Home / Browse projects / Thane, Maharashtra / CHAVAN SARVESHWARA

Registered Litigation declared Residential / Group Housing project

CHAVAN SARVESHWARA

By ANJANA SAHEBRAO CHAVAN

RG-MH-19153 · RERA P51700078205 · Last updated on MahaRERA portal: 9 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2029Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Basement (if any), 95%
86 of 156Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 48 documents Report an error

CHAVAN SARVESHWARA is a Residential / Group Housing project by ANJANA SAHEBRAO CHAVAN in Thane, Maharashtra, registered with MahaRERA as P51700078205 on 29 Nov 2024. Possession is promised by 30 Jun 2029. 70 of the 156 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameCHAVAN SARVESHWARA
  • TypeResidential / Group Housing
  • Location
    • BUDHAJI PATIL MARG
    • PARSIK NAGAR KALWA
    • Thane (M Corp.)
    • Thane
    • 421605
  • Pincode421605
  • RERA no.P51700078205
  • ReraGenie IDRG-MH-19153

Builder

  • NameANJANA SAHEBRAO CHAVAN
  • Entity typeProprietor
  • GSTIN27ACIPC0172B1ZA
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations6 more →
  • Completed5 of 7
  • Declared earlier projects3 →

Key dates

this monthRegisteredNov 2024PromisedJun 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Nov 2024
  • Promised completion30 Jun 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed48 files

Current status

45%70 of 156 units booked
23.6%Work done, per cost certificate

Figures as on 9 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 01NA211914115156

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 95%.

BUILDING NO 01: 28% average across the applicable activities

ActivityProgress
Excavation90%
Basement (if any)95%
Podiums (if any)0%
Plinth95%
Stilt Floor0%
Slabs of Super Structure12%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises2%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks12%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed760

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots760
Closed/Covered305
Open Space455

Land and ownership11

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,610 sq m
Land owned byThe promoter, with other names on the file
Named landowners11
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 May 2026
LandownerVillageDistrict
PARVATIBAI SHARAD PATILKalyan-Dombivali (M Corp.)Thane
JUI ASHOK PATILKalyan-Dombivali (M Corp.)Thane
ANKITA ASHOK PATILKalyan-Dombivali (M Corp.)Thane
Ashwini Ashok PatilKalyan-Dombivali (M Corp.)Thane
NAYANA SANJAY alias SANJEEV PATILKalyan-Dombivali (M Corp.)Thane
CHAITALI UDAY THAKURKalyan-Dombivali (M Corp.)Thane
SACHIN SHARAD PATILKalyan-Dombivali (M Corp.)Thane
SUSHIL SHARAD PATILKalyan-Dombivali (M Corp.)Thane
CHHAYA ASHOK PATILKalyan-Dombivali (M Corp.)Thane
RAJENDRA BUDHAJI PATILKalyan-Dombivali (M Corp.)Thane
KALURAM BUDHAJI PATILKalyan-Dombivali (M Corp.)Thane

Approvals and building plan

Sanctioning authorityTHANE MUNICIPAL CORPORATION
Permissible FSI18461.63
Proposed, not sanctioned11,967 sq m
Buildings approved4
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Varsha Park, Wayale Nagar, Khadak Pada, Kalyan W Thane Dist., Maharashtra.421301
Estimated costRs 55.06 cr
Cost incurredRs 12.99 cr
Work done23.59%
BuildingWingEstimatedIncurred
BUILDING NO 01NARs 35.74 crRs 12.99 cr
-NARs 19.32 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESIGN CONSORTIUM
EngineerAJAY MAHALE AND ASSOCIATES
Chartered AccountantSNGP AND CO
Chartered AccountantBHARTI RUPESH & ASSOCIATES
Chartered AccountantSonawane Sahane & Associates
PartnerRole in project
OM SHREE SAIKRUPA CONSTRUCTION-

Litigation declared3

CaseCourtStatus
816/2021CIVIL COURT S D THANEOngoing
541/2023CIVIL COURT S D THANEOngoing
451/2023CIVIL COURT S D THANEOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2029

Documents filed48

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form_1_Sarveshwara_31_03_2026_Signed.pdf9 Jun 2026
Withdrawal Update Form 2File: Form-2 Sarveshwara_31_03_2026.pdf9 Jun 2026
Withdrawal Update Form 3File: Form3_Sarveshwar_31_03_2026_New.pdf9 Jun 2026
Withdrawal Update Form 1File: Form_1_June_2025.pdf12 May 2026
Withdrawal Update Form 1File: Form_1_Chavan Sarveshwara_30_09_2025-Final.pdf12 May 2026
Withdrawal Update Form 1File: Form_1_Chavan Sarveshwara_31_12_2025.pdf12 May 2026
Withdrawal Update Form 2File: Sarveshwara Form-2 June-25.pdf12 May 2026
Withdrawal Update Form 2File: Sarveshwara Form-2 Sept-25.pdf12 May 2026
Withdrawal Update Form 2File: Sarveshwara Form-2 Dec-25.pdf12 May 2026
Withdrawal Update Form 3File: Form 3_Chavan Sarveshwara_June 2025_Final.pdf12 May 2026
Withdrawal Update Form 3File: Form_1_Chavan Sarveshwara_30_09_2025-Final.pdf12 May 2026
Withdrawal Update Form 3File: Form3_31_12_2025_Chavan Sarveshwara_Final.pdf12 May 2026
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Revised.pdf6 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_ChavanSarweshwara_Final.pdf12 Nov 2024
Declaration about Commencement CertificateFile: Format_D_CC_Declaration.pdf12 Nov 2024
Copy of the legal title reportFile: Legal Title Report_11zon.pdf26 Oct 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER_Chavan Sarveshwara.pdf26 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A_Chavan Sarveshwara_On Promoter Letterhead.pdf26 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration cum undertaking for no sale.pdf26 Oct 2024
Proforma of Agreement for saleFile: Agreement for Sale_Chavan Sarveshwara.pdf26 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Forma_B_Bank Letterhead.pdf26 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Declaration cum undertaking for no sale.pdf26 Oct 2024
Building plan approvalFile: 3_LAYOUT PLAN.pdf8 Oct 2024
Building plan approvalFile: 2_LAYOUT PLAN.pdf8 Oct 2024
Building plan approvalFile: 1_LAYOUT PLAN.pdf8 Oct 2024
Layout approvalFile: 3_LAYOUT PLAN.pdf8 Oct 2024
Layout approvalFile: 2_LAYOUT PLAN.pdf8 Oct 2024
Layout approvalFile: 1_LAYOUT PLAN.pdf8 Oct 2024
PAN CardFile: Anjana Madam Pancard.pdf8 Oct 2024
Details of encumbrances concerned to FinanceFile: Financial and Legal Encumbrance.pdf8 Oct 2024
Copy of Layout Approval (in case of layout)File: 1_LAYOUT PLAN.pdf8 Oct 2024
Copy of Layout Approval (in case of layout)File: 2_LAYOUT PLAN.pdf8 Oct 2024
Copy of Layout Approval (in case of layout)File: 3_LAYOUT PLAN.pdf8 Oct 2024
Declaration in FORM BFile: Form_B_Promoter.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_Final.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_Final.pdf8 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf8 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 3_LAYOUT PLAN.pdf8 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 1_LAYOUT PLAN.pdf8 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 2_LAYOUT PLAN.pdf8 Oct 2024
Other - LegalFile: Annexure_A_50_2024_Declaration-Cum-Undertaking.pdf8 Oct 2024
CERSAI detailsFile: Undertaking_CERSAI.pdf8 Oct 2024
Deviation Report with respect to Allotment letterFile: No Deviation_Allotment Letter.pdf8 Oct 2024
Details of encumbrances concerned to LegalFile: Financial and Legal Encumbrance.pdf8 Oct 2024
Other - TechnicalFile: Annexure_A_50_2024_Declaration-Cum-Undertaking.pdf8 Oct 2024
Deviation Report with respect to model copy of AgreementFile: NO DEVIATION IN AGREEMENT.pdf8 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Innterest in Other Organisation.pdf8 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: Declosure of Secured and Unsecured Loan.pdf8 Oct 2024

How this compares with Thane

45%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CHAVAN SARVESHWARA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PARSIK NAGAR KALWA7,600+ in Thane

Builder: ANJANA SAHEBRAO CHAVAN

ANJANA SAHEBRAO CHAVAN has 7 registrations on MahaRERA, including SAI SHARNAM and SAI SARVESH. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if CHAVAN SARVESHWARA is delayed beyond 30 Jun 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CHAVAN SARVESHWARA?

The registered promoter entity is ANJANA SAHEBRAO CHAVAN, a proprietor as per the filing. Its GSTIN 27ACIPC0172B1ZA can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CHAVAN SARVESHWARA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CHAVAN SARVESHWARA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CHAVAN SARVESHWARA?

The professionals named in the filing: Architect: DESIGN CONSORTIUM; Engineer: AJAY MAHALE AND ASSOCIATES; Chartered Accountant: SNGP AND CO; Chartered Accountant: BHARTI RUPESH & ASSOCIATES; Chartered Accountant: Sonawane Sahane & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CHAVAN SARVESHWARA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CHAVAN SARVESHWARA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CHAVAN SARVESHWARA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.