2024.pdf | 30 May 2026 |
| Form 3File: Form-3 Sep 2024.pdf | 30 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory.pdf | 30 May 2026 |
| Form 1File: Form 1.pdf | 30 May 2026 |
| Form 2File: Engineer Certificate June 2025.pdf | 30 May 2026 |
| Form 3File: Form 3 June 25.pdf | 30 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold-Booked Inventory.pdf | 30 May 2026 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate June 2025.pdf | 17 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Architect certificate Mar-25_RS.pdf | 30 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate RS.pdf | 30 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rera Engineer Certificate Upto 31st Mar'2025_RS.pdf | 30 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rera Engineer Certificate Upto 31st Mar'2025_RS.pdf | 30 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 2024.pdf | 30 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 Architect certificate dec-24_compressed.pdf | 24 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 CA Rera certificate dec-24 (1)_compressed.pdf | 24 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 RERA Engineer certificate dec-24_compressed.pdf | 24 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 3 Sep 2024_compressed.pdf | 9 Dec 2024 |
| Certificates of CA (Form 3)File: Form-3 Sep 2024.pdf | 9 Dec 2024 |
| Certificates of CA (Form 5)File: FORM 5 2024.pdf | 9 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 3 Sep 2024_compressed.pdf | 9 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2 3 Sep 2024_compressed.pdf | 9 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 20 X ARCHITECT OC.pdf | 27 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Details March 2024 RS.pdf | 3 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Supervision Certificate.pdf | 30 May 2024 |
| Certificates of CA (Form 3)File: CA certificate Mar-24_compressed.pdf | 25 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 24 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 24 May 2024 |
| Certificates of CA (Form 3)File: Form 3 CA Certificate December 2023.pdf | 8 Feb 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate March 2023.pdf | 29 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate Sep 2023.pdf | 29 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate June 2023.pdf | 29 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Dec 2023_compressed.pdf | 20 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Dec 2023_compressed.pdf | 20 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate March 2023 - RS.pdf | 26 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate June 2023 RS.pdf | 26 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate Sep 2023 RS.pdf | 26 Nov 2023 |
| Certificates of CA (Form 3)File: CA Certificate March 2023 RS.pdf | 26 Nov 2023 |
| Certificates of CA (Form 3)File: CA Certificate June 2023 RS.pdf | 26 Nov 2023 |
| Certificates of CA (Form 3)File: CA Certificate Sep 2023 RS.pdf | 26 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 2022.pdf | 13 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2023.pdf | 13 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Details RS.pdf | 13 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other projects.pdf | 13 Oct 2023 |
| Certificates of CA (Form 5)File: Form 5 2023.pdf | 13 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2019.pdf | 13 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2020.pdf | 13 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2021 RS.pdf | 13 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2023.pdf | 13 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2022.pdf | 13 Oct 2023 |
| Certificates of CA (Form 5)File: RERA_FORM_5-_FIRE_ARCOR.pdf | 28 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Architect certificate.pdf | 14 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf | 14 Oct 2022 |
| Certificates of CA (Form 3)File: CA Certificate Rs 30 09 2022.pdf | 14 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Sales Disclosure 30 09 2021 RS.pdf | 2 Feb 2022 |
| Disclosure of sold/ booked inventoryFile: Sales Disclosure 31 12 2021 RS.pdf | 2 Feb 2022 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Neighborhood Shopping Complex | The Empyrean Township | 10 | Completed | Nov 2016 | Nov 2016 |
| Eternity Villa, Infinity Court Yard Homes, Midrise Apartments, Daffodil Highs | The Empyrean Township | 162 | Completed | Nov 2016 | Nov 2016 |
| Amity Apartments | The Empyrean Township | 54 | Completed | Aug 2015 | Aug 2015 |
| Eternity Villa, Infinity Court yard Homes, Tranquility Town House, Row Houses, Mid Rise Apartments | The Empyrean Township | 767 | Completed | Jun 2015 | Jun 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 141 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Daffodil Highs, Unity Studio Apartments and on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kothewada2,800+ in Nagpur
Filed coordinates, straight-line distance. 33 registered projects within 2 km.
Rivershore Estate
Godrej Skyline Developers Ltd
Godrej Forest Estate
Dream World Landmarks LLP
Vrindavan Phase-3
Radha Madhav Developers
Kalpataru Ardene
Azure Tree Enviro Farms Private Limited
MAHALAXMI NAGAR-10
PADMALAXMI INFRTECH
VRINDAVAN PARK
TIRUPATI DEVELOPERS
See every Nagpur project, with the district possession charts
Builder: FIRE Arcor Infrastructure Private Limited
FIRE Arcor Infrastructure Private Limited has 1 registration on MahaRERA, including Daffodil Highs, Unity Studio Apartments and Eternity Villa. Its filings disclose 5 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if Daffodil Highs, Unity Studio Apartments and Eternity Villa is delayed beyond 30 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Daffodil Highs, Unity Studio Apartments and Eternity Villa?
The registered promoter entity is FIRE Arcor Infrastructure Private Limited, a company as per the filing. Its GSTIN 27AABCF0909M1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Daffodil Highs, Unity Studio Apartments and Eternity Villa?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Daffodil Highs, Unity Studio Apartments and Eternity Villa?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Daffodil Highs, Unity Studio Apartments and Eternity Villa?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Daffodil Highs, Unity Studio Apartments and Eternity Villa?
The professionals named in the filing: Architect: Rajiv Choudhary; Engineer: Dhiraj Jagyasi; Chartered Accountant: Saurabh Bajaj; Chartered Accountant: RK Ganeriwala. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Daffodil Highs, Unity Studio Apartments and Eternity Villa?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback