Home / Browse projects / Mysore, Karnataka / construction of 14 house under PKGB Scheme

Registration approved No litigation declared Residential/Group Housing project

construction of 14 house under PKGB Scheme

By Chief Officer TMC Bannur

RG-KA-59300 · RERA PRM/KA/RERA/1268/382/PR/110625/007811 · Last updated on RERA Karnataka portal: 21 May 2025

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Aug 2024Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 83 documents Report an error

construction of 14 house under PKGB Scheme is a Residential/Group Housing project by Chief Officer TMC Bannur in Mysore, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1268/382/PR/110625/007811 on 11 Jun 2025. Possession is promised by 5 Aug 2024.

At a glance

Project

  • Nameconstruction of 14 house under PKGB Scheme
  • TypeResidential/Group Housing
  • Location
    • T.Narsipur
    • Mysore
    • 571101
  • Pincode571101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1268/382/PR/110625/007811
  • ReraGenie IDRG-KA-59300

Builder

  • NameChief Officer TMC Bannur
  • Entity typeRajiv Gandhi Housing Corporation Limited
  • Authorized SignatoryChief Officer TMC Bannur

Key dates

Registered
11 Jun 2025
Promised
5 Aug 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on11 Jun 2025
  • Promised completion5 Aug 2024
  • Revised completionNone
  • Buildings3 building records
  • Documents filed83 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1---606
2---606
3---202

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 21 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 21 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsNoNot applicable
Corridor/LobbiesNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,367 sq m
Named landowners1
LandownerVillageDistrict
AC MYSURU--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 1.03 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 1.03 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnand M
EngineerCadd Station Technologies pvt ltd
Chartered AccountantShivananda M C

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed83

As listed on the registration, under the names the promoter filed them with; the newest 80 of 83 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1268/382/PR/110625/007811 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey sketchFile: adlr certified survey sketch -Bannur.pdf21 May 2025
Approved Original Single Plot layout planFile: approved original single layout plan-Bannur.pdf21 May 2025
Approved Original Single Plot layout plan work order.File: single plot layout work order bannur.pdf21 May 2025
Building License from Local Authority Original CopyFile: building license bannur.pdf21 May 2025
Approved building plan - Original CopyFile: approved building plan bannur.pdf21 May 2025
All original sanctioned drawings, floor plan, sectional drawings and elevations.File: approved drawing and elevations bannur.pdf21 May 2025
commencement certificate.File: commencement certificate bannur.pdf21 May 2025
Village map certified by the concern officer with demarcation of proposed landFile: Village map pkgy bannur.pdf21 May 2025
RTC, survey 1648-
Mutation, survey 1648-
Encumbrance Certificate, survey 1648-
Khatha, survey 1648-
Registration CertificateFile: bannur gezet_0001.pdf-
GST CertificateFile: GST certificate bannur.pdf-
Certificate issued by CA Form 1-
Certificate issued by Architect Form 2-
Certificate issued by Engineer Form 3-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: pkgb affidevit_0001.pdf-
Certificate from Chartered Account-
Balance Sheet 2023 - 2024File: 2023-24 Balance sheet.pdf-
Balance Sheet 2022 - 2023File: 2022-23 cash flow.pdf-
Balance Sheet 2021 - 2022File: Balance Sheet 2018-19.pdf-
Audited Profit and Loss Statement 2023 - 2024File: P&L and Balance Sheet for 2019-20.pdf-
Audited Profit and Loss Statement 2022 - 2023File: P&L and Balance Sheet for 2019-20.pdf-
Audited Profit and Loss Statement 2021 - 2022File: P&L and Balance Sheet for 2019-20.pdf-
Director's Report 2023 - 2024File: Directors report.pdf-
Director's Report 2022 - 2023File: Directors report.pdf-
Director's Report 2021 - 2022File: Directors report.pdf-
Cash Flow Statement 2023 - 2024File: 2022-23 cash flow.pdf-
Cash Flow Statement 2022 - 2023File: 2022-23 cash flow.pdf-
Auditor's Report 2023 - 2024File: Directors report.pdf-
Auditor's Report 2022 - 2023File: Directors report.pdf-
Auditor's Report 2021 - 2022File: Directors report.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: Turnover Certificate-2018-19 to 2022-23.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: Turnover Certificate-2018-19 to 2022-23.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: Turnover Certificate-2018-19 to 2022-23.pdf-
Bannur LOA-
pkgb noc_0001-
pkgb water connection latter_0001-
1pdf-
2pdf-
3pdf-
4pdf-
1pdf-
spec-
Bannur LOA-
Bannur LOA-
Bannur LOA-
spec-
Bannur LOA-
spec-
Bannur LOA-
spec-
Bannur LOA-
spec-
Bannur LOA-
spec-
spec-
spec-
Bannur LOA-
spec-
pkgb noc_0001-
pkgb water connection latter_0001-
1pdf-
1pdf-
2pdf-
2pdf-
3pdf-
Bannur LOA-
spec-
Bannur LOA-
spec-
pkgb noc_0001-
Bannur LOA-
pkgb water connection latter_0001-
pkgb water connection latter_0001-
Unnamed document-

How this compares with Mysore

28%of Mysore projects moved their completion datethis one has not
0%of Mysore registrations are shown as withdrawn or revokedthis one is not

Computed across the 700+ Mysore projects on ReraGenie, from their own filings.

Keep construction of 14 house under PKGB Scheme on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Mysore700+ in Mysore

Builder: Chief Officer TMC Bannur

Chief Officer TMC Bannur has 1 registration on RERA Karnataka, including construction of 14 house under PKGB Scheme. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Mysore district page.

Frequently asked questions

What are my rights if construction of 14 house under PKGB Scheme is delayed beyond 5 Aug 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of construction of 14 house under PKGB Scheme?

The registered promoter entity is Chief Officer TMC Bannur, a rajiv gandhi housing corporation limited as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in construction of 14 house under PKGB Scheme?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at construction of 14 house under PKGB Scheme?

The professionals named in the filing: Architect: Anand M; Engineer: Cadd Station Technologies pvt ltd; Chartered Accountant: Shivananda M C. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in construction of 14 house under PKGB Scheme?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About construction of 14 house under PKGB Scheme. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save construction of 14 house under PKGB Scheme to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.