Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Jan 2021Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 50%
1Complaints at MahaRERAon this registration
Jump to the 19 documents Report an error

CLASSICAL RESIDENCY is a Others project by CLASSIC BUILDER & DEVELOPER in Sindhudurg, Maharashtra, registered with MahaRERA as P52900024612 on 24 Feb 2020. The registration is recorded completed; possession was promised by 31 Jan 2021. 1 complaint is on record with the regulator.

At a glance

Project

  • NameCLASSICAL RESIDENCY
  • TypeOthers
  • Location
    • KUDAL VENGURLA ROAD
    • DEWOOLWADI
    • Pinguli
    • Kudal
    • Sindhudurg
    • 416528
  • Pincode416528
  • RERA no.P52900024612
  • ReraGenie IDRG-MH-27910

Builder

  • NameCLASSIC BUILDER & DEVELOPER
  • Entity typePartnership
  • PartnersARIF ISAK KHAN, AFRIN ARIF KHAN, AFRIN ARIF KHAN, ARIF ISAK KHAN
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2020PromisedJan 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Feb 2020
  • Promised completion31 Jan 2021
  • Revised completionNone
  • Buildings1 building record
  • Documents filed19 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CLASSICAL RESIDENCYNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 50%.

CLASSICAL RESIDENCY: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed40

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots40
Open Space40

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,588 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
CLASSIC BUILDER & DEVELOPERPinguliSindhudurg

Approvals and building plan

Permissible FSI1246.29
Proposed, not sanctioned1,246 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchINDUSTRIAL ESTATE , PINGULI, TAL - KUDAL MAHARASHTRA 416528

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
CLASSIC BUILDER & DEVELOPER-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000196462JABAK NAJIR MALDARCLASSIC BUILDER AND DEVELOPER23/03/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Feb 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Feb 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Feb 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Apr 2022

Documents filed19

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4- PG 1.pdf20 Jan 2025
Declaration about Commencement CertificateFile: Signed Commencement Certificate.pdf8 Apr 2022
CERSAI detailsFile: CERSAI_Search_Report_200234801546_For_Asset_Based_Search_08_04_2022_13_11_04_580.pdf8 Apr 2022
Disclosure of sold/ booked inventoryFile: CA Certificate 291 kb.pdf8 Apr 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf8 Apr 2022
OtherFile: Engineers Certificate 676 kb.pdf8 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT_compressed.pdf22 Feb 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AUDIT REPORT_compressed.pdf12 Feb 2020
Layout approvalFile: PLAN.pdf4 Feb 2020
Building plan approvalFile: PEMITION.pdf4 Feb 2020
PAN CardFile: PAN CARD CLASSICAL BUILDER.PDF4 Feb 2020
Copy of the legal title reportFile: TITEL.pdf4 Feb 2020
Details of encumbrancesFile: ENCUMBRANCE.PDF4 Feb 2020
Copy of Layout Approval (in case of layout)File: PLAN.pdf4 Feb 2020
Building Plan Approval / NA Order for plotted developmentFile: PEMITION.pdf4 Feb 2020
Declaration in FORM BFile: ADV_compressed.pdf4 Feb 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTE CER_compressed.pdf4 Feb 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CER_compressed.pdf4 Feb 2020
Proforma of Allotment letterFile: AGREEMENT.pdf4 Feb 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
HILL VIEWDEWOOLWADI PINGULI 4165286CompletedSep 2014Sep 2014

How this compares with Sindhudurg

21%of Sindhudurg projects moved their completion datethis one has not
30%of Sindhudurg registrations have lapsed or been cancelledthis one is completed

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep CLASSICAL RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DEWOOLWADI530+ in Sindhudurg

Builder: CLASSIC BUILDER & DEVELOPER

CLASSIC BUILDER & DEVELOPER has 1 registration on MahaRERA, including CLASSICAL RESIDENCY. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if CLASSICAL RESIDENCY is delayed beyond 31 Jan 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CLASSICAL RESIDENCY?

The registered promoter entity is CLASSIC BUILDER & DEVELOPER, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CLASSICAL RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against CLASSICAL RESIDENCY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for CLASSICAL RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in CLASSICAL RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CLASSICAL RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CLASSICAL RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.