Completed No litigation declared Others project

CLUSTER RESIDENCY

By CLUSTER REALITY

RG-MH-18288 · RERA P52000076600 · Last updated on MahaRERA portal: 7 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
3 of 11Construction stages donefurthest along: Internal walls, 97%
15 of 16Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

CLUSTER RESIDENCY is a Others project by CLUSTER REALITY in Raigarh, Maharashtra, registered with MahaRERA as P52000076600 on 18 Jun 2024. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 6 months from the original filing. 1 of the 16 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameCLUSTER RESIDENCY
  • TypeOthers
  • Location
    • PUSHPAK WAHAL
    • WAHAL
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000076600
  • ReraGenie IDRG-MH-18288

Builder

  • NameCLUSTER REALITY
  • Entity typePartnership
  • PartnersSURESH VILAS KHAIRE, SIDDHARTH ARJUN ROTE, VINODKUMAR MANOHARLAL JAIN

Key dates

this monthRegisteredJun 2024First promiseDec 2025Revised toJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Jun 2024
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed57 files

Current status

6%1 of 16 units booked
100.0%Work done, per cost certificate

Figures as on 7 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CLUSTER RESIDENCYNA3312416

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 97%.

CLUSTER RESIDENCY: 77% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks92%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities15

As on 7 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Closed/Covered3

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area300 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
PARAG JEEVAN DANDEKARKombadbhujeRaigarh
VANITA JEEVAN DANDEKARKombadbhujeRaigarh
POOJA NILESH KOLIMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityCIDCO
Permissible FSI594.36
Proposed, not sanctioned594 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1ST FLOOR SUNDARAM BULDING SHIVAJI CHOWK NEAR J J WOODS PANVEL 410206
Estimated costRs 1.15 cr
Cost incurredRs 1.15 cr
Work done100.0%
BuildingWingEstimatedIncurred
CLUSTER RESIDENCYNARs 1.10 crRs 1.10 cr
-NARs 5.00 lakhRs 5.00 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKALPAK ARCHITECTS
EngineerSTRUCON CONSULTING AND ENGINEERS
Chartered AccountantMANISH K RAMAWATI AND COMPANY
PartnerRole in project
CLUSTER REALITY-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA23042620701Dec 2025 → Jun 2026

Reason as filed by the promoter1) Poor booking response from customer. 2) Because of poor response our work was very slow.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC.pdf7 Jun 2026
Occupational CertificateFile: PLAN 1 (2).pdf7 Jun 2026
Occupational CertificateFile: PLAN 2.pdf7 Jun 2026
Withdrawal Update Form 1File: FORM 1.pdf6 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf6 Jun 2026
Withdrawal Update Form 3File: Form 3 31-12-2025 CLUSTER REALTY sign.pdf6 Jun 2026
Withdrawal Update Form 1File: form 1 30-06-2025.pdf30 Mar 2026
Withdrawal Update Form 1File: FORM 1 30-09-2025.pdf30 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf30 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf30 Mar 2026
Withdrawal Update Form 2File: Form 2.pdf30 Mar 2026
Withdrawal Update Form 2File: Form 2.pdf30 Mar 2026
Withdrawal Update Form 2File: Form 2.pdf30 Mar 2026
Withdrawal Update Form 2File: Form 2.pdf30 Mar 2026
Withdrawal Update Form 3File: Form 3 30-6-2025 CLUSTER REALTY.pdf30 Mar 2026
Withdrawal Update Form 3File: Form 3 30-09-2025 CLUSSTER REALTY sign.pdf30 Mar 2026
Withdrawal Update Form 3File: Form 3 31-12-2025 CLUSTER REALTY sign (1).pdf30 Mar 2026
Withdrawal Update Form 3File: Form 3 31-12-2025 CLUSTER REALTY sign (1).pdf30 Mar 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 JUNE.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SEPT.pdf26 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SIGNED - converted.pdf26 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SIGNED - converted.pdf26 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JUNE.pdf26 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEPT.pdf26 Dec 2024
Layout approvalFile: PLAN.pdf22 May 2024
Building plan approvalFile: PLAN.pdf22 May 2024
Copy of the legal title reportFile: TITLE REPORT NEW.pdf22 May 2024
Details of encumbrances concerned to FinanceFile: NO INCUMBRANCE.pdf22 May 2024
Details of encumbrances concerned to LegalFile: NO INCUMBRANCE.pdf22 May 2024
Copy of Layout Approval (in case of layout)File: PLAN.pdf22 May 2024
Building Plan Approval / NA Order for plotted developmentFile: PLAN.pdf22 May 2024
Commencement Certificates / NA Order for plotted developmentFile: COMM CERT.pdf22 May 2024
Declaration about Commencement CertificateFile: cc declaration.pdf22 May 2024
Declaration in FORM BFile: FORM B.pdf22 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf22 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf22 May 2024
CERSAI detailsFile: CERSAI DECLARATION.pdf22 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf22 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest.pdf22 May 2024
Proforma of Allotment letterFile: ALLOTMENT DRAFT NEW.pdf22 May 2024
Proforma of Agreement for saleFile: DRAFT SALE FINAL.pdf22 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A bank account decla (15).pdf22 May 2024
Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT.pdf22 May 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION DRAFT SALE.pdf22 May 2024
Other - LegalFile: Lease Doc 1.pdf22 May 2024
Other - LegalFile: Lease Doc 2.pdf22 May 2024
Other - LegalFile: Lease Doc 3.pdf22 May 2024
Other - LegalFile: Lease doc 4.pdf22 May 2024
Other - LegalFile: Power 1.pdf22 May 2024
Other - LegalFile: Power 2.pdf22 May 2024
Other - LegalFile: Power 3 .pdf22 May 2024
Other - LegalFile: PartnershipDeed.pdf22 May 2024
Other - TechnicalFile: ANNEXURE A.pdf22 May 2024
PAN CardFile: 1 PAN Card.pdf6 May 2024

How this compares with Raigarh

6%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 6 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CLUSTER RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAHAL5,900+ in Raigarh

2 kmCLUSTER RESIDENCYCompleted 186Lapsed / revoked 51Other 125Dot size: filed unitsN

Filed coordinates, straight-line distance. 362 registered projects within 2 km.

Builder: CLUSTER REALITY

CLUSTER REALITY has 1 registration on MahaRERA, including CLUSTER RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if CLUSTER RESIDENCY is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CLUSTER RESIDENCY?

The registered promoter entity is CLUSTER REALITY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CLUSTER RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CLUSTER RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CLUSTER RESIDENCY?

The professionals named in the filing: Architect: KALPAK ARCHITECTS; Engineer: STRUCON CONSULTING AND ENGINEERS; Chartered Accountant: MANISH K RAMAWATI AND COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CLUSTER RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CLUSTER RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CLUSTER RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.