Registration lapsed No litigation declared Residential / Group Housing project

CLAN CITY-AQUA MARINE

By Supreme Construction and Developers Private Limited

RG-MH-20799 · RERA P52000002531 · Last updated on MahaRERA portal: 18 Mar 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 31 months past the filed date
  • 34 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Mar 2024Possession promised31 months past this date
0 of 11Construction stages donefurthest along: Slabs of Super Structure, 76%
34Complaints at MahaRERAon this registration
Jump to the 43 documents Report an error

CLAN CITY-AQUA MARINE is a Residential / Group Housing project by Supreme Construction and Developers Private Limited in Raigarh, Maharashtra, registered with MahaRERA as P52000002531 on 1 Aug 2017. Possession was promised by 29 Mar 2024 and is now 31 months past that date. The completion date has moved by 12 months from the original filing. 34 complaints are on record with the regulator.

At a glance

Project

  • NameCLAN CITY-AQUA MARINE
  • TypeResidential / Group Housing
  • Location
    • NH4
    • TALOJA
    • Rohinjan
    • Panvel
    • Raigarh
    • 410208
  • Pincode410208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000002531
  • ReraGenie IDRG-MH-20799

Builder

  • NameSupreme Construction and Developers Private Limited
  • Entity typeCompany
  • Managing DirectorManulla Mehbullah Kanchwala
  • Other registrations8 more →
  • No longer live9 lapsed, de-registered or revoked

Key dates

31 months past promisethis monthRegisteredAug 2017First promiseMar 2023Revised toMar 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on1 Aug 2017
  • Promised completion29 Mar 2024
  • Revised completionRevised to 29 Mar 2024 (originally 30 Mar 2023)
  • Buildings1 building record
  • Documents filed43 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AQUA MARINENA390000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Mar 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 76%.

AQUA MARINE: 45% average across the applicable activities

ActivityProgress
Excavation75%
Basement (if any)75%
Podiums (if any)36%
Plinth75%
Stilt Floor32%
Slabs of Super Structure76%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises22%
Sanitary Fittings within the flats / premises12%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks74%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.11%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.4%

Progress on shared amenities15

As on 18 Mar 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,320 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6325.47
Proposed, not sanctioned6,325 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAnchorage Bldg, 170-171, Central Avenue, Chembur, Mumbai - 400 071

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDimensions Architects Pvt Ltd
EngineerShrikhande Consultants Pvt Ltd
PartnerRole in project
Supreme Construction and Developers Private Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000015089Mar 2023 → Mar 2024

Reason as filed by the promoterThis project has a special status as it is in collaboration with regional planning authority, MMRDA, constituted by the state Government. As per the role defined in the scheme, the developer is supposed to hand over constructed affordable houses, free of cost to MMRDA against the additional FSI and provision of all off site infrastructure to the project by MMRDA. We have paid total infrastructure charges amounting about Rs Six Crores to MMRDA 6 years back however MMRDA has completely failed to even start the works of water supply, sewage system and storm water drainage work. In the absence of

Litigation declared4

CaseCourtStatus
340,348,342,343,351,344,349/2017Bombay High CourtFINAL ORDER PASSED MATTER DISPOSED
77,79,84,80,75,74,76/2017Bombay High CourtFINAL ORDER PASSED MATTER DISPOSED
191,192,193,194,195,310,311/2017Bombay High CourtFINAL ORDER PASSED MATTER DISPOSED
20274/2017Bombay High CourtPending

Complaints filed with MahaRERA34

Case no.ComplainantRespondentFiled
CC006000000197691Mr. Vijay MishraniSupreme Construction & Developers Pvt. Ltd.22/07/2021
CC006000000161298RAMESH JOSHISUPREME CONSTRUCTION AND DEVELOPERS PVT LTD18/10/2019
CC006000000196977Rajshekhar SwamiSupreme Construction and Developers Private Limited17/05/2021
CC006000000198508URMILA THAKURMANULLA MEHBULLAH KANCHWALA29/09/2021
CC006000000220924URMILA THAKURMANULLA MEHBULLAH KANCHWALA01/05/2022
CC006000000199230Subhash Chandra AgarwalSupreme Construction & Developers Pvt. Ltd.01/12/2021
CC006000000220933Gurcharan Singh TalwarSupreme Construction and Developer Pvt Ltd22/04/2022
CC006000000251774Nanda MaheswariM/s. Supreme Construction and Developers Pvt. Ltd.07/07/2022
CC006000000261942Mr. Bhupesh Singh and Mrs. Alka Bhupesh SinghM/s. Supreme Constructions and Developers18/07/2022
CC006000000261943Mrs. Alka Bhupesh Singh and Mr. Bhupesh SinghM/s. Supreme Constructions and Developers18/07/2022
CC006000000333963Chander ParkashSupreme construction and developers pvt ltd15/01/2023
CC006000000334063Nilkanth Arjun MasaneSupreme Construction and Developers Pvt. Ltd.31/01/2023
CC006000000334144Mrs Shubhada Satish NeneSupreme Construction and Developers Pvt Ltd30/01/2023
CC006000000344184Mr Rajaram Bajirao BhosaleSupreme Construction and Developers Pvt Ltd01/02/2023
CC006000000344268Mrs Smeeta S Lad Mr Amit S Lad Mrs Payal A LadSupreme Construction and Developers Pvt Ltd09/02/2023
CC006000000354348Jitesh Kumar ChouhanSupreme Construction and Developers Pvt Ltd15/02/2023
CC006000000354349Mrs Seemakurthi Bramara Prasad and Mr Seemakurthi NagaprasadSupreme Construction and Developers Pvt Ltd15/02/2023
CC006000000354350Shailendra Kumar Mittal and Asha S MittalSupreme Construction and Developers Pvt Ltd15/02/2023
CC006000000374995Mrs Olive Peter Fernandes and Mr Peter FernandesSupreme Construction and Developers Pvt Ltd28/03/2023
CC006000000396020Mr Irfan Muniruddin ShaikhSupreme Construction and Developers Pvt Ltd01/06/2023
CC006000000396370Mr Mohammad Abbas Nathani and Mrs Ehnaz M NathaniSupreme Construction and Developers Pvt Ltd21/06/2023
CC006000000396813Shivshankar Ramkedar DubeySupreme Construction and Developers Pvt Ltd24/07/2023
CC006000000396901Sanjay Mithailal DubeySupreme Construction and Developers Pvt Ltd01/08/2023
CC006000000479785Dayanand Shantaram LadSupreme Construction and Developers Pvt Ltd26/03/2024
CC006000000580846Kanchan SharmaSupreme Developers & Construction Pvt Ltd09/07/2024
CC006000000580950Hilary Stevan RegoSupreme Construction and Developers Pvt Ltd27/06/2024
CC12500647ClanCity Welfare associationSupreme Construction and Developers Private Limited24/02/2025
CC12600139Sanket Omprakash JhaverSupreme Construction and Developers Private Limited09/01/2026
CC12501605Mohd Ayub Mohd Hanif QureshiSupreme Construction and Developers Private Limited15/05/2025
CC12503460Manju Ashok KharwadSupreme Construction and Developers Private Limited28/09/2025
CC12503910Deepak NambiarSupreme Construction and Developers Private Limited07/11/2025
CC12504230Rajiv MendirattaSupreme Construction and Developers Private Limited29/11/2025
CC12600380Dilip AgrawalSupreme Construction and Developers Private Limited20/01/2026
CC12600527Shrikant ManeSupreme Construction and Developers Private Limited30/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed43

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE ok.pdf18 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 Architect Certificate ok.pdf18 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 Engineer Certificate ok.pdf18 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form - 2A - Engineer's Certificate (Quality Assurance)-F Y 2019-2020.pdf18 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Engineer's Certificate Quality Assurance F Y 2020 2021.pdf18 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Engineer's Certificate Quality Assurance F Y 2021 2022.pdf18 Mar 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory AQUAMARINE.pdf18 Mar 2023
CERSAI detailsFile: CERSAI AQUA MARINE.pdf18 Mar 2023
Certificates of CA (Form 3)File: FORM 3 C A Certificate AQUA MARINE.pdf18 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organization Manulla Kanchwala ok.pdf18 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organization-Ibrahim Mirza ok.pdf18 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Anual Audit Report of Statutory CA 18 19.pdf18 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Anual Audit Report of Statutory CA-Aqua 19 20.pdf18 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Anual Audit Report of Statutory CA 20 21.pdf18 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Anual Audit Report of Statutory CA 21 22.pdf18 Mar 2023
Certificates of CA (Form 5)File: RERA Form-5_T9_Aquamarine.pdf10 Apr 2019
Proforma of Allotment letterFile: RERA Agreement - WITHOUT SUBVENTION1.pdf18 Oct 2018
Proforma of Allotment letterFile: RERA Agreement -SUBVENTION1.pdf17 Oct 2018
Proforma of Allotment letterFile: draft agreement.pdf6 Sep 2018
Proforma of Allotment letterFile: Rera Agreement -NEW.pdf7 Mar 2018
Proforma of Allotment letterFile: Rera Agreement Draft Revised.pdf16 Aug 2017
Layout approvalFile: Sheet-02.pdf26 Jul 2017
Layout approvalFile: Sheet-01.pdf26 Jul 2017
Building plan approvalFile: CC Copy.pdf26 Jul 2017
Layout approvalFile: Sheet-03.pdf26 Jul 2017
Layout approvalFile: Sheet-18.pdf26 Jul 2017
Layout approvalFile: Sheet-19.pdf26 Jul 2017
PAN CardFile: SUPREME - PAN.pdf26 Jul 2017
Copy of the legal title reportFile: 2013 Title Clearance.pdf26 Jul 2017
Details of encumbrancesFile: NO INCUMBRANCE -AQUAMARINE.pdf26 Jul 2017
Copy of Layout Approval (in case of layout)File: Sheet-01.pdf26 Jul 2017
Copy of Layout Approval (in case of layout)File: Sheet-02.pdf26 Jul 2017
Copy of Layout Approval (in case of layout)File: Sheet-03.pdf26 Jul 2017
Copy of Layout Approval (in case of layout)File: Sheet-18.pdf26 Jul 2017
Copy of Layout Approval (in case of layout)File: Sheet-19.pdf26 Jul 2017
Building Plan Approval (IOD)File: CC Copy.pdf26 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC Copy.pdf26 Jul 2017
Declaration in FORM BFile: FORM B - AQUAMARINE.pdf26 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 -AQUAMARINE.pdf26 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - AQUAMARINE.pdf26 Jul 2017
Certificates of CA (Form 3)File: FORM-3 AQUMARINE.pdf26 Jul 2017
Proforma of Allotment letterFile: Rera Agreement Draft.pdf26 Jul 2017
Proforma of Allotment letterFile: Allotment Letter Draft.pdf26 Jul 2017

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is among them

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CLAN CITY-AQUA MARINE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TALOJA5,900+ in Raigarh

2 kmCLAN CITY-AQUA MARINECompleted 21Lapsed / revoked 29Other 67Dot size: filed unitsN

Filed coordinates, straight-line distance. 117 registered projects within 2 km.

Builder: Supreme Construction and Developers Private Limited

Supreme Construction and Developers Private Limited has 9 registrations on MahaRERA, including CLAN CITY - SAPPHIRE and CLAN CITY-TURQUOISE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What does it mean that CLAN CITY-AQUA MARINE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if CLAN CITY-AQUA MARINE is delayed beyond 29 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CLAN CITY-AQUA MARINE?

The registered promoter entity is Supreme Construction and Developers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CLAN CITY-AQUA MARINE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against CLAN CITY-AQUA MARINE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for CLAN CITY-AQUA MARINE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CLAN CITY-AQUA MARINE?

The professionals named in the filing: Architect: Dimensions Architects Pvt Ltd; Engineer: Shrikhande Consultants Pvt Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CLAN CITY-AQUA MARINE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CLAN CITY-AQUA MARINE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CLAN CITY-AQUA MARINE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.