MADHUSPARSHA
RG-MH-12268 · RERA P52100013085 · Last updated on MahaRERA portal: 10 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 46 months past the filed date
- Completion date moved by 18 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MADHUSPARSHA is a Residential / Group Housing project by MADHUKAR NAMDEV MOHITE in Pune, Maharashtra, registered with MahaRERA as P52100013085 on 14 Sep 2017. Possession was promised by 30 Dec 2022 and is now 46 months past that date. The completion date has moved by 18 months from the original filing. 1 of the 56 units on this registration are recorded sold or booked, and 17 of 22 construction stages are filed complete.
At a glance
Project
- NameMADHUSPARSHA
- TypeResidential / Group Housing
- Location
- 0
- Khed-Shivapur
- Haveli
- Pune
- 412205
- Pincode412205
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100013085
- ReraGenie IDRG-MH-12268
Builder
- NameMADHUKAR NAMDEV MOHITE
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on14 Sep 2017
- Promised completion30 Dec 2022
- Revised completionRevised to 30 Dec 2022 (originally 30 Jun 2021)
- Buildings2 building records
- Documents filed102 files
Current status
Figures as on 10 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MADHUSPARSHA A WING | NA | 6 | 4 | 24 | 0 | 24 |
| MADHUSPARSHA B WING | NA | 6 | 4 | 32 | 0 | 32 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 10 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
17 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 75%.
MADHUSPARSHA A WING86%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
MADHUSPARSHA B WING86%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
Progress on shared amenities15
As on 10 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 30% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SUDHIR ANNASAHEB PAWAR | Khed-Shivapur | Pune |
| RAMDAS SADASHIV VAVAL | Khed-Shivapur | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | S D WALHEKAR |
| Architect | A A STUDIO ARCHITECTS |
| Engineer | Prasad Pandurang Ugale |
| Engineer | Ajinkya U Mohite |
| Chartered Accountant | Ajay Lokhande & Associates |
| Chartered Accountant | Pratik Jain |
| Chartered Accountant | Dilip B Kurade |
| Partner | Role in project |
|---|---|
| MADHUKAR NAMDEV MOHITE | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDUE TO COVID 19 PROJECT WORK IS DELAYED ....REQUIRED SOME TIME TO COMPLETE THE PROJECT
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Sep 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Sep 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Sep 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Sep 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed102
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2021-2022)File: Form 2A - March 22.pdf | 10 Jan 2026 |
| Form 2A (FY 2022-2023)File: Form 2A - March 23.pdf | 10 Jan 2026 |
| Form 2A (FY 2020-2021)File: Form 2A - March 21.pdf | 10 Jan 2026 |
| Form 1File: 1 AR- March 19.pdf | 5 Jan 2026 |
| Form 2File: 1 ER - March 19.pdf | 5 Jan 2026 |
| Form 3File: 1 CA - March 19.pdf | 5 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 19.pdf | 5 Jan 2026 |
| Form 1File: 1 AR- March 19.pdf | 5 Jan 2026 |
| Form 2File: 1 ER - March 19.pdf | 5 Jan 2026 |
| Form 3File: 1 CA - March 19.pdf | 5 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 19.pdf | 5 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 19.pdf | 5 Jan 2026 |
| Form 3File: 1 CA - March 19.pdf | 5 Jan 2026 |
| Form 2File: 1 ER - March 19.pdf | 5 Jan 2026 |
| Form 1File: 1 AR- March 19.pdf | 5 Jan 2026 |
| Form 1File: 1 AR- March 19.pdf | 5 Jan 2026 |
| Form 2File: 1 ER - March 19.pdf | 5 Jan 2026 |
| Form 3File: 1 CA - March 19.pdf | 5 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 19.pdf | 5 Jan 2026 |
| Form 1File: 2 AR - March 20.pdf | 5 Jan 2026 |
| Form 2File: 2 ER - March 20.pdf | 5 Jan 2026 |
| Form 3File: 2 CA - March 20.pdf | 5 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 20.pdf | 5 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 20.pdf | 5 Jan 2026 |
| Form 1File: 2 AR - March 20.pdf | 5 Jan 2026 |
| Form 2File: 2 ER - March 20.pdf | 5 Jan 2026 |
| Form 3File: 2 CA - March 20.pdf | 5 Jan 2026 |
| Form 1File: 2 AR - March 20.pdf | 5 Jan 2026 |
| Form 2File: 2 ER - March 20.pdf | 5 Jan 2026 |
| Form 3File: 2 CA - March 20.pdf | 5 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 20.pdf | 5 Jan 2026 |
| Form 1File: 2 AR - March 20.pdf | 5 Jan 2026 |
| Form 2File: 2 ER - March 20.pdf | 5 Jan 2026 |
| Form 3File: 2 CA - March 20.pdf | 5 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 20.pdf | 5 Jan 2026 |
| Form 1File: 3 AR - March 21.pdf | 5 Jan 2026 |
| Form 2File: 3 ER - March 21.pdf | 5 Jan 2026 |
| Form 3File: 3 CA - March 21.pdf | 5 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 21.pdf | 5 Jan 2026 |
| Form 1File: 3 AR - March 21.pdf | 5 Jan 2026 |
| Form 2File: 3 ER - March 21.pdf | 5 Jan 2026 |
| Form 3File: 3 CA - March 21.pdf | 5 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 21.pdf | 5 Jan 2026 |
| Form 1File: 3 AR - March 21.pdf | 5 Jan 2026 |
| Form 2File: 3 ER - March 21.pdf | 5 Jan 2026 |
| Form 3File: 3 CA - March 21.pdf | 5 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 21.pdf | 5 Jan 2026 |
| Form 1File: 3 AR - March 21.pdf | 5 Jan 2026 |
| Form 2File: 3 ER - March 21.pdf | 5 Jan 2026 |
| Form 3File: 3 CA - March 21.pdf | 5 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 21.pdf | 5 Jan 2026 |
| Form 1File: 4 AR - March 22.pdf | 5 Jan 2026 |
| Form 2File: 4 ER - March 22.pdf | 5 Jan 2026 |
| Form 3File: 4 CA - March 22.pdf | 5 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 22.pdf | 5 Jan 2026 |
| Form 1File: 4 AR - March 22.pdf | 5 Jan 2026 |
| Form 2File: 4 ER - March 22.pdf | 5 Jan 2026 |
| Form 3File: 4 CA - March 22.pdf | 5 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 22.pdf | 5 Jan 2026 |
| Form 1File: 4 AR - March 22.pdf | 5 Jan 2026 |
| Form 2File: 4 ER - March 22.pdf | 5 Jan 2026 |
| Form 3File: 4 CA - March 22.pdf | 5 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 22.pdf | 5 Jan 2026 |
| Form 1File: 4 AR - March 22.pdf | 5 Jan 2026 |
| Form 2File: 4 ER - March 22.pdf | 5 Jan 2026 |
| Form 3File: 4 CA - March 22.pdf | 5 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - March 22.pdf | 5 Jan 2026 |
| Form 1File: 5 AR - june 22.pdf | 5 Jan 2026 |
| Form 2File: 5 ER - June 22.pdf | 5 Jan 2026 |
| Form 3File: 5 CA - June 22.pdf | 5 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - June 22.pdf | 5 Jan 2026 |
| Form 1File: 6 AR - sept 22.pdf | 5 Jan 2026 |
| Form 2File: 6 ER - sept 22.pdf | 5 Jan 2026 |
| Form 3File: 6 CA - sept 22.pdf | 5 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - Sep 22 .pdf | 5 Jan 2026 |
| Form 1File: 7 AR dec 22.pdf | 5 Jan 2026 |
| Form 2File: 7 ER - Dec 22.pdf | 5 Jan 2026 |
| Form 3File: 7 CA - Dec 22_compressed.pdf | 5 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Dec 22.pdf | 5 Jan 2026 |
| Form 5 (FY 2022-2023)File: RERA audit report final.pdf | 5 Jan 2026 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 102 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MADHUSPARSHA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Khed-Shivapur13,700+ in Pune
Filed coordinates, straight-line distance. 4 registered projects within 2 km.
Balaji Dham Phase-1
Garva Land Deal Private Limited
Royal Purandar
CARCANET INFRAPROJECTS PVT LTD
Athashri Ananda
ANANDA SENIOR LIVING PVT. LTD.
Vitthal Residency
Venkatesh Enterprises
NAVKAR PLEASURE
PARAG PROPERTIES
ROYAL PURANDAR
CARCANET INFRA PROJECTS PRIVATE LIMITED
Builder: MADHUKAR NAMDEV MOHITE
MADHUKAR NAMDEV MOHITE has 1 registration on MahaRERA, including MADHUSPARSHA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that MADHUSPARSHA shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if MADHUSPARSHA is delayed beyond 30 Dec 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MADHUSPARSHA?
The registered promoter entity is MADHUKAR NAMDEV MOHITE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MADHUSPARSHA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MADHUSPARSHA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MADHUSPARSHA?
The professionals named in the filing: Architect: S D WALHEKAR; Architect: A A STUDIO ARCHITECTS; Engineer: Prasad Pandurang Ugale; Engineer: Ajinkya U Mohite; Chartered Accountant: Ajay Lokhande & Associates; Chartered Accountant: Pratik Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MADHUSPARSHA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback