Home / Browse projects / Raigarh, Maharashtra / CLAN CITY-DIAMOND
CLAN CITY-DIAMOND
By Supreme Construction and Developers Private Limited
RG-MH-20718 · RERA P52000006812 · Last updated on MahaRERA portal: 18 Mar 2023
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 31 months past the filed date
- 34 complaints at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CLAN CITY-DIAMOND is a Residential / Group Housing project by Supreme Construction and Developers Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000006812 on 16 Aug 2017. Possession was promised by 29 Mar 2024 and is now 31 months past that date. The completion date has moved by 12 months from the original filing. 34 complaints are on record with the regulator.
At a glance
Project
- NameCLAN CITY-DIAMOND
- TypeResidential / Group Housing
- Location
- NH4
- TALOJA
- Rohinjan
- Panvel
- Raigarh
- 410208
- Pincode410208
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000006812
- ReraGenie IDRG-MH-20718
Builder
- NameSupreme Construction and Developers Private Limited
- Entity typeCompany
- Managing DirectorManulla Mehbullah Kanchwala
- Other registrations8 more →
- No longer live9 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on16 Aug 2017
- Promised completion29 Mar 2024
- Revised completionRevised to 29 Mar 2024 (originally 30 Mar 2023)
- Buildings1 building record
- Documents filed44 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| DIAMOND | NA | 39 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 18 Mar 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 99%.
DIAMOND: 57% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 88% |
| Basement (if any) | 88% |
| Podiums (if any) | 41% |
| Plinth | 88% |
| Stilt Floor | 37% |
| Slabs of Super Structure | 99% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 26% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 96% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 25% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 18 Mar 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Dimensions Architects Pvt Ltd |
| Engineer | Shrikhande Consultants Pvt Ltd |
| Partner | Role in project |
|---|---|
| Supreme Construction and Developers Private Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThis project has a special status as it is in collaboration with regional planning authority, MMRDA, constituted by the state Government. As per the role defined in the scheme, the developer is supposed to hand over constructed affordable houses, free of cost to MMRDA against the additional FSI and provision of all off site infrastructure to the project by MMRDA. We have paid total infrastructure charges amounting about Rs Six Crores to MMRDA 6 years back however MMRDA has completely failed to even start the works of water supply, sewage system and storm water drainage work. In the absence of
Litigation declared4
| Case | Court | Status |
|---|---|---|
| 340,348,342,343,351,344,349/2017 | Bombay High Court | FINAL ORDER PASSED MATTER DISPOSED |
| 77,79,84,80,75,74,76/2017 | Bombay High Court | FINAL ORDER PASSED MATTER DISPOSED |
| 191,192,193,194,195,310,311/2017 | Bombay High Court | FINAL ORDER PASSED MATTER DISPOSED |
| 20274/2017 | Bombay High Court | Pending |
Complaints filed with MahaRERA34
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000023779 | MANOJKUMAR CHANDRESHWAR MHATRE | SUPREME CONSTRUCTIONS AND DEVELOPERS PVT LTD. | 20/03/2018 |
| CC006000000023936 | Hira R Jadhwani | Supreme Construction and Developers Pvt Ltd | 04/04/2018 |
| CC006000000089892 | MR. ANKIT AGGARWAL | SUPREME CONSTRUCTION AND DEVELOPERS PRIVATE LIMITED | 13/07/2019 |
| CC006000000196326 | Shrikant R Prabhu | Supreme Construction & Developer Pvt Ltd | 20/03/2021 |
| CC006000000303326 | DARSHANA KEDAR SALGAONKAR | Supreme Construction and Developer Pvt Ltd | 15/11/2022 |
| CC006000000334049 | Mr Shankar Kumar Jha and Mrs Meenu Shankar Jha | Supreme Construction and Developers Pvt Ltd | 20/01/2023 |
| CC006000000354324 | Hira Menghraj Jadhawani | Supreme Construction and Developers Pvt Ltd | 13/02/2023 |
| CC006000000354421 | Ramesh Narayan Deshpande | Supreme Construction & Developers Pvt Ltd | 27/02/2023 |
| CC006000000354465 | Mr Dilip Baburao Shinde and Mrs Dipika Dilip Shinde | Supreme Construction and Developers Pvt Ltd | 22/02/2023 |
| CC006000000374782 | Anil Gope Jagtiani | Supreme Construction and Developers Pvt Ltd | 14/03/2023 |
| CC006000000374890 | Mabel Jennifer Dharmai | Supreme Constructions and Developers Pvt Ltd | 22/03/2023 |
| CC006000000375371 | Naresh Parshottam Jumani | Supreme Construction and Developers Pvt Ltd | 23/04/2023 |
| CC006000000395469 | PANDIT MADHUKAR KOTIWALE | SUPREME CONSTRUCTION AND DEVELOPERS | 22/07/2023 |
| CC006000000395582 | Mrs Yasmin Siraj Panjwani | Supreme Construction and Developers Pvt Ltd | 08/05/2023 |
| CC006000000395594 | Mrs Yasmin Siraj Panjwani | Supreme Construction and Developers Pvt Ltd | 08/05/2023 |
| CC006000000395979 | MR DHANANJAY VILAS KARAMBELKAR | M/S SUPREME CONSTRUCTIONS AND DEVELOPERS PVT LTD | 30/06/2023 |
| CC006000000396022 | Sunil Ramchandra Mundle | Supreme Construction and Developers Pvt Ltd | 01/06/2023 |
| CC006000000396024 | Pallavi Sunil Mundle | Supreme Construction and Developers Pvt Ltd | 01/06/2023 |
| CC006000000396704 | Priti Clement Thomas | Supreme Construction and Developers Private Limited | 17/07/2023 |
| CC006000000397579 | PRAKASH CHANDRA LOHIA | MANULLA MEHBULLAH KANCHWALA | 24/09/2023 |
| CC006000000408110 | Mohammed Razzak Shaikh and Sanjeedabano Mohd Razaq | Supreme Construction and Developers Pvt Ltd | 08/11/2023 |
| CC006000000480107 | Nisha Rodrigues | Supreme Construction and Developers Ltd | 17/04/2024 |
| CC006000000570838 | Kanchan Sharma | Supreme Developers & Construction PVT LTD | 09/07/2024 |
| CC12500325 | NItin Srichand Chabria | Supreme Construction and Developers Private Limited | 30/01/2025 |
| CC12500637 | ClanCity Welfare association | Supreme Construction and Developers Private Limited | 23/02/2025 |
| CC12501333 | NAEEM ABDUL REHMAN CHIPPA | Supreme Construction and Developers Private Limited | 22/04/2025 |
| CC12501777 | JAIKUMAR Parasnath Jaiswar | Supreme Construction and Developers Private Limited | 30/05/2025 |
| CC12503632 | ADITYA RAJESH GAWDE | Supreme Construction and Developers Private Limited | 12/10/2025 |
| CC12600056 | BABAJI SADASHIV DUMBRE | Supreme Construction and Developers Private Limited | 04/01/2026 |
| CC12503633 | ADITYA RAJESH GAWDE | Supreme Construction and Developers Private Limited | 12/10/2025 |
| CC12503916 | Rohan Anand | Supreme Construction and Developers Private Limited | 08/11/2025 |
| CC12504112 | Shrikant Das | Supreme Construction and Developers Private Limited | 22/11/2025 |
| CC12504227 | Jyoti Kumar Verma | Supreme Construction and Developers Private Limited | 29/11/2025 |
| CC12504334 | Preeti Choudhary | Supreme Construction and Developers Private Limited | 07/12/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed44
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf | 18 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Architect Certificate.pdf | 18 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineer Certificate ok.pdf | 18 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Engineer's Certificate Quality Assurance F Y 2019 2020.pdf | 18 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Engineer's Certificate Quality Assurance F Y 2020 2021.pdf | 18 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Engineer's Certificate Quality Assurance F Y 20212022.pdf | 18 Mar 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory DIAMOND.pdf | 18 Mar 2023 |
| CERSAI detailsFile: CERSAI diamond.pdf | 18 Mar 2023 |
| Certificates of CA (Form 3)File: FORM3 C A Certificate DIAMOND.pdf | 18 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organization-Ibrahim Mirza ok.pdf | 18 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organization-Manulla Kanchwala.pdf | 18 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Anual Audit Report of Statutory CA Diamond 18 19.pdf | 18 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Anual Audit Report of Statutory CA Diamond 19 20.pdf | 18 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Anual Audit Report of Statutory CA Diamond 20 21.pdf | 18 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Anual Audit Report of Statutory CA Diamond 21 22.pdf | 18 Mar 2023 |
