ReraGenieLog inGet a buyer report

Home / Browse projects / Sindhudurg, Maharashtra / COSMOS BUILDING C

Completed No litigation declared Others project

COSMOS BUILDING C

By BENJAMIN MANWEL DSOUZA

RG-MH-81920 · RERA P52900014898 · Last updated on MahaRERA portal: 28 Feb 2019

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Feb 2019Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 18 documents Report an error

COSMOS BUILDING C is a Others project by BENJAMIN MANWEL DSOUZA in Sindhudurg, Maharashtra, registered with MahaRERA as P52900014898 on 11 Jan 2018. The registration is recorded completed; possession was promised by 28 Feb 2019.

At a glance

Project

  • NameCOSMOS BUILDING C
  • TypeOthers
  • Location
    • NA
    • VENGURLA
    • Vengurla (M Cl)
    • Sindhudurg
    • 416516
  • Pincode416516
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900014898
  • ReraGenie IDRG-MH-81920

Builder

  • NameBENJAMIN MANWEL DSOUZA
  • Entity typeIndividual
  • GSTIN27AARPD4180D1ZS
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations3 more →
  • Completed3 of 4
  • Declared earlier projects3 →

Key dates

this monthRegisteredJan 2018PromisedFeb 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Jan 2018
  • Promised completion28 Feb 2019
  • Revised completionNone
  • Buildings1 building record
  • Documents filed18 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
COSMOS BUILDING CNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Feb 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

COSMOS BUILDING C: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 28 Feb 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area717 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1183.03
Proposed, not sanctioned1,183 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMANIK CHOWK, VENGURLA, SINDHUDURG

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectNAVIN LAD
EngineerPRASAD PRABHAKAR KULKARNI
PartnerRole in project
BENJAMIN MANWEL DSOUZA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Jan 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Jan 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Jan 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Jan 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed18

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng_Certificate_Cosmos.pdf28 Feb 2019
Certificates of CA (Form 5)File: Form_5_CA_Certificate.pdf28 Feb 2019
Certificates of Architect (Form 4)File: Arch Certificate.pdf28 Feb 2019
OtherFile: Occupancy_Certificate_Cosmos.pdf22 Feb 2019
Building plan approvalFile: Building_IOD.pdf2 Jan 2018
Layout approvalFile: Copy of Layout.pdf2 Jan 2018
PAN CardFile: PanCard.pdf2 Jan 2018
Copy of the legal title reportFile: LegalTitle.pdf2 Jan 2018
Details of encumbrancesFile: Encumbrances_Cosmos.pdf2 Jan 2018
Copy of Layout Approval (in case of layout)File: Copy of Layout.pdf2 Jan 2018
Building Plan Approval (IOD)File: Building_IOD.pdf2 Jan 2018
Commencement Certificates / NA Order for plotted developmentFile: Building_IOD.pdf2 Jan 2018
Declaration in FORM BFile: Cosmos Affedevit.pdf2 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ArchitechCertificate_New.pdf2 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: COSMOS Engineering Certificate.pdf2 Jan 2018
Certificates of CA (Form 3)File: CA_Certificate_N.pdf2 Jan 2018
Proforma of Allotment letterFile: Application_Allotment_Agreement.pdf2 Jan 2018
OtherFile: Undertaking_For_SoldApartments.pdf2 Jan 2018

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
MEENA PARK PLOT 2-4P52900014880RAWOOLWADA, Sindhudurg-Jan 2018CompletedDec 2023Registered original: Sep 2022Late, Dec 2024
COSMOS BUILDING CPLOT BEARING CTS NO 314 Vengurla Konkan Sindhudurg 41651627-CompletedFeb 2019Feb 2019
MEENA PARK - CARNATION BUILDINGS NO 314 HISSA NO 1 OF 1 AND 2A OF 220-CompletedApr 2017Mar 2017

How this compares with Sindhudurg

21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is completed

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep COSMOS BUILDING C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VENGURLA530+ in Sindhudurg

2 kmCOSMOS BUILDING CCompleted 5Lapsed / revoked 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: BENJAMIN MANWEL DSOUZA

BENJAMIN MANWEL DSOUZA has 4 registrations on MahaRERA, including MEENA PARK PLOT 2-4 and MEENA PARK - 5. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if COSMOS BUILDING C is delayed beyond 28 Feb 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of COSMOS BUILDING C?

The registered promoter entity is BENJAMIN MANWEL DSOUZA, an individual as per the filing. Its GSTIN 27AARPD4180D1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in COSMOS BUILDING C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for COSMOS BUILDING C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at COSMOS BUILDING C?

The professionals named in the filing: Architect: NAVIN LAD; Engineer: PRASAD PRABHAKAR KULKARNI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in COSMOS BUILDING C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About COSMOS BUILDING C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save COSMOS BUILDING C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.