Home / Browse projects / Raigarh, Maharashtra / CITYOPIA WING -E
CITYOPIA WING -E
By CITYOPIA VENTURES PRIVATE LIMITED
RG-MH-29064 · RERA P52000027809 · Last updated on MahaRERA portal: 20 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 42 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CITYOPIA WING -E is a Residential / Group Housing project by CITYOPIA VENTURES PRIVATE LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000027809 on 4 Jan 2021. Possession is promised by 31 Dec 2029. The completion date has moved by 42 months from the original filing. 3 of the 4 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.
At a glance
Project
- NameCITYOPIA WING -E
- TypeResidential / Group Housing
- Location
- KOLKHE
- PANVEL
- Raigarh
- 410221
- Pincode410221
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000027809
- ReraGenie IDRG-MH-29064
Builder
- NameCITYOPIA VENTURES PRIVATE LIMITED
- Entity typeCompany
- DirectorPRASHANT PRABHAKAR PATEKAR
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on4 Jan 2021
- Promised completion31 Dec 2029
- Revised completionRevised to 31 Dec 2029 (originally 30 Jun 2026)
- Buildings1 building record
- Documents filed114 files
Current status
Figures as on 20 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| CITYOPIA WING -E | NA | 5 | 1 | 4 | 0 | 4 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
CITYOPIA WING -E: 9% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed460
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| CITYOPIA WING -E | NA | Rs 69.84 cr | - |
| - | NA | Rs 3.68 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | stapl soyuz tallb architects |
| Engineer | asc Associated Structural Engineers LLp |
| Engineer | S K Consultants & Engineers |
| Chartered Accountant | N B Sayed & Associates |
| Chartered Accountant | PRANAV BHASKARAN & ASSOCIATES |
| Partner | Role in project |
|---|---|
| CITYOPIA VENTURES PRIVATE LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project is presently sanctioned up to Ground + 1st Floor under the existing Commencement Certificate (CC). We have submitted a revised proposal for development up to 32 floors, and the revised plans are currently under review and approval by the competent authority. Since construction beyond the approved level cannot be undertaken until the revised Commencement Certificate and related statutory approvals are obtained, the progress of the project has been affected. The delay is attributable to the time required for obtaining regulatory approvals from the concerned authorities and is beyond
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Dec 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Dec 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Sep 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed114
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 - Cityopia Wing E as on June 2026.pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 - Cityopia Wing - E-Signed.pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 - Cityopia Wing E - 30062026Signed.pdf | 20 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 - Cityopia Wing E as on June 2026.pdf | 14 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 - Cityopia Wing E as on June 2026.pdf | 14 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 - Cityopia Wing E as on June 2026.pdf | 14 Jul 2026 |
| Form 5 (FY 2024-2025)File: Form 5 - Cityopia Wing - E for FY 2024-25.pdf | 5 Jun 2026 |
| Form 5 (FY 2023-2024)File: Form 5 - Cityopia Wing - E for FY 2023-24.pdf | 5 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 - Wing E 31 03 2026.pdf | 15 May 2026 |
| Withdrawal Update Form 2File: Form - 2 Wing E 31 03 2026.pdf | 15 May 2026 |
| Withdrawal Update Form 3File: Form - 3 - Wing E 31 03 2026.pdf | 15 May 2026 |
| Form 1File: Form 1 - Cityopia Wing E as on Dec 2025.pdf | 11 Feb 2026 |
| Form 2File: Form 2 - Cityopia Wing E as on Dec 2025.pdf | 11 Feb 2026 |
| Form 3File: Form 3 - Cityopia Wing E as on Dec 2025.pdf | 11 Feb 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Cityopia Wing E as on Dec 2025.pdf | 11 Feb 2026 |
| Form 1File: Form 1 - Cityopia Wing E as on Sep 2025.pdf | 16 Oct 2025 |
| Form 2File: Form 2 - Cityopia Wing E as on Sep 2025.pdf | 16 Oct 2025 |
| Form 3File: Form 3 - Cityopia Wing E as on Sep 2025.pdf | 16 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Cityopia Wing E as on Sep 2025.pdf | 16 Oct 2025 |
| Form 1File: Form 1 - Cityopia Wing - E as on June 2025.pdf | 28 Jul 2025 |
| Form 2File: Form 2 - Cityopia Wing - E as on June 2025.pdf | 28 Jul 2025 |
| Form 3File: Form 3 - Cityopia Wing E 30-06-2025.pdf | 28 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Cityopia Wing - E as on June 2025.pdf | 28 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Cityopia Wing E as on Dec 2024.pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Cityopia Wing E as on Dec2024.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Cityopia Wing - E as on Dec 2024.pdf | 18 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Cityopia Wng E as on September 2024.pdf | 29 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Cityopia Wing E 30-09-2024.pdf | 26 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Cityopia Wing - E as on 30-09-2024.pdf | 26 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Cityopia Wing - E as on June 2024.pdf | 19 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Cityopia Wing E 30-06-2024.pdf | 19 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Cityopia Wing - E as on June 2024.pdf | 17 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Cityopia Wing - E as on March 2024.