| Certificates of CA (Form 5)File: RERA Form-5_T3_Diamond.pdf | 10 Apr 2019 |
| Proforma of Allotment letterFile: RERA Agreement - WITHOUT SUBVENTION1.pdf | 18 Oct 2018 |
| Proforma of Allotment letterFile: RERA Agreement -SUBVENTION1.pdf | 17 Oct 2018 |
| Proforma of Allotment letterFile: draft agreement.pdf | 6 Sep 2018 |
| Proforma of Allotment letterFile: Rera Agreement -NEW.pdf | 7 Mar 2018 |
| Declaration in FORM BFile: FORM - B DIAMOND.pdf | 23 Aug 2017 |
| Proforma of Allotment letterFile: Rera Agreement Draft Revised.pdf | 23 Aug 2017 |
| Layout approvalFile: Sheet-09.pdf | 26 Jul 2017 |
| Building plan approvalFile: CC Copy.pdf | 26 Jul 2017 |
| Layout approvalFile: Sheet-01.pdf | 26 Jul 2017 |
| Layout approvalFile: Sheet-02.pdf | 26 Jul 2017 |
| Layout approvalFile: Sheet-03.pdf | 26 Jul 2017 |
| Layout approvalFile: Sheet-08.pdf | 26 Jul 2017 |
| PAN CardFile: SUPREME - PAN.pdf | 26 Jul 2017 |
| Copy of the legal title reportFile: 2013 Title Clearance.pdf | 26 Jul 2017 |
| Details of encumbrancesFile: NO INCUMBRANCE -DIAMOND.pdf | 26 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Sheet-01.pdf | 26 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Sheet-02.pdf | 26 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Sheet-03.pdf | 26 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Sheet-08.pdf | 26 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: Sheet-09.pdf | 26 Jul 2017 |
| Building Plan Approval (IOD)File: CC Copy.pdf | 26 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Copy.pdf | 26 Jul 2017 |
| Declaration in FORM BFile: FORM B - DIAMOND.pdf | 26 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 -DIAMOND.pdf | 26 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - DIAMOND.pdf | 26 Jul 2017 |
| Certificates of CA (Form 3)File: FORM-3 DIAMOND.pdf | 26 Jul 2017 |
| Proforma of Allotment letterFile: Rera Agreement Draft.pdf | 26 Jul 2017 |
| Proforma of Allotment letterFile: Allotment Letter Draft.pdf | 26 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 44 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep CLAN CITY-DIAMOND on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near TALOJA5,900+ in Raigarh
Filed coordinates, straight-line distance. 134 registered projects within 2 km.
Plot No -1 Sector -29 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
Plot No.-1 Sector -39 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
Plot No -1 Sector -31 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
SAI SUNCITY PHASE II
Chariot Properties LLP
Plot No. 14 Sector-37 Taloja
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
ARIHANT ADARSH PHASE I
ARIHANT SUPERSTRUCTURES LIMITED
See every Raigarh project, with the district possession charts
Builder: Supreme Construction and Developers Private Limited
Supreme Construction and Developers Private Limited has 9 registrations on MahaRERA, including CLAN CITY - SAPPHIRE and CLAN CITY-TURQUOISE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What does it mean that CLAN CITY-DIAMOND shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if CLAN CITY-DIAMOND is delayed beyond 29 Mar 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CLAN CITY-DIAMOND?
The registered promoter entity is Supreme Construction and Developers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CLAN CITY-DIAMOND?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against CLAN CITY-DIAMOND?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for CLAN CITY-DIAMOND?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CLAN CITY-DIAMOND?
The professionals named in the filing: Architect: Dimensions Architects Pvt Ltd; Engineer: Shrikhande Consultants Pvt Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CLAN CITY-DIAMOND?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback