Home / Browse projects / Pune, Maharashtra / CITY LIGHTS
CITY LIGHTS
RG-MH-26155 · RERA P52100013655 · Last updated on MahaRERA portal: 19 Oct 2021
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 52 months past the filed date
- 15 complaints at MahaRERA
- Completion date moved by 18 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CITY LIGHTS is a Residential / Group Housing project by MOHINIRAJ ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100013655 on 16 Oct 2017. Possession was promised by 30 Jun 2022 and is now 52 months past that date. The completion date has moved by 18 months from the original filing. 15 complaints are on record with the regulator.
At a glance
Project
- NameCITY LIGHTS
- TypeResidential / Group Housing
- Location
- Shiwapur
- Haveli
- Pune
- 412205
- Pincode412205
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100013655
- ReraGenie IDRG-MH-26155
Builder
- NameMOHINIRAJ ASSOCIATES
- Entity typePartnership
- PartnerMAHENDRA MADHUKAR PATHAK
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on16 Oct 2017
- Promised completion30 Jun 2022
- Revised completionRevised to 30 Jun 2022 (originally 30 Dec 2020)
- Buildings3 building records
- Documents filed55 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| CITY LIGHTS WING B | NA | 12 | 0 | 0 | 0 | 0 |
| CITY LIGHTS WING A | NA | 12 | 0 | 0 | 0 | 0 |
| CITY LIGHTS WING C | NA | 12 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 19 Oct 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
23 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 20%.
CITY LIGHTS WING B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
CITY LIGHTS WING A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
CITY LIGHTS WING C30%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 1% |
| Slabs of Super Structure | 5% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities17
As on 19 Oct 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 10% |
| Open Parking | No | Not applicable |
| SWIMMING POOL | Yes | 100% |
| COMPOUND WALL | Yes | 100% |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MS SHAILESH SALEHITTAL |
| Engineer | NAVNATH LALU KALE |
| Chartered Accountant | AVGKLLP |
| Partner | Role in project |
|---|---|
| MOHINIRAJ ASSOCIATES | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWE HAVE COMPLETED OUR 2 WINGS A AND B AND HAVE RECEIVED OCCUPANCY CERTIFICATE FROM PMRDA AFTER THAT WE HAVE STARTED CONSTRUCTION OF C WING BUT DUE TO COVID19 LOCKDOWN SITE WAS SHUT DOWN AND LATER OUR SENIOR ENGINEER , PROJECT MANAGER AS WELL AS CONTRACTOR WAS DIED DUE TO COVID HENCE WE REQUIRED TIME TO RE ARRANGE THE WHOLE MANAGEMENT TO RESTART THE WORK
Complaints filed with MahaRERA15
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000011387 | Sushil Dhananjay Borkar | M/s Mohiniraj Associates | 05/04/2018 |
| CC005000000011384 | Pramod Deshpande | M/s Mohiniraj Associates | 05/04/2018 |
| CC005000000011375 | Manoj Suresh Bhosale | M/s Mohiraj Associates | 04/04/2018 |
| CC005000000011383 | Mandar Vasant Joshi | M/s Mohiniraj Associates | 05/04/2018 |
| CC005000000011385 | Atul Patil | M/s Mohiniraj Associates | 05/04/2018 |
| CC005000000011386 | Dnyanesh Marne | M/s Mohiniraj Associates | 05/04/2018 |
| CC005000000011395 | Amit Bhandari | M/s Mohiniraj Associates | 06/04/2018 |
| CC005000000011388 | Amarendra Yadwad | M/s Mohiraj Associates | 05/04/2018 |
| CC005000000011394 | Ajay Ramgol | M/s Mohiraj Associates | 06/04/2018 |
| CC005000000033601 | Mughda Mukund Divekar | M/s. Mohiniraj Associates | 14/11/2019 |
| CC005000000033603 | Deepti Shantanu Apte | M/s. Mohiniraj Associates | 14/11/2019 |
| CC005000000043649 | Manohar Gadiwan | Mohiniraj Associate | 20/11/2019 |
| CC005000000064384 | SONALI SACHIN RAUT | MOHINIRAJ ASSOCIATES THROUGH ITS PARTNER SATYAJIT GAIDHANI | 08/07/2020 |
| CC005000000106643 | Mughda Mukund Divekar | Mohiniraj Associates | 17/02/2022 |
| CC005000000259054 | Smt Mrinalini Sanjay Vidwans | M/s Mohiniraj Associates A Partnership Firm Through its Partner Mr. Suurajh Satyajeet Gaidhanii | 11/07/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Sep 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Sep 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Sep 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 20 Sep 2021
Documents filed55
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration about Commencement CertificateFile: decleration about Commencement certificate.pdf | 19 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2A 19-20.pdf | 19 Oct 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A 20-21.pdf | 19 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: disclosure of booked ,sold inventory.pdf | 19 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: form 5 17-18.pdf | 19 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 18-19.pdf | 19 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: form 5 19-20.pdf | 19 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form 5 20-21.pdf | 19 Oct 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFIATE.pdf | 11 Oct 2021 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PMRDA OCCUPATION CERTIFICATE.pdf | 20 Sep 2021 |
| Details of Restarting of Construction work post lockdownFile: cwing status.pdf | 20 Sep 2021 |
| Building plan approvalFile: Map-14-17.pdf | 29 Sep 2017 |
| Building plan approvalFile: Map-15-17.pdf | 29 Sep 2017 |
| Building plan approvalFile: Map-12-17.pdf | 29 Sep 2017 |
| Building plan approvalFile: Map-13-17.pdf | 29 Sep 2017 |
| Building plan approvalFile: Map-17-17.pdf | 29 Sep 2017 |
| Layout approvalFile: Map-01-17.pdf | 29 Sep 2017 |
| Building plan approvalFile: Map-16-17.pdf | 29 Sep 2017 |
| Building plan approvalFile: Map-01-17.pdf | 29 Sep 2017 |
| Building plan approvalFile: Map-02-17.pdf | 29 Sep 2017 |
| Building plan approvalFile: Map-03-17.pdf | 29 Sep 2017 |
| Building plan approvalFile: Map-04-17.pdf | 29 Sep 2017 |
| Building plan approvalFile: Map-05-17.pdf | 29 Sep 2017 |
| Building plan approvalFile: Map-06-17.pdf | 29 Sep 2017 |
| Building plan approvalFile: Map-07-17.pdf | 29 Sep 2017 |
| Building plan approvalFile: Map-08-17.pdf | 29 Sep 2017 |
| Building plan approvalFile: Map-09-17.pdf | 29 Sep 2017 |
| Building plan approvalFile: Map-10-17.pdf | 29 Sep 2017 |
| Building plan approvalFile: Map-11-17.pdf | 29 Sep 2017 |
| PAN CardFile: PAN CARD.pdf | 29 Sep 2017 |
| Copy of the legal title reportFile: Search and Title Report.PDF | 29 Sep 2017 |
| Details of encumbrancesFile: Self Declaration for Encumbrances.pdf | 29 Sep 2017 |
| Copy of Layout Approval (in case of layout)File: Map-01-17.pdf | 29 Sep 2017 |
| Building Plan Approval (IOD)File: Map-01-17.pdf | 29 Sep 2017 |
| Building Plan Approval (IOD)File: Map-02-17.pdf | 29 Sep 2017 |
| Building Plan Approval (IOD)File: Map-03-17.pdf | 29 Sep 2017 |
| Building Plan Approval (IOD)File: Map-04-17.pdf | 29 Sep 2017 |
| Building Plan Approval (IOD)File: Map-05-17.pdf | 29 Sep 2017 |
| Building Plan Approval (IOD)File: Map-06-17.pdf | 29 Sep 2017 |
| Building Plan Approval (IOD)File: Map-07-17.pdf | 29 Sep 2017 |
| Building Plan Approval (IOD)File: Map-08-17.pdf | 29 Sep 2017 |
| Building Plan Approval (IOD)File: Map-09-17.pdf | 29 Sep 2017 |
| Building Plan Approval (IOD)File: Map-10-17.pdf | 29 Sep 2017 |
| Building Plan Approval (IOD)File: Map-11-17.pdf | 29 Sep 2017 |
| Building Plan Approval (IOD)File: Map-12-17.pdf | 29 Sep 2017 |
| Building Plan Approval (IOD)File: Map-13-17.pdf | 29 Sep 2017 |
| Building Plan Approval (IOD)File: Map-14-17.pdf | 29 Sep 2017 |
| Building Plan Approval (IOD)File: Map-15-17.pdf | 29 Sep 2017 |
| Building Plan Approval (IOD)File: Map-16-17.pdf | 29 Sep 2017 |
| Building Plan Approval (IOD)File: Map-17-17.pdf | 29 Sep 2017 |
| Declaration in FORM BFile: Declaration Form B.pdf | 29 Sep 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_Final.pdf | 29 Sep 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer's Certificate.pdf | 29 Sep 2017 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 29 Sep 2017 |
| Proforma of Allotment letterFile: Draft Agreement.pdf | 29 Sep 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 55 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep CITY LIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Shiwapur13,700+ in Pune
Filed coordinates, straight-line distance. 6 registered projects within 2 km.
Balaji Dham Phase-1
Garva Land Deal Private Limited
Royal Purandar
CARCANET INFRAPROJECTS PVT LTD
Athashri Ananda
ANANDA SENIOR LIVING PVT. LTD.
MADHUSPARSHA
MADHUKAR NAMDEV MOHITE
Vitthal Residency
Venkatesh Enterprises
NAVKAR PLEASURE
PARAG PROPERTIES
Builder: MOHINIRAJ ASSOCIATES
MOHINIRAJ ASSOCIATES has 1 registration on MahaRERA, including CITY LIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that CITY LIGHTS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if CITY LIGHTS is delayed beyond 30 Jun 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CITY LIGHTS?
The registered promoter entity is MOHINIRAJ ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CITY LIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against CITY LIGHTS?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for CITY LIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CITY LIGHTS?
The professionals named in the filing: Architect: MS SHAILESH SALEHITTAL; Engineer: NAVNATH LALU KALE; Chartered Accountant: AVGKLLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CITY LIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback