Red flags

  • Allotment letter deviates from the model form

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • All 2 earlier projects delivered on promise
Jump to the 4 documents Report an error

CHINTAMANI HABITAT (FORTUNA BUNGALOW) is a Residential / Group Housing project by JASHNANI CONSTRUCTIONS PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as PR1330002601537 on 13 Aug 2026. Possession is promised by 31 Dec 2029.

At a glance

Project

  • NameCHINTAMANI HABITAT (FORTUNA BUNGALOW)
  • TypeResidential / Group Housing
  • Location
    • Shahpur
    • Shahapur (CT)
    • Shahapur
    • Thane
    • 421601
  • Pincode421601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1330002601537
  • ReraGenie IDRG-MH-77364

Builder

  • NameJASHNANI CONSTRUCTIONS PRIVATE LIMITED
  • Entity typeCompany
  • GSTIN27AABCJ4351P1Z7
  • Track record2 past projects →

Key dates

todayRegisteredAug 2026PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Aug 2026
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings5 building records
  • Documents filed4 files

Current status

0%0 of 5 units booked

Figures as on 1 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CHINTAMANI HABITAT (FORTUNA BUNGALOW-3)NA22101
CHINTAMANI HABITAT (FORTUNA BUNGALOW-4)NA22101
CHINTAMANI HABITAT (FORTUNA BUNGALOW-5)NA22101
CHINTAMANI HABITAT (FORTUNA BUNGALOW-6)NA22101
CHINTAMANI HABITAT (FORTUNA BUNGALOW-7)NA22101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 1 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing.

CHINTAMANI HABITAT (FORTUNA BUNGALOW-3)6%
ActivityProgress
Excavation50%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
CHINTAMANI HABITAT (FORTUNA BUNGALOW-4)6%
ActivityProgress
Excavation50%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
CHINTAMANI HABITAT (FORTUNA BUNGALOW-5)6%
ActivityProgress
Excavation50%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
CHINTAMANI HABITAT (FORTUNA BUNGALOW-6)6%
ActivityProgress
Excavation50%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
CHINTAMANI HABITAT (FORTUNA BUNGALOW-7)6%
ActivityProgress
Excavation50%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt FloorNot applicable
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo100%
Street LightingNo0%
Community BuildingsNo100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNo100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed34

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots34
Stilt / Ground34
BuildingStilt / GroundTotal
CHINTAMANI HABITAT (FORTUNA BUNGALOW-3)77
CHINTAMANI HABITAT (FORTUNA BUNGALOW-4)77
CHINTAMANI HABITAT (FORTUNA BUNGALOW-5)77
CHINTAMANI HABITAT (FORTUNA BUNGALOW-6)77
CHINTAMANI HABITAT (FORTUNA BUNGALOW-7)66

Land and ownership

Land area598 sq m
Promoter owns the landYes
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Apr 2026

Approvals and building plan

Permissible FSI598.3
Proposed, not sanctioned598 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shree Narayan CHS Ltd, Ground Floor, Shop No. 1,2,3, Gala No. 20 and Flat No. 004, Shahapur Asangaon Road, Opp. Civil Court new Building, Shahapur, Maharashtra.421601

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAJ & ASSOCIATES
EngineerPRAPTI ASSOCIATE CONSULTING ENGINEER
Chartered AccountantNOTNANI & ASSOCIATES
PartnerRole in project
JASHNANI CONSTRUCTION PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

Documents filed4

As listed on the registration. The files themselves are on the MahaRERA portal.

DocumentUploaded
Clear Layout1 May 2026
Clear Layout1 May 2026
Annexure_A1 Apr 2026
NA Order1 Apr 2026

Promoter's earlier projects2

As disclosed by the promoter in this filing.

2 delivered on promise
ProjectStatusPromisedDeliveredLitigation
CHINTAMANI RESIDENCYCompletedDec 2013Aug 2013No
CHINTAMANI AANGANCompletedDec 2013Aug 2013No

How this compares with Thane

0%of this project is bookeddistrict median 27%
23%of Thane projects moved their completion datethis one has not
24%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,552 Thane projects on ReraGenie, from their own filings.

Track CHINTAMANI HABITAT (FORTUNA BUNGALOW)

Save this project to your account and get an email when its filing changes: status, dates, complaints, new documents. Free during the pilot beta.

How alerts work

Other projects near Shahpur7,552 in Thane

Builder: JASHNANI CONSTRUCTIONS PRIVATE LIMITED

JASHNANI CONSTRUCTIONS PRIVATE LIMITED has 2 registrations on MahaRERA, including CHINTAMANI HEIGHTZ and CHINTAMANI HABITAT (FORTUNA BUNGALOW). Its filings disclose 2 earlier MahaRERA projects: 2 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if CHINTAMANI HABITAT (FORTUNA BUNGALOW) is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CHINTAMANI HABITAT (FORTUNA BUNGALOW)?

The registered promoter entity is JASHNANI CONSTRUCTIONS PRIVATE LIMITED, a company as per the filing. Its GSTIN 27AABCJ4351P1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CHINTAMANI HABITAT (FORTUNA BUNGALOW)?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CHINTAMANI HABITAT (FORTUNA BUNGALOW)?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CHINTAMANI HABITAT (FORTUNA BUNGALOW)?

The professionals named in the filing: Architect: RAJ & ASSOCIATES; Engineer: PRAPTI ASSOCIATE CONSULTING ENGINEER; Chartered Accountant: NOTNANI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CHINTAMANI HABITAT (FORTUNA BUNGALOW)?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Planning to buy here? The Rs 499 buyer report adds red flags, the progress-versus-promise read, this promoter's other registrations and what the filed documents say, plus a ZIP of every document on the filing. It includes the Rs 299 project watch free for 90 days: an email in plain words every time this project's filing changes. See a real sample report before you buy. Get the buyer report · Rs 499
Studying this micro-market? The developer project analysis maps every registration within 5 km of this project from filed coordinates, reads what the market absorbs and what competes, prices the parcel, and takes the promoter's whole book apart, facts with their N, never a verdict. See a complete sample first. Get the developer analysis · Rs 2,999

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CHINTAMANI HABITAT (FORTUNA BUNGALOW). Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.