Home / Browse projects / Thane, Maharashtra / CHINTAMANI MEADOWS
CHINTAMANI MEADOWS
By JASHNANI CONSTRUCTION PRIVATE LIMITED
RG-MH-28044 · RERA P51700024889 · Last updated on MahaRERA portal: 21 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CHINTAMANI MEADOWS is a Others project by JASHNANI CONSTRUCTION PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700024889 on 9 Mar 2020. Possession is promised by 30 Dec 2026. The completion date has moved by 12 months from the original filing. 132 of the 146 units on this registration are recorded sold or booked, and 31 of 44 construction stages are filed complete.
At a glance
Project
- NameCHINTAMANI MEADOWS
- TypeOthers
- Location
- BEHIND CHINTAMANI RESIDENCY
- SHAHAPUR
- Shahapur (CT)
- Thane
- 421601
- Pincode421601
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700024889
- ReraGenie IDRG-MH-28044
Builder
- NameJASHNANI CONSTRUCTION PRIVATE LIMITED
- Entity typeCompany
- CINU45200MH2004PTC144798
- GSTIN27AABCJ4351P1Z7
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- Managing DirectorsSHIVKUMAR PAHLAJRAI JASHNANI, VISHAL ANIL JASHNANI, AMIT LAKHMICHAND JASHNANI, SHIVKUMAR PAHILAJRAI JASHNANI
- ChairpersonLAKHIMICHAND JADHAVDAS JASHNANI
- Other registrations8 more →
- Completed8 of 9
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Mar 2020
- Promised completion30 Dec 2026
- Revised completionRevised to 30 Dec 2026 (originally 30 Dec 2025)
- Buildings4 building records
- Documents filed277 files
Current status
Figures as on 21 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| CHINTAMANI MEADOWS BUILDING NO 3 WINGS A B C | NA | 5 | 0 | 37 | 7 | 44 |
| CHINTAMANI MEADOWS BUILDING NO 4 WINGS A B C | NA | 5 | 5 | 26 | 9 | 35 |
| CHINTAMANI MEADOWS BUILDING NO 5 WINGS A B | NA | 5 | 5 | 39 | 8 | 47 |
| CHINTAMANI MEADOWS BUILDING NO 7 | NA | 5 | 5 | 20 | 0 | 20 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 21 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
31 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 80%.
CHINTAMANI MEADOWS BUILDING NO 3 WINGS A B C82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
CHINTAMANI MEADOWS BUILDING NO 4 WINGS A B C82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
CHINTAMANI MEADOWS BUILDING NO 5 WINGS A B56%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
CHINTAMANI MEADOWS BUILDING NO 782%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 21 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 95% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 90% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | Yes | 95% |
| Open Parking | Yes | 95% |
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Manjula S Wargade,Vilas S wargade, Ravindra S Warg | Shahapur (CT) | Thane |
| ROOPALI RAJESH SHELAVALE | Shahapur (CT) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| CHINTAMANI MEADOWS BUILDING NO 5 WINGS A B | NA | Rs 8.31 cr | Rs 7.06 cr |
| CHINTAMANI MEADOWS BUILDING NO 4 WINGS A B C | NA | Rs 6.17 cr | Rs 6.17 cr |
| CHINTAMANI MEADOWS BUILDING NO 3 WINGS A B C | NA | Rs 5.79 cr | Rs 5.79 cr |
| CHINTAMANI MEADOWS BUILDING NO 7 | NA | Rs 4.48 cr | Rs 4.48 cr |
| - | NA | Rs 1.52 cr | Rs 1.44 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KARANJALI ARCH |
| Engineer | TALREJA AND ASSOCIATES |
| Engineer | ANILKUMAR C SHINDE |
| Chartered Accountant | BALANI & ASSOCIATES |
| Chartered Accountant | NOTNANI & ASSOCIATES |
| Chartered Accountant | Mukesh Nanikram Kishnani |
| Chartered Accountant | Hitesh Vijay Chawla |
| Partner | Role in project |
|---|---|
| JASHNANI CONSTRUCTION PRIVATE LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWE DIRECTORS OF “JASHNANI CONSTRUCTION PRIVATE LIMITED”, OFFICE AT “S.No.31/A, 35/3, 107/1, 109/2A, 109/3A, 116/1A, Savroli Road, Shahapur Thane MH 421601”. HEREBY DECLARE THAT WE ARE INCREASING THE FLOORS OF BUILDING NO 5 & 7 FROM 4 FLOORS TO 7 FLOORS OF CHINTAMANI MEADOWS (RERA NO P51700024889). WE ARE UPLOADING THE REVISED PLANS & REVISED CC. THE PROPOSED DATE OF PROJECT CHINTAMANI MEADOWS (RERA NO P51700024889) IS 30/12/2026.
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 93/2021/2021 | SHAHAPUR JR DIVISON | FILED |
| 5/2017/2017 | SDO BHIWANDI | APPEAL DISMISED |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Feb 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Jun 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Jun 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 6 Jan 2025
Documents filed277
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 277 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: FORM 2A - MEADOWS FY 25-26.pdf | 21 Aug 2026 |
| Withdrawal Update Form 1File: FORM 1 CM.pdf | 19 Aug 2026 |
| Withdrawal Update Form 2File: FORM 2 CM (1).pdf | 19 Aug 2026 |
| Withdrawal Update Form 3File: Signed Form 3 CA Certificate.pdf | 19 Aug 2026 |
| Withdrawal Update Form 1File: CM FORM 1 Signed.pdf | 18 Apr 2026 |
| Withdrawal Update Form 2File: CM FORM 2 Signed.pdf | 18 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 Signed_compressed.pdf | 18 Apr 2026 |
| Withdrawal Update Form 1File: CM FORM 1.pdf | 16 Jan 2026 |
| Withdrawal Update Form 2File: CM FORM 2.pdf | 16 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Signed.pdf | 16 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 CM.pdf | 7 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 CM.pdf | 7 Oct 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 7 Oct 2025 |
| Form 1File: FORM 1 CM.pdf | 6 Oct 2025 |
| Form 2File: FORM 2 CM.pdf | 6 Oct 2025 |
| Form 3File: FORM 3 CM.pdf | 6 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY CM.pdf | 6 Oct 2025 |
| OthersFile: FORM 2A CM.pdf | 6 Oct 2025 |
| Withdrawal Update Form 1File: FORM 1 CM.pdf | 5 Oct 2025 |
| Withdrawal Update Form 1File: FORM 1 CM.pdf | 5 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 CM.pdf | 5 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2 CM.pdf | 5 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 -Signed_Comp.pdf | 5 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 -Signed_Comp.pdf | 5 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Cm.pdf | 29 Sep 2025 |
| Form 2A (FY 2024-2025)File: ilovepdf_merged (7).pdf | 18 Sep 2025 |
| Withdrawal Update Form 1File: FORM 1 CM.pdf | 20 Jul 2025 |
| Withdrawal Update Form 2File: FORM 2 CM.pdf | 20 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 -Signed_Comp.pdf | 20 Jul 2025 |
| Withdrawal Update Form 1File: FORM 1 CM.pdf | 19 Jul 2025 |
| Withdrawal Update Form 1File: FORM 1 CM.pdf | 19 Jul 2025 |
| Withdrawal Update Form 2File: FORM 2 CM.pdf | 19 Jul 2025 |
| Withdrawal Update Form 2File: FORM 2 CM.pdf | 19 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 -Signed_Comp.pdf | 19 Jul 2025 |
| Withdrawal Update Form 3File: Form 3 -Signed_Comp.pdf | 19 Jul 2025 |
| Form 1File: MEADOWS FORM 1.pdf | 9 Jul 2025 |
| Form 2File: MEADOWS FORM 2.pdf | 9 Jul 2025 |
| Form 3File: MEADOWS FORM 3.pdf | 9 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: MEADOWS INVENTORY 30-09-2021_20211005_125756.pdf | 9 Jul 2025 |
| OthersFile: MEADOWS FORM 2A.pdf | 9 Jul 2025 |
| Form 1File: FORM 1 MEADOWS.pdf | 9 Jul 2025 |
| Form 2File: FORM 2 MEADOWS.pdf | 9 Jul 2025 |
| Form 3File: FORM 3 MEADOWS.pdf | 9 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY MEADOWS.pdf | 9 Jul 2025 |
| OthersFile: FORM 2A MEADOWS.pdf | 9 Jul 2025 |
| Form 1File: FORM 1 MEADOWS.pdf | 9 Jul 2025 |
| Form 2File: FORM 2 MEADOWS.pdf | 9 Jul 2025 |
| Form 3File: FORM 3 MEADOWSS.pdf | 9 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: 31-03-2022 INVENTORY MEADOWS.pdf | 9 Jul 2025 |
| OthersFile: ilovepdf_merged (1).pdf | 9 Jul 2025 |
| Form 1File: FORM 1 MEADOWS_compressed (1).pdf | 9 Jul 2025 |
| Form 2File: FORM 2 MEADOWS_compressed.pdf | 9 Jul 2025 |
| Form 3File: FORM 3 MEADOWS_compressed (2).pdf | 9 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY MEADOWS BUILDING 3 - 4_compressed.pdf | 9 Jul 2025 |
| OthersFile: ilovepdf_merged (2).pdf | 9 Jul 2025 |
| Form 1File: CM FORM 1.pdf | 9 Jul 2025 |
| Form 2File: CM FORM 2.pdf | 9 Jul 2025 |
| Form 3File: CM FORM 3.pdf | 9 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: CM INVENTORY.pdf | 9 Jul 2025 |
| OthersFile: CM 3 FORM 2A_merged.pdf | 9 Jul 2025 |
| Form 1File: FORM 1 MEADOWS.pdf | 9 Jul 2025 |
| Form 2File: FORM 2 MEADOWS.pdf | 9 Jul 2025 |
| Form 3File: FORM 3 MEADOWS.pdf | 9 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: MEADOWS INVENTORY.pdf | 9 Jul 2025 |
| OthersFile: ilovepdf_merged (3).pdf | 9 Jul 2025 |
| Form 1File: FORM 1 MEADOWS.pdf | 9 Jul 2025 |
| Form 2File: FORM 2 MEADOWS.pdf | 9 Jul 2025 |
| Form 3File: FORM 3 MEADOWS.pdf | 9 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY MEADOWS.pdf | 9 Jul 2025 |
| OthersFile: ilovepdf_merged (4).pdf | 9 Jul 2025 |
| Form 1File: FORM 1 MEADOWS.pdf | 9 Jul 2025 |
| Form 2File: FORM 2 MEADOWS.pdf | 9 Jul 2025 |
| Form 3File: FORM 3 MEADOWS.pdf | 9 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY MEADOWS.pdf | 9 Jul 2025 |
| OthersFile: FORM 1 MEADOWS_merged.pdf | 9 Jul 2025 |
| Form 1File: FORM 1 MEADOWS.pdf | 9 Jul 2025 |
| Form 2File: FORM 2 MEADOWS.pdf | 9 Jul 2025 |
| Form 3File: FORM 3 MEADOWS.pdf | 9 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY MEADOWS.pdf | 9 Jul 2025 |
| OthersFile: ilovepdf_merged (5).pdf | 9 Jul 2025 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| CHINTAMANI RESIDENCY | BEHIND JAN KALYAN SCHOOL SHAHPUR | 93 | Completed | Dec 2013 | Aug 2013 |
| CHINTAMANI AANGAN | GONE NAGAR SHAHPUR | 24 | Completed | Dec 2013 | Aug 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 277 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep CHINTAMANI MEADOWS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SHAHAPUR7,600+ in Thane
Filed coordinates, straight-line distance. 56 registered projects within 2 km.
BELLA VISTA PHASE 8
INDO ASIAN BUILDCON PVT LTD
RUSTOMJEE BELLE VUE
KEYSTONE REALTORS LIMITED
THE VENISCAPE
MIVAAN BUILDCON PRIVATE LIMITED
VISION SKY WORLD
M/S VISION SKY WORLD
Sunteck FORESTWorld 1
SUNTECK REALTY HOLDINGS PVT LTD
Sunteck FORESTWorld 2
SUNTECK REALTY HOLDINGS PVT LTD
See every Thane project, with the district possession charts
Builder: JASHNANI CONSTRUCTION PRIVATE LIMITED
JASHNANI CONSTRUCTION PRIVATE LIMITED has 9 registrations on MahaRERA, including CHINTAMANI HABITAT DAFFODILS TYPE F and CHINTAMANI HABITAT DAFFODILS TYPE G - E. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if CHINTAMANI MEADOWS is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CHINTAMANI MEADOWS?
The registered promoter entity is JASHNANI CONSTRUCTION PRIVATE LIMITED, a company as per the filing. Its CIN U45200MH2004PTC144798 and GSTIN 27AABCJ4351P1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CHINTAMANI MEADOWS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for CHINTAMANI MEADOWS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CHINTAMANI MEADOWS?
The professionals named in the filing: Architect: KARANJALI ARCH; Engineer: TALREJA AND ASSOCIATES; Engineer: ANILKUMAR C SHINDE; Chartered Accountant: BALANI & ASSOCIATES; Chartered Accountant: NOTNANI & ASSOCIATES; Chartered Accountant: Mukesh Nanikram Kishnani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CHINTAMANI MEADOWS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback