Home / Browse projects / Nagpur, Maharashtra / Chawda Industrial and Logistic Park

Registered No litigation declared Plotted project

Chawda Industrial and Logistic Park

By Raunak Yogesh Chawda

RG-MH-88504 · RERA P50500055798 · Last updated on MahaRERA portal: 20 Feb 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
30 of 30Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

Chawda Industrial and Logistic Park is a Plotted project by Raunak Yogesh Chawda in Nagpur, Maharashtra, registered with MahaRERA as P50500055798 on 22 Apr 2024. Possession is promised by 31 Dec 2026. 0 of the 30 units on this registration are recorded sold or booked.

At a glance

Project

  • NameChawda Industrial and Logistic Park
  • TypePlotted
  • Location
    • Kh No 91/3
    • 92/4
    • 92/5 and 70
    • Mouza - Dhargaon
    • Kamptee
    • nagpur
    • Dhargaon Kamptee ROad Nagpur
    • Dhargaon
    • Kamptee
    • Nagpur
    • 441924
  • Pincode441924
  • RERA no.P50500055798
  • ReraGenie IDRG-MH-88504

Builder

  • NameRaunak Yogesh Chawda
  • Entity typeIndividual

Key dates

this monthRegisteredApr 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Apr 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed66 files

Current status

0%0 of 30 units booked
94.4%Work done, per cost certificate

Figures as on 20 Feb 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 20 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes25%
Street LightingYes25%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes50%
Energy managemcntYes25%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes25%
Aggregate area of recreational Open SpaceYes25%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area36,661 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jun 2025

Approvals and building plan

Sanctioning authorityRaunak Yogesh Chawda

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGandhi Grain MArket Road, Old Badganj Layout, Chapru Square Chowk, CA Road, Nagpur
Estimated costRs 10.77 cr
Cost incurredRs 10.16 cr
Work done94.4%
BuildingWingEstimatedIncurred
-NARs 10.77 crRs 10.16 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArch Kinjal Chawda
ArchitectKinjal Chawda
EngineerRajesh Kakde
EngineerEr Raunak Chawda
Chartered AccountantRishi Lashkare
Chartered AccountantRavindra Lashkare
PartnerRole in project
Raunak Yogesh Chawda-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect Certificate - Chawda Buildcon - June 2025 (2).pdf20 Feb 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate - Chawda Buildcon - Sep 2025.pdf20 Feb 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate - Chawda Buildcon - Dec 2025.pdf20 Feb 2026
Withdrawal Update Form 2File: Form 2 - Engineer Certificate Chawda Buildcon - June 2025.pdf20 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate - Chawda Buildcon - Sep 2025.pdf20 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate - Chawda Buildcon - Dec 2025.pdf20 Feb 2026
Withdrawal Update Form 3File: Form 3 - CA Certificate Chawda Buildcon - June 2025_compressed.pdf20 Feb 2026
Withdrawal Update Form 3File: Form 3 CA Certificate - Chawda Buildcon - Sep 2025.pdf20 Feb 2026
Withdrawal Update Form 3File: Form 3 CA Certificate - Chawda Buildcon - Dec 2025.pdf20 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 2024-25.pdf6 Feb 2026
Form 1File: Chawda - Form 1 - March 2025.pdf10 Jul 2025
Form 2File: Chawda Industrial - Form 2 - March 2025.pdf10 Jul 2025
Form 3File: Chawda Industrial - Form 3 - March 2025.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: Chawda Industrial - Disclosure - March 2025.pdf10 Jul 2025
Form 1File: Chawda Industrial and Logistic Park - Form 1 - December 2024.pdf20 Jun 2025
Form 2File: Chawda Industrial and Logistic Park - Form 2 - December 2024.pdf20 Jun 2025
Form 3File: Chawda Industrial and Logistic Park - Form 3 - December 2024.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: Chawda Industrial and Logistic Park - Disclosure - December 2024.pdf20 Jun 2025
Form 1File: Chawda Industrial and Logistic Park - Form 1 - September 2024.pdf20 Jun 2025
Form 2File: Chawda Industrial and Logistic Park - Form 2 - September 2024.pdf20 Jun 2025
Form 3File: Chawda Industrial and Logistic Park - Form 3 - September 2024.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: Chawda Industrial and Logistic Park - Disclosure - September 2024.pdf20 Jun 2025
Form 1File: FORM 1 - Arch Certificate - June 2024.pdf20 Jun 2025
Form 2File: FORM 2 - Engineer Certificate - June 2024.pdf20 Jun 2025
Form 3File: FORM - 3 CA Certificate Chawda Buildcon - June 2024.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: Chawda Industrial and Logistic Park - Disclosure of Sold Inventory - June 2024.pdf20 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Chawda Industrial and Logistic Park - Form 1 - December 2024.pdf1 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chawda Industrial and Logistic Park - Form 3 - December 2024_compressed.pdf1 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Chawda Industrial and Logistic Park - Form 2 - December 2024.pdf1 Mar 2025
Disclosure of sold/ booked inventoryFile: Chawda Industrial and Logistic Park - Disclosure - December 2024.pdf1 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Chawda Industrial and Logistic Park - Form 1 - June 2024.pdf19 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Chawda Industrial and Logistic Park - Form 1 - September 2024.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chawda Industrial and Logistic Park - Form 3 - June 2024_compressed.pdf19 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chawda Industrial and Logistic Park - Form 3 - September 2024_compressed.pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Chawda Industrial and Logistic Park - Form 2 - June 2024.pdf19 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Chawda Industrial and Logistic Park - Form 2 - September 2024.pdf19 Dec 2024
Disclosure of sold/ booked inventoryFile: Chawda Industrial and Logistic Park - Disclosure - June 2024.pdf19 Dec 2024
Disclosure of sold/ booked inventoryFile: Chawda Industrial and Logistic Park - Disclosure - September 2024.pdf19 Dec 2024
Other - LegalFile: 92-4 part 1_compressed.pdf15 Apr 2024
Other - LegalFile: 92-4 part 2_compressed.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Chawda Buildcon NEW.pdf20 Mar 2024
Other - LegalFile: Sale Deed Copy Kh No 70.pdf19 Mar 2024
Other - LegalFile: Sale Deed Copy 9-25.pdf19 Mar 2024
Other - LegalFile: Sale Deed Copy 9-13.pdf19 Mar 2024
Other - TechnicalFile: Verfication mail.pdf18 Mar 2024
Layout approvalFile: Sanction Map Chawda.pdf3 Feb 2024
Building plan approval or NA orderFile: NA ORder.pdf3 Feb 2024
Copy of the legal title reportFile: Legal Title Report CHawda.pdf3 Feb 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate - Finance.pdf3 Feb 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate - Legal.pdf3 Feb 2024
Details of encumbrances concerned to LegalFile: Encumbrance Certificate - Finance.pdf3 Feb 2024
Details of encumbrances concerned to LegalFile: Encumbrance Certificate - Legal.pdf3 Feb 2024
Copy of Layout Approval (in case of layout)File: Sanction Map Chawda.pdf3 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: NA ORder.pdf3 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: NA ORder.pdf3 Feb 2024
Declaration about Commencement CertificateFile: Format D Declaration of CC.pdf3 Feb 2024
Declaration in FORM BFile: Form B.pdf3 Feb 2024
CERSAI detailsFile: Self Declaration of CERSAI.pdf3 Feb 2024
CERSAI detailsFile: CERSAI.pdf3 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annex A - Declaration of Interest in Other Organisation.pdf3 Feb 2024
Proforma of Allotment letterFile: Allotment Letter.pdf3 Feb 2024
Proforma of Agreement for saleFile: Draft Agreement.pdf3 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Bank Statement.pdf3 Feb 2024
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment Letter.pdf3 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to Model agreement.pdf3 Feb 2024
PAN CardFile: PAN.pdf2 Feb 2024

How this compares with Nagpur

0%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Chawda Industrial and Logistic Park on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dhargaon Kamptee ROad Nagpur2,800+ in Nagpur

Builder: Raunak Yogesh Chawda

Raunak Yogesh Chawda has 1 registration on MahaRERA, including Chawda Industrial and Logistic Park. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Chawda Industrial and Logistic Park is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Chawda Industrial and Logistic Park?

The registered promoter entity is Raunak Yogesh Chawda, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Chawda Industrial and Logistic Park?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Chawda Industrial and Logistic Park?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Chawda Industrial and Logistic Park?

The professionals named in the filing: Architect: Arch Kinjal Chawda; Architect: Kinjal Chawda; Engineer: Rajesh Kakde; Engineer: Er Raunak Chawda; Chartered Accountant: Rishi Lashkare; Chartered Accountant: Ravindra Lashkare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Chawda Industrial and Logistic Park?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Chawda Industrial and Logistic Park. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Chawda Industrial and Logistic Park to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.