ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / CHOUHAN LANDMARK

Registered No litigation declared Residential / Group Housing project

CHOUHAN LANDMARK

By Chouhan Builders India HSG Development Pvt Ltd

RG-MH-97420 · RERA P51800048925 · Last updated on MahaRERA portal: 29 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 23 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Nov 2027Possession promisedmoved 23 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 95%
30 of 34Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

CHOUHAN LANDMARK is a Residential / Group Housing project by Chouhan Builders India HSG Development Pvt Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800048925 on 24 Jan 2023. Possession is promised by 30 Nov 2027. The completion date has moved by 23 months from the original filing. 4 of the 34 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameCHOUHAN LANDMARK
  • TypeResidential / Group Housing
  • Location
    • KEONI GAOTHAN ROAD
    • ANDHERI WEST
    • Andheri
    • Mumbai Suburban
    • 400058
  • Pincode400058
  • RERA no.P51800048925
  • ReraGenie IDRG-MH-97420

Builder

  • NameChouhan Builders India HSG Development Pvt Ltd
  • Entity typeCompany
  • CINU45200MH2002PTC137325
  • Managing DirectorSajid Ali Chouhan
  • DirectorsABIDALI YUNUS CHOUHAN, MAJIDALI YUNUS CHOUHAN, MOHAMED YUNUS FAKIR CHOUHAN
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2023First promiseDec 2025Revised toNov 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Jan 2023
  • Promised completion30 Nov 2027
  • Revised completionRevised to 30 Nov 2027 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed68 files

Current status

12%4 of 34 units booked
40.9%Work done, per cost certificate

Figures as on 29 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CHOUHAN LANDMARKNA131234034

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.

CHOUHAN LANDMARK: 37% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Closed/Covered20

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area682 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Aug 2025
LandownerVillageDistrict
SAJID ALI CHOUHANAndheriMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI3039.27
Proposed, not sanctioned1,200 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchANDHERI WEST
Estimated costRs 9.60 cr
Cost incurredRs 3.93 cr
Work done40.89%
BuildingWingEstimatedIncurred
CHOUHAN LANDMARKNARs 9.60 crRs 3.93 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUYOG SHET
EngineerSorab Alam
Engineerunistep consulting
Chartered AccountantNEHALI AND CO
PartnerRole in project
Chouhan Builders India HSG Development Pvt Ltd-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA13102518093Dec 2025 → Nov 2027

Reason as filed by the promoterI am writing to formally request an extension for for Chauhan Landmark RERA Registration No P51800048925 as the ongoing processes related to Transfer of Development Rights (TDR) acquisition, Development Rights Certificate (DRC) issuance, and Commencement Certificate (CC) approval Despite consistent follow-up and timely submissions, these approvals are taking longer due to procedural formalities and coordination among various departments. We are actively pursuing all required steps and remain committed to fulfiling all statutory and regulatory obligations In light of the above, we kindly reques

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2027

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: form 2A engineer Quality certificate.pdf29 Jul 2026
Withdrawal Update Form 1File: ARCHITECT 1.pdf14 Jul 2026
Withdrawal Update Form 2File: E G 2.pdf14 Jul 2026
Withdrawal Update Form 3File: C A C1.pdf14 Jul 2026
Withdrawal Update Form 1File: form 1.pdf25 Apr 2026
Withdrawal Update Form 2File: form 2.pdf25 Apr 2026
Withdrawal Update Form 3File: form 3.pdf25 Apr 2026
Withdrawal Update Form 1File: ARCHOTECT CERTIFICATE FORM 1 DEC QUARTER 20260108_13555777.pdf16 Jan 2026
Withdrawal Update Form 2File: FORM 2 YEARLY ENGINEER CERTIFICATE 20260108_14031156.pdf16 Jan 2026
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE 20260108_14042665.pdf16 Jan 2026
Withdrawal Update Form 1File: form 1 sep 25.pdf3 Nov 2025
Withdrawal Update Form 2File: form 2 sep 25.pdf3 Nov 2025
Withdrawal Update Form 3File: ca form 3 final.pdf3 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf25 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf10 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A 23-24.pdf10 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 - PDF.pdf29 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf17 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A 23-24.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf5 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf5 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A 23-24.pdf5 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf5 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 03 24.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf24 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf24 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf24 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sep'23.pdf28 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - March'23.pdf28 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sep'23.pdf28 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 - mar 23.pdf28 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - sep 23.pdf28 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - 22-23.pdf28 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate PDF FORM 1.pdf15 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate PDF FORM 2.pdf15 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance certificate PDF FORM 2A 22-23.pdf15 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chartered account certificate PDF FORM 3.pdf15 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf11 May 2023
Proforma of Agreement for saleFile: chouhan agreement.pdf18 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure 1_merged.pdf17 Jan 2023
Copy of the legal title reportFile: Title Certificate - Chouhan Builders - CTS 543A (1).pdf13 Jan 2023
Details of encumbrances concerned to FinanceFile: 2.pdf13 Jan 2023
Details of encumbrances concerned to LegalFile: 2.pdf13 Jan 2023
Deviation Report with respect to model copy of AgreementFile: 3 (1).pdf13 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1_merged.pdf18 Oct 2022
Layout approvalFile: P1.pdf4 Oct 2022
Layout approvalFile: P2.pdf4 Oct 2022
Layout approvalFile: P3.pdf4 Oct 2022
Copy of Layout Approval (in case of layout)File: P1.pdf4 Oct 2022
Copy of Layout Approval (in case of layout)File: P2.pdf4 Oct 2022
Copy of Layout Approval (in case of layout)File: P3.pdf4 Oct 2022
Declaration about Commencement CertificateFile: CC DECLARTION.pdf30 Sep 2022
Declaration in FORM BFile: FORM B.pdf30 Sep 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf30 Sep 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK LETTER.pdf30 Sep 2022
Deviation Report with respect to Allotment letterFile: DEVIATION OF ALLOTMENT.pdf30 Sep 2022
Building plan approvalFile: 2305580_IOD_signed.pdf21 Sep 2022
PAN CardFile: 1 PAN Card.pdf21 Sep 2022
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE.pdf21 Sep 2022
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE.pdf21 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: 2305580_IOD_signed.pdf21 Sep 2022
Commencement Certificates / NA Order for plotted developmentFile: 2327781_FirstCC_signed.pdf21 Sep 2022
CERSAI detailsFile: CERSAI DECLARTION.pdf21 Sep 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Chouhan GalaxyChouhan Galaxy Mira Bhayander Road Mira Road48CompletedJan 2018Late, Jan 2019

How this compares with Mumbai Suburban

12%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 23 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CHOUHAN LANDMARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ANDHERI WEST6,700+ in Mumbai Suburban

Builder: Chouhan Builders India HSG Development Pvt Ltd

Chouhan Builders India HSG Development Pvt Ltd has 1 registration on MahaRERA, including CHOUHAN LANDMARK. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if CHOUHAN LANDMARK is delayed beyond 30 Nov 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CHOUHAN LANDMARK?

The registered promoter entity is Chouhan Builders India HSG Development Pvt Ltd, a company as per the filing. Its CIN U45200MH2002PTC137325 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CHOUHAN LANDMARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CHOUHAN LANDMARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CHOUHAN LANDMARK?

The professionals named in the filing: Architect: SUYOG SHET; Engineer: Sorab Alam; Engineer: unistep consulting; Chartered Accountant: NEHALI AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CHOUHAN LANDMARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CHOUHAN LANDMARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CHOUHAN LANDMARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.