ReraGenieLog inGet a buyer report

Home / Browse projects / Kolhapur, Maharashtra / CORAL ENCLAVE

Registered No litigation declared Residential / Group Housing project

CORAL ENCLAVE

By M/S SD Associates

RG-MH-82347 · RERA P53000051842 · Last updated on MahaRERA portal: 23 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 completed earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 95%
6 of 40Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

CORAL ENCLAVE is a Residential / Group Housing project by M/S SD Associates in Kolhapur, Maharashtra, registered with MahaRERA as P53000051842 on 7 Jul 2023. Possession is promised by 31 Dec 2027. 34 of the 40 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameCORAL ENCLAVE
  • TypeResidential / Group Housing
  • Location
    • A ward
    • Sane Guruji Vasahat
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416011
  • Pincode416011
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000051842
  • ReraGenie IDRG-MH-82347

Builder

  • NameM/S SD Associates
  • Entity typePartnership
  • PartnerMahesh Khanderao Dhavale
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredJul 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Jul 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed80 files

Current status

85%34 of 40 units booked
100.0%Work done, per cost certificate

Figures as on 23 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CORAL ENCLAVENA6640040

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

CORAL ENCLAVE: 69% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%

Progress on shared amenities15

As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership5

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area926 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
LandownerVillageDistrict
Sangita Sujay NarakeKolhapur (M Corp.)Kolhapur
Sumeru Sujay NarakeKolhapur (M Corp.)Kolhapur
Sumedh Sujay NarakeKolhapur (M Corp.)Kolhapur
Ajay Jaysingrao NarakeKolhapur (M Corp.)Kolhapur
Jayprabha Suhas ShindeKolhapur (M Corp.)Kolhapur

Approvals and building plan

Sanctioning authorityKolhapur Municipal Corporation
Permissible FSI3299.0
Proposed, not sanctioned3,299 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKhari Corner Kolhapur
Estimated costRs 4.73 cr
Cost incurredRs 4.73 cr
Work done99.96%
BuildingWingEstimatedIncurred
CORAL ENCLAVENARs 4.68 crRs 4.68 cr
-NARs 5.50 lakhRs 5.50 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSanjay A Adake
EngineerAmit Narayan Nayakoji Narayan Nayakoji
Chartered AccountantNitish S Vandure Patil S Vandure Patil
Chartered AccountantAjay Manglani And Associates
PartnerRole in project
M/S SD Associates-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf23 Jun 2026
Withdrawal Update Form 2File: FORM 2.pdf23 Jun 2026
Withdrawal Update Form 3File: FORM3.pdf23 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf27 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf27 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf27 Feb 2026
Form 5 (FY 2024-2025)File: FORM 5 (10).pdf27 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf22 Jan 2026
Withdrawal Update Form 1File: Form 1.pdf22 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf22 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf22 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf22 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf22 Jan 2026
Withdrawal Update Form 1File: FORM 1 SD CORAL UPLOAD.pdf20 Jul 2025
Withdrawal Update Form 2File: FORM 2 SD CORAL UPLOAD.pdf20 Jul 2025
Withdrawal Update Form 3File: FORM 3 SD CORAL UPLOAD.pdf20 Jul 2025
Form 1File: Form 1.pdf28 May 2025
Form 2File: FORM 2 MAR2025 UPLOAD.pdf28 May 2025
Form 3File: FORM 3 MAR2025 UPLOAD.pdf28 May 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MAR2025 UPLOAD.pdf28 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CORAL DEC 24 UPLOAD.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 CORAL DEC 24 UPLOAD.pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD CORAL DEC 24 UPLOAD.pdf16 Apr 2025
Building plan approvalFile: Revised Plan.pdf26 Oct 2024
Building plan approvalFile: REV SANCTION PLAN_compressed.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sep.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June.pdf26 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 sep.pdf26 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement certificate.pdf26 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan.pdf26 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: REV SANCTION PLAN_compressed.pdf26 Oct 2024
Declaration about Commencement CertificateFile: Format D.pdf26 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 june.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sep.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 june.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 sep.pdf25 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold unsold June.pdf25 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold unsold sep.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec.pdf1 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March.pdf1 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec.pdf1 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March.pdf1 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf1 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Dec.pdf1 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold March.pdf1 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec.pdf1 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March.pdf1 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Declaration June.pdf30 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From-1 Sept 23.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From-2 Sept 23.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold-Inventory Sept 23.pdf19 Oct 2023
Layout approvalFile: LAYOUT PLAN.pdf9 Jun 2023
Building plan approvalFile: Sanctioned Plan 2.pdf9 Jun 2023
Building plan approvalFile: Sanctioned Plan 1.pdf9 Jun 2023
Copy of the legal title reportFile: Legal Title Report Final.pdf9 Jun 2023
Copy of the legal title reportFile: Search Report.pdf9 Jun 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Concerned to Legal.pdf9 Jun 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Concerned to Finance.pdf9 Jun 2023
Details of encumbrances concerned to LegalFile: Encumbrance Concerned to Legal.pdf9 Jun 2023
Details of encumbrances concerned to LegalFile: Encumbrance Concerned to Finance.pdf9 Jun 2023
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf9 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan 2.pdf9 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned Plan 1.pdf9 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf9 Jun 2023
Declaration about Commencement CertificateFile: Declaration about CC.pdf9 Jun 2023
Declaration in FORM BFile: Form B Declaration - Promoter.pdf9 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf9 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf9 Jun 2023
CERSAI detailsFile: CERSAI Declaration along with Report.pdf9 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf9 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other REO - Dhavale.pdf9 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other REO - Sohani.pdf9 Jun 2023
Proforma of Allotment letterFile: Allottment Letter - New.pdf9 Jun 2023
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale.pdf9 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Declaration.pdf9 Jun 2023
Deviation Report with respect to Allotment letterFile: No Deviation - Allottment Letter.pdf9 Jun 2023
Deviation Report with respect to model copy of AgreementFile: No Deviation - Agreement to Sell.pdf9 Jun 2023
PAN CardFile: PAN Card.pdf7 Jun 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
JUPITER PRIDEP53000050178Near Gandhi Maidan, Kolhapur13Mar 2023OngoingDec 2027Not due yet
RUBY HEIGHTSP53000046543Apatenagar, Kolhapur-Aug 2022CompletedDec 2025Sep 2024

How this compares with Kolhapur

85%of this project is bookeddistrict median 19%
17%of Kolhapur projects moved their completion datethis one has not
25%of Kolhapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep CORAL ENCLAVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sane Guruji Vasahat880+ in Kolhapur

2 kmCORAL ENCLAVECompleted 20Lapsed / revoked 7Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 63 registered projects within 2 km.

Builder: M/S SD Associates

M/S SD Associates has 5 registrations on MahaRERA, including Datar Radiant Plaza and PEARL RESIDENCY. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if CORAL ENCLAVE is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CORAL ENCLAVE?

The registered promoter entity is M/S SD Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CORAL ENCLAVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CORAL ENCLAVE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CORAL ENCLAVE?

The professionals named in the filing: Architect: Sanjay A Adake; Engineer: Amit Narayan Nayakoji Narayan Nayakoji; Chartered Accountant: Nitish S Vandure Patil S Vandure Patil; Chartered Accountant: Ajay Manglani And Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CORAL ENCLAVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CORAL ENCLAVE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CORAL ENCLAVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.