Red flags

  • Possession 2 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Aug 2026Possession promised2 months past this date
0 of 11Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
51 of 169Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

Daata Eklavya Building A & B is a Others project by Daata Builders and Developers Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000031452 on 23 Oct 2021. Possession was promised by 30 Aug 2026 and is now 2 months past that date. 118 of the 169 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameDaata Eklavya Building A & B
  • TypeOthers
  • Location
    • Chinchavali Shekin
    • Khopoli
    • Khalapur
    • Raigarh
    • 410203
  • Pincode410203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000031452
  • ReraGenie IDRG-MH-73388

Builder

  • NameDaata Builders and Developers Private Limited
  • Entity typeCompany
  • DirectorsAmendra Man Singh Gill, Rupreet Amendraman Singh Gill, Gaurav Amendraman Singh Gill

Key dates

2 months past promisethis monthRegisteredOct 2021PromisedAug 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Oct 2021
  • Promised completion30 Aug 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed90 files

Current status

70%118 of 169 units booked

Figures as on 25 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Daata Eklavya Phase 1 Building ANA70781492
Daata Eklavya Building BNA8077077

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

Daata Eklavya Phase 1 Building A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Daata Eklavya Building BNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 25 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,875 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6024.36
Proposed, not sanctioned6,024 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor Hermes Centre sector 17 Vashi

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKhemant Bhogilal Tailor
EngineerKhemant Bhogilal Tailor
Chartered AccountantSnehal Wani
Chartered AccountantBABULAL HIRJI PATEL
PartnerRole in project
Daata Builders and Developers Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Apr 2024

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: From 1.pdf25 Jun 2026
Form 2File: Form 2.pdf25 Jun 2026
Form 3File: Form 3.pdf25 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Q2 2025-26.pdf25 Jun 2026
Form 1File: Form 1.pdf24 Jun 2026
Form 2File: FORM 2.pdf24 Jun 2026
Form 3File: Form No 3.pdf24 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold unsold.pdf24 Jun 2026
Disclosure of sold/ booked inventoryFile: Sold Unsold List SS.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q4 Form Number 1.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form Number 3 Q4 2024-25.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form Number 2 Q4 2024 25.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form Number 1.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 Form Number 3.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 Form Number 3.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 Form Number 3.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 Form Number 3 SS.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form Number 2.pdf14 Jan 2025
Disclosure of sold/ booked inventoryFile: Q3 2024 25 Sold Unsold List.pdf14 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form No 4 Building A.pdf25 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form No 5 2023-24.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form Number 1 SS.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form Number 2 SS.pdf16 Oct 2024
Disclosure of sold/ booked inventoryFile: Q2 2024 25 Sold Unsold List.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form No 1 Q1 2024 25.pdf12 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q1 2024 25 Form No 2.pdf12 Aug 2024
Disclosure of sold/ booked inventoryFile: Q1 2024 25 Sold Unsold List.pdf12 Aug 2024
Building plan approvalFile: Daata Lyout with Highlight.pdf26 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Daata Lyout with Highlight.pdf26 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Amended CC.pdf26 Jun 2024
Declaration about Commencement CertificateFile: Declaration Format D.pdf26 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Sept 2022.pdf6 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 2023_compressed.pdf5 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 2023_compressed.pdf5 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Decem 2023_compressed.pdf5 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 march 2024_compressed.pdf5 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 2023_compressed.pdf5 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 2023_compressed.pdf5 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 2023_compressed.pdf5 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 march 2024_compressed.pdf5 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Sept 2023.pdf5 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold June 2023_compressed.pdf5 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Sept 2023_compressed.pdf5 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Dec 2023_compressed.pdf5 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold March 2024_compressed.pdf5 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2023_compressed.pdf5 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept 2023_compressed.pdf5 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 2023_compressed.pdf5 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 2024_compressed.pdf5 Jun 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: DAATA PART OC A WING.pdf27 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2022.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 2022.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 2022.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 December 2022.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2023.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2022.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 2022.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 2022.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 December 2022.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2023.pdf17 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold June 2022.pdf17 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Sept 2022.pdf17 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold December 2022.pdf17 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold March 2023.pdf17 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf17 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2022.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sept 2022.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 December 2022.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 2023.pdf16 Apr 2024
Disclosure of sold/ booked inventoryFile: Q1 2022-23 Sold Unsold Inventory.pdf15 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form 1 Certificates of Architect.pdf3 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2 - ENGINEER CERTIFICATE.pdf3 May 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory_compressed.pdf3 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form.pdf3 May 2022
Proforma of Allotment letterFile: Draft AFS_Eklavya.pdf12 Oct 2021
Layout approvalFile: CC Approval plan ( Area Statment ) 1-2 of Daata Eklavya.pdf9 Oct 2021
Building plan approvalFile: CC Approved plan 2-2 of Daata Eklavya.pdf9 Oct 2021
PAN CardFile: DBDPL PAN.pdf9 Oct 2021
Copy of the legal title reportFile: Title Certificate.pdf9 Oct 2021
Details of encumbrancesFile: No Encumbrance Declaration.pdf9 Oct 2021

How this compares with Raigarh

70%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Daata Eklavya Building A & B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Chinchavali Shekin5,900+ in Raigarh

2 kmDaata Eklavya Building ACompleted 27Lapsed / revoked 6Other 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 66 registered projects within 2 km.

Builder: Daata Builders and Developers Private Limited

Daata Builders and Developers Private Limited has 1 registration on MahaRERA, including Daata Eklavya Building A & B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Daata Eklavya Building A & B is delayed beyond 30 Aug 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Daata Eklavya Building A & B?

The registered promoter entity is Daata Builders and Developers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Daata Eklavya Building A & B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Daata Eklavya Building A & B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Daata Eklavya Building A & B?

The professionals named in the filing: Architect: Khemant Bhogilal Tailor; Engineer: Khemant Bhogilal Tailor; Chartered Accountant: Snehal Wani; Chartered Accountant: BABULAL HIRJI PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Daata Eklavya Building A & B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Daata Eklavya Building A & B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Daata Eklavya Building A & B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.