Home / Browse projects / Mumbai Suburban, Maharashtra / CONWOOD PARAGON
CONWOOD PARAGON
By CONSOLIDATED CROP PROTECTION PRIVATE LIMITED
RG-MH-62036 · RERA P51800011758 · Last updated on MahaRERA portal: 4 Dec 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 14 complaints at MahaRERA
- Completion date moved by 72 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CONWOOD PARAGON is a Mixed project by CONSOLIDATED CROP PROTECTION PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800011758 on 31 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 72 months from the original filing. 157 of the 249 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 14 complaints are on record with the regulator.
At a glance
Project
- NameCONWOOD PARAGON
- TypeMixed
- Location
- D P ROAD
- Borivali
- Mumbai Suburban
- 400063
- Pincode400063
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800011758
- ReraGenie IDRG-MH-62036
Builder
- NameCONSOLIDATED CROP PROTECTION PRIVATE LIMITED
- Entity typeCompany
- Managing DirectorPRIYA FARID AMIRI
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on31 Aug 2017
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2021)
- Buildings1 building record
- Documents filed35 files
Current status
Figures as on 4 Dec 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| CONWOOD PARAGON | NA | 23 | 17 | 0 | 249 | 249 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 4 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.
CONWOOD PARAGON: 64% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 80% |
| Slabs of Super Structure | 90% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 5% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 5% |
Progress on shared amenities15
As on 4 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 5% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 15% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 20% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 50% |
Parking filed38
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MOHMD OBAID PETTIWALA |
| Architect | Hardik Dinesh Hingoo |
| Engineer | HITEN MAHIMTURA |
| Engineer | Omkesh Umesh Chaurasia |
| Chartered Accountant | SMITH Girish Shetty |
| Chartered Accountant | RAV AND CO |
| Partner | Role in project |
|---|---|
| CONSOLIDATED CROP PROTECTION PRIVATE LIMITED | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIn lieu of it being a leasehold land we are required to take an Estate Department NOC each time,also this project is a transitional project i.e.proposed in PRE RERA period and executed in RERA phase and in addition to this Covid -19 is also one of the reason for delay.
Reason as filed by the promoterIn Lieu of it being leasehold land, we are required to take an Estate Department NOC each time for every approval causing unexpected delays. This is a transitional project i.e proposed in Pre RERA and being executed in the RERA phase, basic parameters of area, approval guidelines changed ultimately impacting our planning hence causing further delays.
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 128/SA/2016/2016 | Metropolitan Magistrate Court | HEARING |
Complaints filed with MahaRERA14
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000197154 | Aniket Bhalchandra Patil | M/s. Consolidated Crop Protection Pvt. Ltd. | 04/06/2021 |
| CC006000000197156 | Nimish Bhalchandra Patil | M/s. Consolidated Crop Protection Pvt. Ltd. | 07/06/2021 |
| CC006000000354360 | M/s Aparnaa Fiscal Services Pvt. Ltd. Through its Director | M/s Consolidated Crop Protection Private Limited and Anr | 16/03/2023 |
| CC006000000354367 | M/s Aparnaa Fiscal Services Pvt. Ltd. Through its Director | M/s Consolidated Crop Protection Private Limited and Anr | 16/02/2023 |
| CC006000000354368 | M/s Aparnaa Fiscal Services Pvt. Ltd. Through its Director | M/s Consolidated Crop Protection Private Limited and Anr | 16/03/2023 |
| CC006000000354374 | M/s Aparnaa Fiscal Services Pvt. Ltd. Through its Director | M/s Consolidated Crop Protection Private Limited | 16/03/2023 |
| CC006000000354382 | M/s Aparnaa Fiscal Services Pvt. Ltd. Through its Director | M/s Consolidated Crop Protection Private Limited and Anr | 16/03/2023 |
| CC006000000354384 | M/s Ulike Developers Pvt. Ltd. Through its manager | M/s Consolidated Crop Protection Private Limited and Anr | 16/03/2023 |
| CC006000000354385 | M/s Ulike Developers Pvt. Ltd. Through its manager | M/s Consolidated Crop Protection Private Limited | 16/03/2023 |
| CC006000000354388 | M/s Ulike Developers Pvt. Ltd. Through its manager | M/s Consolidated Crop Protection Private Limited and Anr | 16/03/2023 |
| CC006000000354391 | M/s Ulike Developers Pvt. Ltd. Through its manager | M/s Consolidated Crop Protection Private Limited and Anr | 16/03/2023 |
| CC006000000354400 | M/s Ulike Developers Pvt. Ltd. Through its manager | M/s Consolidated Crop Protection Private Limited and Anr | 16/03/2023 |
| CC006000000397207 | M/S PRASHANT PACKAGING PRIVATE LIMITED M/S PRASHANT PACKAGING PVT LTD | M/S CONSOLIDATED CROP PROTECTION PRIVATE LIMITED | 04/09/2023 |
| CC12600539 | Lalita Gopi Didwania | CONSOLIDATED CROP PROTECTION PRIVATE LIMITED | 31/01/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Jul 2017 - Commencement CertificateNot on the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
- Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed35
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: FORM 2A 24-25.pdf | 4 Dec 2025 |
| Form 1File: Architect's Certificate PARAGON 1125 to 3132025.pdf | 22 Aug 2025 |
| Form 2File: FORM 2 1-1-2025 31-3-2025.pdf | 22 Aug 2025 |
| Form 3File: FORM 3 1-1-2025 TO 31-3-2025.pdf | 22 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE SOLD BOOKED PARAGON 18-08-2025_compressed.pdf | 22 Aug 2025 |
| Form 1File: Architect's Certificate PARAGON 0104-2025 to 30062025.pdf | 22 Aug 2025 |
| Form 2File: FORM 2 1-4-2025 TO 30-6-2025.pdf | 22 Aug 2025 |
| Form 3File: FORM 3 1-4-2025 TO 30-6-2025.pdf | 22 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE SOLD BOOKED PARAGON 18-08-2025_compressed.pdf | 22 Aug 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD-BOOKED UNSOLD INVENTORY.pdf | 21 Apr 2023 |
| Certificates of CA (Form 3)File: PARAGON FORM 3.pdf | 21 Apr 2023 |
| Declaration about Commencement CertificateFile: DECLARATION CC.pdf | 6 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5-21-22.pdf | 6 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ENGINEER'S CERTIFICATE 2019-2020.pdf | 5 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: ENGINEER'S CERTIFICATE 2020-2021.pdf | 5 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: ENGINEER'S CERTIFICATE 2021-2022.pdf | 5 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: RERA COMPLAINS.pdf | 5 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5 - 17-18.pdf | 5 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 - 18- 19.pdf | 5 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 - 19-20.pdf | 5 Apr 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200227932599_For_Asset_Based_Search_12_01_2022_13_06_26_605.pdf | 23 Feb 2022 |
| Disclosure of sold/ booked inventoryFile: Sold inventory-Conwood Paragon.pdf | 12 Jan 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 2020-21 - Paragon.pdf | 23 Dec 2021 |
| Layout approvalFile: Layout Paragon.pdf | 29 Jul 2017 |
| Building plan approvalFile: IOD Paragon.pdf | 29 Jul 2017 |
| PAN CardFile: PAN Card.pdf | 29 Jul 2017 |
| Copy of the legal title reportFile: Title Paragon.pdf | 29 Jul 2017 |
| Details of encumbrancesFile: Sanction Letter Paragon.pdf | 29 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Layout Paragon.pdf | 29 Jul 2017 |
| Building Plan Approval (IOD)File: IOD Paragon.pdf | 29 Jul 2017 |
| Declaration in FORM BFile: Form B Paragon.pdf | 29 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certi Paragon.pdf | 29 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert Paragon.pdf | 29 Jul 2017 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 29 Jul 2017 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 29 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 35 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep CONWOOD PARAGON on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Borivali6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 348 registered projects within 2 km.
Elysian Tower C, D, E
Oberoi Realty Limited
Elysian Tower B
Oberoi Realty Limited
Elysian Tower A
Oberoi Realty Limited
Sheetal Sangam
DGS Township Pvt Ltd
SEJAL SQUARE
ALCHEMI DEVELOPERS PRIVATE LIMITED
Mehta Marquina 1978
Shreeram Builders
See every Mumbai Suburban project, with the district possession charts
Builder: CONSOLIDATED CROP PROTECTION PRIVATE LIMITED
CONSOLIDATED CROP PROTECTION PRIVATE LIMITED has 1 registration on MahaRERA, including CONWOOD PARAGON. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if CONWOOD PARAGON is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CONWOOD PARAGON?
The registered promoter entity is CONSOLIDATED CROP PROTECTION PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CONWOOD PARAGON?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against CONWOOD PARAGON?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for CONWOOD PARAGON?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CONWOOD PARAGON?
The professionals named in the filing: Architect: MOHMD OBAID PETTIWALA; Architect: Hardik Dinesh Hingoo; Engineer: HITEN MAHIMTURA; Engineer: Omkesh Umesh Chaurasia; Chartered Accountant: SMITH Girish Shetty; Chartered Accountant: RAV AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CONWOOD PARAGON?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback