Home / Browse projects / Mysore, Karnataka / COURTYARD

Registration approved Residential/Group Housing project

COURTYARD

By OXYGEN BUILD VENTURES PVT LTD.,

RG-KA-79387 · RERA PRM/KA/RERA/1268/378/PR/171118/001830

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 12 months
  • 2 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Jul 2020Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 50 documents Report an error

COURTYARD is a Residential/Group Housing project by OXYGEN BUILD VENTURES PVT LTD., in Mysore, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1268/378/PR/171118/001830 on 18 Nov 2017. Possession is promised by 15 Jul 2020. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameCOURTYARD
  • TypeResidential/Group Housing
  • Location
    • MYSORE
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1268/378/PR/171118/001830
  • ReraGenie IDRG-KA-79387

Builder

  • NameOXYGEN BUILD VENTURES PVT LTD.,
  • Entity typeCompany
  • CINU45205KA2011PTC059553
  • Authorized SignatoryThumilan C
  • Other registrations1 more →

Key dates

this monthRegisteredNov 2017First promiseJul 2019Revised toJul 2020

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on18 Nov 2017
  • Promised completion15 Jul 2020
  • Revised completionRevised to 15 Jul 2020 (originally 15 Jul 2019)
  • Buildings1 building record
  • Documents filed50 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Courtyard---23023

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes-
Water conservationYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,416 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 3.48 cr

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJul 2019 → Apr 2021

No reason recorded in the filing

EX/PRM/KA/RERA/1268/378/PR/200226/001830Apr 2021 → Jul 2020

Reason as filed by the promoterothers

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed50

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1268/378/PR/171118/001830 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Oxygen Certification of Incorporation.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Arc certificate - work completed.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engg certificate - work completed.pdf-
CA Certificate for Funds UtilizationFile: CA certificate - fund utilized.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Arc certificate - work pending.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engg certificate - work pending.pdf-
CA Certificate for Funds required for Project CompletionFile: CA certificate - funds required.pdf-
AffidavitFile: Affidavit.pdf-
Latest Encumbrance CertificateFile: Encumbrance Certificate.pdf-
Consent letter from 2/3rd of AllotteesFile: Consent Letter.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: Affidavit Under Sec 18.pdf-
Document 2File: CC.pdf-
Document 3File: Bank Statement.pdf-
Commencement Certificate-
Approved Building Plan-
Approved Layout Plan-
Proforma For Sale Deed-
Proforma of Sale Agreement-
Sale Deed-
Approved Section Of Building-
Area Development Plan Of Project Area-
Allotment Letter-
Broucher-
Noc-
Project Specifications-
Encumbrance Certificate-
Khatha-
JDA-
Balance Sheet 2015 - 2016File: Balance Sheet.jpg-
Balance Sheet 2014 - 2015File: Balance Sheet.jpg-
Balance Sheet 2013 - 2014File: Balance Sheet.jpg-
Audited Profit and Loss Statement 2015 - 2016File: Audited Profit and Loss Statement.jpg-
Audited Profit and Loss Statement 2014 - 2015File: Audited Profit and Loss Account.jpg-
Audited Profit and Loss Statement 2013 - 2014File: Audited Profit and Loss Statement.jpg-
Director's Report 2015 - 2016File: Director Report.pdf-
Director's Report 2014 - 2015File: Director Report.pdf-
Director's Report 2013 - 2014File: Director Report.pdf-
Cash Flow Statement 2015 - 2016File: Cash Flow Statement.pdf-
Cash Flow Statement 2014 - 2015File: Cash Flow Statement.pdf-
Auditor's Report 2015 - 2016File: Auditor Report.pdf-
Auditor's Report 2014 - 2015File: Auditor Report.pdf-
Auditor's Report 2013 - 2014File: Auditor report.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR.jpg-
Income Tax Return Acknowledgement 2014 - 2015File: ITR.jpg-
Income Tax Return Acknowledgement 2013 - 2014File: ITR.jpg-
Form B Affidavit-
Prospectus/BrochureFile: Final Brochure.pdf-
Advertisement Copy 1File: Advertisement.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1268_378_PR_171118_001830.xlsx-

How this compares with Mysore

28%of Mysore projects moved their completion datethis one moved by 12 months
0%of Mysore registrations are shown as withdrawn or revokedthis one is not

Computed across the 700+ Mysore projects on ReraGenie, from their own filings.

Keep COURTYARD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Mysore700+ in Mysore

Builder: OXYGEN BUILD VENTURES PVT LTD.,

OXYGEN BUILD VENTURES PVT LTD., has 2 registrations on RERA Karnataka, including Hasiru and COURTYARD. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Mysore district page.

Frequently asked questions

What are my rights if COURTYARD is delayed beyond 15 Jul 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of COURTYARD?

The registered promoter entity is OXYGEN BUILD VENTURES PVT LTD.,, a company as per the filing. Its CIN U45205KA2011PTC059553 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in COURTYARD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in COURTYARD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About COURTYARD. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save COURTYARD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.