ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / Classic ATULYA

Registration lapsed No litigation declared Others project

Classic ATULYA

By Chourangi Builders and Developers Private Limited

RG-MH-01127 · RERA P50500003037 · Last updated on MahaRERA portal: 23 Jan 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date
  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 0%
2Complaints at MahaRERAon this registration
Jump to the 36 documents Report an error

Classic ATULYA is a Others project by Chourangi Builders and Developers Private Limited in Nagpur, Maharashtra, registered with MahaRERA as P50500003037 on 4 Aug 2017. Possession was promised by 30 Dec 2023 and is now 34 months past that date. 2 complaints are on record with the regulator.

At a glance

Project

  • NameClassic ATULYA
  • TypeOthers
  • Location
    • Khapri
    • Nagpur (Rural)
    • Nagpur
    • 441108
  • Pincode441108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500003037
  • ReraGenie IDRG-MH-01127

Builder

  • NameChourangi Builders and Developers Private Limited
  • Entity typeCompany
  • Managing DirectorSuresh Shankarrao Jadhav
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

34 months past promisethis monthRegisteredAug 2017PromisedDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on4 Aug 2017
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings3 building records
  • Documents filed36 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Atulya A WingNA110000
Atulya B WingNA110000
Atulya C WingNA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 23 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.

Atulya A Wing0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Atulya B Wing0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Atulya C Wing0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Open Space12
BuildingOpen SpaceTotal
Atulya A Wing44
Atulya B Wing44
Atulya C Wing44

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,638 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI60480.0
Proposed, not sanctioned60,480 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBajaj Nagar Nagpur 10

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAssociated Architects
PartnerRole in project
Chourangi Builders and Developers Private Limited-

Litigation declared1

CaseCourtStatus
547 / 2013/2013Mumbai High CourtArbitration in Process

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC004000000030430CHANDRASHEKHAR WASUDEO BHAGWATM/S CHAURANGI BUILDERS PRIVATE LIMITED24/11/2022
CC12502062SANJIV VIJAY NAIDUChourangi Builders and Developers Private Limited24/06/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed36

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: UNDERTAKING FOR PROFESSIONAL.pdf23 Jan 2025
Declaration in FORM BFile: Notraized Annexure-B for RERA atulya.pdf23 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: UNDERTAKING FOR PROFESSIONAL.pdf23 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: UNDERTAKING FOR PROFESSIONAL.pdf23 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: UNDERTAKING FOR PROFESSIONAL.pdf23 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: UNDERTAKING FOR PROFESSIONAL.pdf23 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: UNDERTAKING FOR PROFESSIONAL.pdf23 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: DECLARATION-2 no rera bank.pdf23 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: UNDERTAKING FOR PROFESSIONAL.pdf23 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: UNDERTAKING FOR PROFESSIONAL.pdf23 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: UNDERTAKING FOR PROFESSIONAL.pdf23 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: UNDERTAKING FOR PROFESSIONAL.pdf23 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: UNDERTAKING FOR PROFESSIONAL.pdf23 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: UNDERTAKING FOR PROFESSIONAL.pdf23 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: ANNEXURE 13- Disclousre unsecured.pdf23 Jan 2025
Declaration about Commencement CertificateFile: DECLARATION-3.pdf21 Jan 2025
Certificates of CA (Form 5)File: Self Declaration Form 5.pdf7 Feb 2019
Building plan approvalFile: Classic Building Map NEW.pdf29 Jul 2017
Layout approvalFile: Plot Layout Plan Classic.pdf29 Jul 2017
PAN CardFile: Pan Card CBDPL.pdf29 Jul 2017
PAN CardFile: Certificate__RBDPL_to_Chourangi.pdf29 Jul 2017
Copy of the legal title reportFile: Registered_Lease_Deed_-_Reatox_Classic.pdf29 Jul 2017
Details of encumbrancesFile: Termination Notice PAP Project.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Plot Layout Plan Classic.pdf29 Jul 2017
Building Plan Approval (IOD)File: Classic Building Map NEW.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Reatox Classic 2009.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Revised Commencement Certificate Reatox Classic 2011.PDF29 Jul 2017
Declaration in FORM BFile: Form B Classic.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: self declration Form 1 and 2.PDF29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: self declration Form 1 and 2.PDF29 Jul 2017
Certificates of CA (Form 3)File: Form 3 Atulya.pdf29 Jul 2017
Certificates of CA (Form 3)File: Form 3 Commercial Shops.pdf29 Jul 2017
Certificates of CA (Form 3)File: Self Declaration Form 3.pdf29 Jul 2017
Proforma of Allotment letterFile: Classic Allotment Letter.pdf29 Jul 2017
Proforma of Allotment letterFile: Classic Draft Agreement to Sale.pdf29 Jul 2017
OtherFile: PAP Appointment of Justice J A Patil.pdf29 Jul 2017

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is among them

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Classic ATULYA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Khapri2,800+ in Nagpur

Builder: Chourangi Builders and Developers Private Limited

Chourangi Builders and Developers Private Limited has 3 registrations on MahaRERA, including Classic Akshay and Classic ATULYA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What does it mean that Classic ATULYA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Classic ATULYA is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Classic ATULYA?

The registered promoter entity is Chourangi Builders and Developers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Classic ATULYA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Classic ATULYA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Classic ATULYA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Classic ATULYA?

The professionals named in the filing: Architect: Associated Architects. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Classic ATULYA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Classic ATULYA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Classic ATULYA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.