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Cityopia Wing E 31 -03-2024.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -.pdf | 18 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Cityopia Wing - E as on Dec 2023.pdf | 19 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Cityopia Wing E Dec 2023.pdf | 19 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Cityopia Wing-E as on Dec 2023.pdf | 16 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Cityopia Wing-E as on March 2023.pdf | 21 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Cityopia Wing-E as on June 2023.pdf | 21 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Cityopia Wing-E as on Sept 2023.pdf | 21 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Cityopia Wing - E as on Sep 2023.pdf | 23 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Cityopia Wing - E as on Sep 2023.pdf | 23 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Draft CIRCULAR 29.pdf | 1 Nov 2023 |
| Declaration about Commencement CertificateFile: Draft FORMAT D (32).pdf | 31 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Wing E Oct 2023.pdf | 31 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Draft Form 2A (FY 2020-21).pdf | 31 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Draft Form 2A (FY 2021-22).pdf | 31 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Draft Form 2A (FY 2022-23).pdf | 31 Oct 2023 |
| Building plan approvalFile: Page 1 and 2.pdf | 29 Sep 2023 |
| Building plan approvalFile: Page 3, 4 and 5.pdf | 29 Sep 2023 |
| Building plan approvalFile: Page 6, 7 and 8.pdf | 29 Sep 2023 |
| Building plan approvalFile: Page 9, 10 and 11.pdf | 29 Sep 2023 |
| Building plan approvalFile: Page 12, 13 and 14.pdf | 29 Sep 2023 |
| Building plan approvalFile: Page 15, 16, 17 and 18.pdf | 29 Sep 2023 |
| Building plan approvalFile: Page 19 and 20.pdf | 29 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Page 1 and 2.pdf | 29 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Page 3, 4 and 5.pdf | 29 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Page 6, 7 and 8.pdf | 29 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Page 9, 10 and 11.pdf | 29 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Page 12, 13 and 14.pdf | 29 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Page 15, 16, 17 and 18.pdf | 29 Sep 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Page 19 and 20.pdf | 29 Sep 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Ammended CC.pdf | 29 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 as on 2022-23.pdf | 1 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Cityopia Wing E as on June 2023.pdf | 26 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Cityopia Wing E as on June 2023.pdf | 26 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 21 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 21 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New format- Form 3 Cityopia Wing E Dec 2022.pdf | 21 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: New format- Form 3 Cityopia Wing E March 2023.pdf | 21 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CVPL_E wing_31032023_architects certificate.pdf | 18 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Cityopia Wing E as on September 2022.pdf | 10 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Cityopia Wing E as on September 2022.pdf | 10 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Certificate 099.pdf | 30 Sep 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Cityopia Wing E Form 2- June 2022.pdf | 30 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Cityopia Wing E June 2022.pdf | 30 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Cityopia Wing E - Form 2 - 31-03-2022_compressed.pdf | 23 May 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Cityopia Wing E_ March 2022.pdf | 23 May 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Cityopia Wing E Form 2- 31st December 2021.pdf | 12 May 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 114 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep CITYOPIA WING -E on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PANVEL5,900+ in Raigarh
Filed coordinates, straight-line distance. 57 registered projects within 2 km.
ARIHANT ASPIRE PHASE I
ARIHANT ABODE LIMITED
Green Terraces, Godrej City, Panvel
CAROA PROPERTIES LLP
Nexspace, Godrej City, Panvel
CAROA PROPERTIES LLP
The Highlands, Godrej City, Panvel
CAROA PROPERTIES LLP
LA MER ONE
La Mer Homes LLP
Emperia Hill Crest
Emperia Builtcon
See every Raigarh project, with the district possession charts
Builder: CITYOPIA VENTURES PRIVATE LIMITED
CITYOPIA VENTURES PRIVATE LIMITED has 1 registration on MahaRERA, including CITYOPIA WING -E. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if CITYOPIA WING -E is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CITYOPIA WING -E?
The registered promoter entity is CITYOPIA VENTURES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CITYOPIA WING -E?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for CITYOPIA WING -E?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CITYOPIA WING -E?
The professionals named in the filing: Architect: stapl soyuz tallb architects; Engineer: asc Associated Structural Engineers LLp; Engineer: S K Consultants & Engineers; Chartered Accountant: N B Sayed & Associates; Chartered Accountant: PRANAV BHASKARAN & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CITYOPIA WING -E?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback