Home / Browse projects / Nagpur, Maharashtra / Classic Akshay

Registered Litigation declared Others project

Classic Akshay

By Chourangi Builders and Developers Private Limited

RG-MH-01120 · RERA P50500005480 · Last updated on MahaRERA portal: 21 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • Completion date moved by 120 months
  • 1 extension taken

Clear

  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2032Possession promisedmoved 120 months from the original
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 0%
119 of 150Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 209 documents Report an error

Classic Akshay is a Others project by Chourangi Builders and Developers Private Limited in Nagpur, Maharashtra, registered with MahaRERA as P50500005480 on 11 Aug 2017. Possession is promised by 31 Dec 2032. The completion date has moved by 120 months from the original filing. 31 of the 150 units on this registration are recorded sold or booked, and 0 of 33 construction stages are filed complete.

At a glance

Project

  • NameClassic Akshay
  • TypeOthers
  • Location
    • Maa Durga Chowk
    • Khapri
    • Nagpur (Rural)
    • Nagpur
    • 441108
  • Pincode441108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500005480
  • ReraGenie IDRG-MH-01120

Builder

  • NameChourangi Builders and Developers Private Limited
  • Entity typeCompany
  • DirectorsVandana Savant, Sonalikaa Adyalkar
  • Managing DirectorAtul Shirodkar
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017First promiseDec 2022Revised toDec 2032

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Aug 2017
  • Promised completion31 Dec 2032
  • Revised completionRevised to 31 Dec 2032 (originally 30 Dec 2022)
  • Buildings3 building records
  • Documents filed209 files

Current status

21%31 of 150 units booked
10.2%Work done, per cost certificate

Figures as on 21 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Akshay A WingNA121174047
Akshay B WingNA111148856
Akshay C WingNA1111361147

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 21 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.

Akshay A Wing0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Akshay B Wing0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Akshay C Wing0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed13

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots13
Closed/Covered1
Open Space12
BuildingClosed/CoveredOpen SpaceTotal
Akshay A Wing145
Akshay B Wing044
Akshay C Wing044

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,184 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on22 Apr 2026

Approvals and building plan

Sanctioning authorityMaharashtra Airport Development
Permissible FSI61650.0
Proposed, not sanctioned61,650 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBajaj Nagar, Nagpur - 10
Estimated costRs 68.38 cr
Cost incurredRs 6.96 cr
Work done10.18%
BuildingWingEstimatedIncurred
Akshay A WingNARs 68.38 crRs 6.96 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAssociated Architects
ArchitectParag Sanjay Kotwal
EngineerSagar Jawale
Chartered AccountantRishi Lashkare
Chartered AccountantRavindra Lashkare
PartnerRole in project
Chourangi Builders and Developers Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA12022619808Dec 2022 → Dec 2032

Reason as filed by the promoterPursuant to a competitive bidding process conducted by MADC, the Applicant was selected and awarded the contract for construction of houses and social infrastructure for Project Affected People (“PAPs”). In consideration thereof, MADC granted compensatory land to the CBDPL and executed a registered Lease Deed dated 8th October 2010, thereby transferring and assigning development rights in favour of the CBDPL. In furtherance of the said Lease Deed, CBDPL commenced development of the Project after obtaining Commencement Certificates and other statutory approvals. ***Development Agreement 18.02.2

Litigation declared2

CaseCourtStatus
547 / 2013/2013Mumbai High CourtArbitration in Process
SC/CB2/27/99/2025State Consumer Dispute Redressal Commission, Circuit bench, NagpurOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Jan 2025

Documents filed209

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 209 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form1 - June 2026.pdf21 Jul 2026
Withdrawal Update Form 2File: form 2 march 2026.pdf21 Jul 2026
Withdrawal Update Form 3File: Form 3 - June 2026_compressed.pdf21 Jul 2026
Withdrawal Update Form 1File: Form1 - June 2026.pdf20 Jul 2026
Withdrawal Update Form 2File: form 2 march 2026.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 - June 2026_compressed.pdf20 Jul 2026
Withdrawal Update Form 1File: form 1 - march 2026.pdf5 May 2026
Withdrawal Update Form 2File: form 2 march 2026.pdf5 May 2026
Withdrawal Update Form 3File: form 3 - 31st March 2026_compressed.pdf5 May 2026
Form 2A (FY 2023-2024)File: form 2 A april 23 to March 24.pdf5 May 2026
Form 2A (FY 2021-2022)File: FORM 2A MARCH 2022.pdf5 May 2026
Form 5 (FY 2023-2024)File: Form 5 23- 24.pdf5 May 2026
Withdrawal Update Form 1File: form 1 - june 2025.pdf1 May 2026
Withdrawal Update Form 1File: form 1 - sept 2025.pdf1 May 2026
Withdrawal Update Form 1File: FORM 1 - DEC 2025.pdf1 May 2026
Withdrawal Update Form 2File: Form 2 - Dec 2025.pdf1 May 2026
Withdrawal Update Form 2File: form 2 - 30th Sept 2025.pdf1 May 2026
Withdrawal Update Form 2File: Form 2 - Dec 2025.pdf1 May 2026
Withdrawal Update Form 3File: form 3 - 30th June 2025-compressed.pdf1 May 2026
Withdrawal Update Form 3File: form 3 - 30th June 2025-compressed.pdf1 May 2026
Withdrawal Update Form 3File: Form 3 - Dec 2025_compressed.pdf1 May 2026
Form 2A (FY 2024-2025)File: Form 2A -April 24 to March 25.pdf1 May 2026
Form 5 (FY 2024-2025)File: form 5 - April 2024 to march 2025.pdf1 May 2026
Form 1File: form 1 - march 2023.pdf28 Apr 2026
Form 2File: form 2 - 31st March 2023.pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: inventory - March 2023.pdf28 Apr 2026
Form 3File: form 3 - 31st March 2023_compressed.pdf28 Apr 2026
Form 1File: form 1 - June 2023.pdf28 Apr 2026
Form 2File: form 2 - 30th June 2023.pdf28 Apr 2026
Form 3File: form 3 - 30th June 2023.pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: Inventory - June 2023.pdf28 Apr 2026
Form 1File: form 1 - sept 2023.pdf28 Apr 2026
Form 2File: form 2 - 30th sept 2023.pdf28 Apr 2026
Form 3File: form 3 - 30th Sept 2023.pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: inventory - Sept 2023.pdf28 Apr 2026
Form 1File: form 1- december 2023.pdf28 Apr 2026
Form 2File: form 2 - 31st dec 2023.pdf28 Apr 2026
Form 3File: form 3 - 31st Dec 2023_compressed.pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: inventory - Dec 2023.pdf28 Apr 2026
Form 1File: form 1 - Sept 2024.pdf28 Apr 2026
Form 2File: form 2 - 30th Sept 2024.pdf28 Apr 2026
Form 3File: form 3 - 30th Sept 2024_compressed.pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: Inventory - Sept 2024.pdf28 Apr 2026
Form 1File: form 1 - march 2024.pdf28 Apr 2026
Form 2File: form 2 - 31st March 2024.pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: Inventory March 2024.pdf28 Apr 2026
Form 3File: Form 3 - March 2024_compressed.pdf28 Apr 2026
Form 1File: form 1 - june 2024.pdf28 Apr 2026
Form 3File: form 3 - 30th June 2024-compressed_compressed.pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: inventory - June 2024.pdf28 Apr 2026
Form 2File: Form 2 June 2024.pdf28 Apr 2026
Form 2File: form 2 - 31st dec 2024.pdf28 Apr 2026
Form 3File: form 3 - 31st Dec 2024_compressed.pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: inventory - Dec 2024.pdf28 Apr 2026
Form 1File: form 1 - Dec 2024.pdf28 Apr 2026
Form 1File: form 1- march 2025.pdf28 Apr 2026
Disclosure of Sold and Booked InventoryFile: inventory - March 2025.pdf28 Apr 2026
Form 2File: Form 2 March 2025.pdf28 Apr 2026
Form 3File: form 3 - 31st march 2025_compressed.pdf28 Apr 2026
Form 1File: FORM 1 - SEPT 17.pdf10 Feb 2026
Form 2File: form 2 - sept 17.pdf10 Feb 2026
Form 3File: form 3 Sept 17.pdf10 Feb 2026
Disclosure of Sold and Booked InventoryFile: INVENTORY - SEPT -17.pdf10 Feb 2026
Form 1File: FORM 1 - DEC 17.pdf10 Feb 2026
Form 2File: form 2 -dec 17.pdf10 Feb 2026
Form 3File: form 3 dec 17.pdf10 Feb 2026
Disclosure of Sold and Booked InventoryFile: INVENTORY - DEC 17.pdf10 Feb 2026
Form 1File: FORM 1 - MAR 18.pdf10 Feb 2026
Form 2File: form 2 - mar 18.pdf10 Feb 2026
Form 3File: form 3 mar 18.pdf10 Feb 2026
Disclosure of Sold and Booked InventoryFile: INVENTORY - MAR 18.pdf10 Feb 2026
Form 1File: FORM 1 - JUN 18.pdf10 Feb 2026
Form 2File: form 2 - jun 18.pdf10 Feb 2026
Form 3File: form 3 jun 18.pdf10 Feb 2026
Disclosure of Sold and Booked InventoryFile: INVENTORY - JUN 18.pdf10 Feb 2026
Form 1File: FORM 1 - SEPT 18.pdf10 Feb 2026
Form 2File: form 2 - sept 18.pdf10 Feb 2026
Form 3File: form 3 sept 18.pdf10 Feb 2026
Disclosure of Sold and Booked InventoryFile: INVENTORY - SEPT 18.pdf10 Feb 2026
Form 1File: FORM 1 - DEC 18.pdf10 Feb 2026

How this compares with Nagpur

21%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 120 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Classic Akshay on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Khapri2,800+ in Nagpur

2 kmClassic AkshayCompleted 1Lapsed / revoked 3Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: Chourangi Builders and Developers Private Limited

Chourangi Builders and Developers Private Limited has 3 registrations on MahaRERA, including Classic Akshay and Classic ATULYA. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Classic Akshay is delayed beyond 31 Dec 2032?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Classic Akshay?

The registered promoter entity is Chourangi Builders and Developers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Classic Akshay?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Classic Akshay?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Classic Akshay?

The professionals named in the filing: Architect: Associated Architects; Architect: Parag Sanjay Kotwal; Engineer: Sagar Jawale; Chartered Accountant: Rishi Lashkare; Chartered Accountant: Ravindra Lashkare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Classic Akshay?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Classic Akshay. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Classic Akshay to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.