Home / Browse projects / Mumbai Suburban, Maharashtra / D J Nest

Registered No litigation declared Residential / Group Housing project

D J Nest

By DHIRAJ narayandas JADHWANI

RG-MH-85619 · RERA P51800049265 · Last updated on MahaRERA portal: 29 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 15 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 15 months from the original
6 of 11Construction stages donefurthest along: External plumbing and external plaster, 80%
14 of 22Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

D J Nest is a Residential / Group Housing project by DHIRAJ narayandas JADHWANI in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049265 on 3 Feb 2023. Possession is promised by 31 Mar 2027. The completion date has moved by 15 months from the original filing. 8 of the 22 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameD J Nest
  • TypeResidential / Group Housing
  • Location
    • Collectors Colony
    • Wadhavali
    • Chembur
    • Wadhavali
    • Kurla
    • Mumbai Suburban
    • 400074
  • Pincode400074
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800049265
  • ReraGenie IDRG-MH-85619

Builder

  • NameDHIRAJ narayandas JADHWANI
  • Entity typeIndividual
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2023First promiseDec 2025Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Feb 2023
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed78 files

Current status

36%8 of 22 units booked
48.5%Work done, per cost certificate

Figures as on 29 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D J NestNA10822022

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 80%.

D J Nest: 76% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 29 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed19

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots19
Closed/Covered19

Land and ownership10

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area422 sq m
Land owned byThe promoter, with other names on the file
Named landowners10
LandownerVillageDistrict
Bishan Infrastructure Private LimitedChemburMumbai Suburban
Sneha Ramesh Kundnani nee Sneha Chhataram KhitaniChemburMumbai Suburban
Deepa Jethanand KhitaniChemburMumbai Suburban
Vishal Jethanand KhitaniChemburMumbai Suburban
Kiran Jethanand KhitaniChemburMumbai Suburban
Shyama K Jagwani nee Vidya Chhataram KhitaniKalyanThane
Veena Chhataram KhitaniChemburMumbai Suburban
Nanak Chhataram KhitaniChemburMumbai Suburban
Suresh Chhataram KhitaniChemburMumbai Suburban
Mukesh Chhataram KhitaniChemburMumbai Suburban

Approvals and building plan

Sanctioning authorityMunicipal Corporation of Greater Mumbai
Permissible FSI1139.62
Proposed, not sanctioned1,140 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No- 16 Ground Floor 5th Floor Unit 21 22 23 40 41 Kanakia Zillion Junction of CTS Road LBS Mar
Estimated costRs 2.90 cr
Cost incurredRs 1.41 cr
Work done48.47%
BuildingWingEstimatedIncurred
D J NestNARs 2.75 crRs 1.38 cr
-NARs 14.50 lakhRs 2.17 lakh

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNambarch Architects and Engineers
ArchitectAkriti Engineers and Consultants
EngineerBahubali T Dhamane
EngineerSK Consultants & Engineers
EngineerS K Consultants & Engineers
Chartered AccountantS T P and Associates
Chartered AccountantGaurav S Rajpal & Co
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantN B Sayed & Associates
PartnerRole in project
DHIRAJ narayandas JADHWANI-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA02022619683Dec 2025 → Mar 2027

Reason as filed by the promoterThe progress of construction was affected due to site-related setbacks, including labour and material shortage. As a result, the pace of construction was slower than originally planned, and the project could not be completed within the scheduled timeline, despite our continued efforts. Given the circumstances, we kindly request an extension until 31-03-2027.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - DJ Nest as on June 2026.pdf29 Jul 2026
Withdrawal Update Form 2File: Form 2 - DJ Nest as on June 2026.pdf29 Jul 2026
Withdrawal Update Form 3File: Form 3 - DJ Nest as on June 2026.pdf29 Jul 2026
Withdrawal Update Form 1File: Form 1 - DJ Nest as on June 2026.pdf18 Jul 2026
Withdrawal Update Form 2File: Form 2 - DJ Nest as on June 2026.pdf18 Jul 2026
Withdrawal Update Form 3File: Form 3 - DJ Nest as on June 2026.pdf18 Jul 2026
Withdrawal Update Form 1File: Form 1 - D J Nest as on March 2026.pdf20 Jun 2026
Withdrawal Update Form 2File: Form 2 - D J Nest as on March 2026.pdf20 Jun 2026
Withdrawal Update Form 3File: Form 3 - D J Nest as on March 2026.pdf20 Jun 2026
Withdrawal Update Form 1File: Form 1 - DJ Nest as on Dec 2025.pdf2 Feb 2026
Withdrawal Update Form 1File: Form 1 - DJ Nest as on Dec 2025.pdf2 Feb 2026
Withdrawal Update Form 1File: Form 1 - DJ Nest as on Dec 2025.pdf2 Feb 2026
Withdrawal Update Form 1File: Form 1 - DJ Nest as on Dec 2025.pdf2 Feb 2026
Withdrawal Update Form 2File: Form 2 - DJ Nest as on June 2025.pdf2 Feb 2026
Withdrawal Update Form 2File: Form 2 - DJ Nest as on June 2025.pdf2 Feb 2026
Withdrawal Update Form 2File: Form 2 - DJ Nest as on Sept 2025.pdf2 Feb 2026
Withdrawal Update Form 2File: Form 2 - DJ Nest as on Dec 2025.pdf2 Feb 2026
Withdrawal Update Form 3File: Form 2 - DJ Nest as on June 2025.pdf2 Feb 2026
Withdrawal Update Form 3File: Form 3 - DJ Nest as on 30-06-2025.pdf2 Feb 2026
Withdrawal Update Form 3File: Form 3 - DJ Nest as on 30-09-2025.pdf2 Feb 2026
Withdrawal Update Form 3File: Form 3 - DJ Nest as on 31-12-2025 Revised.pdf2 Feb 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DJ Nest - Form 1 March 2025.pdf14 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Engineer’s Certificate on Cost Incurred on Project (Form 2) (2).pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - DJ Nest as on March 2024.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - DJ Nest as on 31-03-2024.pdf24 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC - D J Nest.pdf8 Mar 2024
Proforma of Agreement for saleFile: DJ Nest Proforma of Agreement for sale (1).pdf9 Feb 2024
Details of encumbrances concerned to FinanceFile: Adobe Scan 24-Jan-2024.pdf24 Jan 2024
Details of encumbrances concerned to FinanceFile: Adobe Scan 24-Jan-2024 (1).pdf24 Jan 2024
Details of encumbrances concerned to LegalFile: Adobe Scan 24-Jan-2024.pdf24 Jan 2024
Details of encumbrances concerned to LegalFile: Adobe Scan 24-Jan-2024 (1).pdf24 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - DJ Nest as on Sep 2023.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - DJ Nest as on Dec 2023.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - DJ Nest as on 30-09-2023.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - DJ Nest as on 31-12-2023.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - D J Nest as on March 2023.pdf13 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - D J Nest as on June 2023.pdf13 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - D J Nest as on Sept 2023.pdf13 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - D J Nest as on March 2023.pdf13 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - D J Nest as on June 2023.pdf13 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - D J Nest as on March 2023.pdf13 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - D J Nest as on June 2023.pdf13 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - DJ Nest as on 30-09-2023.pdf25 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - DJ Nest as on Sep 2023.pdf17 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - DJ Nest as on 30-09-2023.pdf17 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on March 2023.pdf8 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on June 2023.pdf8 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on September 2023.pdf8 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - DJ Nest as on March 2023.pdf16 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - DJ Nest as on June 2023.pdf16 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - DJ Nest as on 31-03-2023.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - DJ Nest as on 30-06-2023.pdf6 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- DJ Nest as on 31st March 2023.pdf30 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- DJ Nest (UPDATED).pdf23 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 CA Certificate on Project Cost Fund withdrawal (Form 3) (3).pdf23 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Approved CC 24_01_2022.pdf24 Jan 2023
Declaration about Commencement CertificateFile: decration of commencement certificate.pdf24 Jan 2023
Proforma of Allotment letterFile: AL 040123.pdf5 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report ( Agreement For Sale )4012023.pdf5 Jan 2023
Copy of the legal title reportFile: RERA Title certificate.pdf4 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Certificate 491_compressed.pdf4 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf4 Jan 2023
Proforma of Agreement for saleFile: AFS DJ HOMES DJ Nest.pdf4 Jan 2023
Layout approvalFile: DJ Nest Drawings (1).pdf31 Dec 2022
Building plan approvalFile: DJ Nest Drawings (1).pdf31 Dec 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Letter Finance.pdf31 Dec 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Letter legal.pdf31 Dec 2022
Details of encumbrances concerned to LegalFile: Encumbrance Letter Finance.pdf31 Dec 2022
Details of encumbrances concerned to LegalFile: Encumbrance Letter legal.pdf31 Dec 2022
Copy of Layout Approval (in case of layout)File: DJ Nest Drawings (1).pdf31 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: DJ Nest Drawings (1).pdf31 Dec 2022
Declaration in FORM BFile: Developer Form B.pdf31 Dec 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Form A.pdf31 Dec 2022
Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter.pdf31 Dec 2022
CERSAI detailsFile: CERSAI_Search_Report_200256123496_For_Asset_Based_Search_29_12_2022_12_08_55_635.pdf29 Dec 2022
PAN CardFile: Pancard- Dhiraj Jadhwani.pdf28 Dec 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
JB SHINEplot no 21a collector colony15CompletedNov 2016Late, Nov 2019

How this compares with Mumbai Suburban

36%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 15 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep D J Nest on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wadhavali, Chembur6,700+ in Mumbai Suburban

2 kmD J NestCompleted 76Lapsed / revoked 51Other 78Dot size: filed unitsN

Filed coordinates, straight-line distance. 205 registered projects within 2 km.

Builder: DHIRAJ narayandas JADHWANI

DHIRAJ narayandas JADHWANI has 2 registrations on MahaRERA, including DJ AMORE and D J Nest. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if D J Nest is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of D J Nest?

The registered promoter entity is DHIRAJ narayandas JADHWANI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in D J Nest?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for D J Nest?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at D J Nest?

The professionals named in the filing: Architect: Nambarch Architects and Engineers; Architect: Akriti Engineers and Consultants; Engineer: Bahubali T Dhamane; Engineer: SK Consultants & Engineers; Engineer: S K Consultants & Engineers; Chartered Accountant: S T P and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in D J Nest?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About D J Nest. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save D J Nest to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.