Home / Browse projects / Mumbai Suburban, Maharashtra / CHARKOP NANDANVAN CHSL

Registered No litigation declared Residential / Group Housing project

CHARKOP NANDANVAN CHSL

By JADEITE DEVELOPERS LLP

RG-MH-05172 · RERA P51800050125 · Last updated on MahaRERA portal: 2 Jun 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Internal walls, 99%
51 of 188Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

CHARKOP NANDANVAN CHSL is a Residential / Group Housing project by JADEITE DEVELOPERS LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050125 on 20 Mar 2023. Possession is promised by 31 Dec 2026. 137 of the 188 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameCHARKOP NANDANVAN CHSL
  • TypeResidential / Group Housing
  • Location
    • CHARKOP
    • SECTOR -2
    • KANDIVALI (WEST)
    • Kandivali
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • RERA no.P51800050125
  • ReraGenie IDRG-MH-05172

Builder

  • NameJADEITE DEVELOPERS LLP
  • Entity typePartnership
  • PartnersMANISH PANDIT SAWANT, LITESH KORSHI GADA
  • Other registrations2 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredMar 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Mar 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed97 files

Current status

73%137 of 188 units booked
130.5%Work done, per cost certificate

Figures as on 2 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CHARKOP NANDANVAN CHSLNA22221844188

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 99%.

CHARKOP NANDANVAN CHSL: 74% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure23%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 2 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed69

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots69
Closed/Covered69

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,446 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Sep 2025
LandownerVillageDistrict
M/S. JADEITE DEVELOPERS LLPKandivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI8912.03
Proposed, not sanctioned8,912 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 16, Gr Flr, Kanakia Zillion, LBS CST Road, Kurla West, Mumbai - 400070
Estimated costRs 30.25 cr
Cost incurredRs 39.46 cr
Work done130.47%
BuildingWingEstimatedIncurred
CHARKOP NANDANVAN CHSLNARs 30.25 crRs 39.46 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAMESH B KHANOLKAR
EngineerChandra Bhooshan Yadav
EngineerANIKET CHAVAN
EngineerSatish Kadam
Chartered AccountantMUSAMJI & PATEL
Chartered AccountantPUNIT PATEL & ASSOCIATES
PartnerRole in project
JADEITE DEVELOPERS LLP-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12503206JADEITE DEVELOPERS LLPMR BHUPENDRA VALLABDAS DAVDA (ALLOTTEE)10/09/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Nandanvan Architect Certificate.pdf2 Jun 2026
Withdrawal Update Form 2File: Nandanvan Engineer Certificate.pdf2 Jun 2026
Withdrawal Update Form 3File: Nandanvan Form 3 March 31 2026 Signed.pdf2 Jun 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate Nandanvan.pdf30 May 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate Nandanvan.pdf30 May 2026
Withdrawal Update Form 1File: Form 1 Nandanvan Q3.pdf30 May 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate (Nandanvan).pdf30 May 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate (Nandanvan).pdf30 May 2026
Withdrawal Update Form 2File: Form 2 Nandanvan Q3.pdf30 May 2026
Withdrawal Update Form 3File: Q2 Nandanvan 1 Form -3 FY 25-26.pdf30 May 2026
Withdrawal Update Form 3File: Q2 Nandanvan 1 Form -3 FY 25-26.pdf30 May 2026
Withdrawal Update Form 3File: Nandanvan Form 3 December 31 2025 Signed.pdf30 May 2026
Form 5 (FY 2024-2025)File: Form-5_2024-25 (Signed) (1).pdf22 Apr 2026
Withdrawal Update Form 1File: Form-1 Nandanvan.pdf5 Nov 2025
Withdrawal Update Form 2File: Enginner from 2 Nandanvan.pdf5 Nov 2025
Withdrawal Update Form 3File: Nandanvan - Form 3 30062025 (Signed).pdf5 Nov 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf24 Apr 2025
Disclosure of sold/ booked inventoryFile: Inventory disclosure format letter.pdf24 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 2023-2024 (1).pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf19 Apr 2025
Proforma of Agreement for saleFile: Draft sale agreement.pdf24 Mar 2025
Details of encumbrances concerned to FinanceFile: Financial Encumbrance Jadeite.pdf10 Mar 2025
Details of encumbrances concerned to LegalFile: Financial Encumbrance Jadeite.pdf10 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf10 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: 11769_furthercc_signed.pdf23 Dec 2024
Building plan approvalFile: IOA.pdf16 Nov 2024
Layout approvalFile: Plans_1-3.pdf16 Nov 2024
Layout approvalFile: Plans_4-6.pdf16 Nov 2024
Layout approvalFile: Plans_7-end.pdf16 Nov 2024
Layout approvalFile: Plans_1-3.pdf16 Nov 2024
Layout approvalFile: Plans_4-6.pdf16 Nov 2024
Layout approvalFile: Plans_7-end.pdf16 Nov 2024
Building plan approvalFile: IOA.pdf16 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOA.pdf16 Nov 2024
Copy of Layout Approval (in case of layout)File: Plans_1-3.pdf16 Nov 2024
Copy of Layout Approval (in case of layout)File: Plans_4-6.pdf16 Nov 2024
Copy of Layout Approval (in case of layout)File: Plans_7-end.pdf16 Nov 2024
Copy of Layout Approval (in case of layout)File: Plans_1-3.pdf16 Nov 2024
Copy of Layout Approval (in case of layout)File: Plans_4-6.pdf16 Nov 2024
Copy of Layout Approval (in case of layout)File: Plans_7-end.pdf16 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: IOA.pdf16 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: furthercc_signed.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1 .pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3 .pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 03 24.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 06 24.pdf18 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer form 2A 23-24.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf18 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (Signed).pdf18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (Signed).pdf18 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Enginner form 2A 22-23.pdf11 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - FY 2023 (Signed).pdf8 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - January 2024 (Revised and signed) (1).pdf20 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf13 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer form 2.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3.pdf6 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 DATE 28-08-2023.pdf29 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf28 Aug 2023
Building plan approvalFile: IOA.pdf29 May 2023
Layout approvalFile: Plans 1.pdf29 May 2023
Layout approvalFile: Plans 2-3.pdf29 May 2023
Layout approvalFile: Plans 4-5.pdf29 May 2023
Layout approvalFile: Plans 6-7.pdf29 May 2023
Layout approvalFile: Plans 8-9.pdf29 May 2023
Copy of Layout Approval (in case of layout)File: Plans 1.pdf29 May 2023
Copy of Layout Approval (in case of layout)File: Plans 2-3.pdf29 May 2023
Copy of Layout Approval (in case of layout)File: Plans 4-5.pdf29 May 2023
Copy of Layout Approval (in case of layout)File: Plans 6-7.pdf29 May 2023
Copy of Layout Approval (in case of layout)File: Plans 8-9.pdf29 May 2023
Building Plan Approval / NA Order for plotted developmentFile: IOA.pdf29 May 2023
Disclosure of sold/ booked inventoryFile: Charkop Nandanvan - Inventory details for RERA.pdf15 Apr 2023
Building plan approvalFile: 1 Copy of Layout Approval (in case of layout).pdf15 Mar 2023
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf15 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Copy of Layout Approval (in case of layout).pdf15 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development.pdf15 Mar 2023
Copy of the legal title reportFile: 14-03-2023 NEW TITLE REPORT (As Per RERA New Format).pdf14 Mar 2023

How this compares with Mumbai Suburban

73%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CHARKOP NANDANVAN CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KANDIVALI (WEST)6,700+ in Mumbai Suburban

Builder: JADEITE DEVELOPERS LLP

JADEITE DEVELOPERS LLP has 3 registrations on MahaRERA, including CHARKOP NANDANVAN CHSL and CHARKOP 1 KAVERI CHSL. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if CHARKOP NANDANVAN CHSL is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CHARKOP NANDANVAN CHSL?

The registered promoter entity is JADEITE DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CHARKOP NANDANVAN CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against CHARKOP NANDANVAN CHSL?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for CHARKOP NANDANVAN CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CHARKOP NANDANVAN CHSL?

The professionals named in the filing: Architect: RAMESH B KHANOLKAR; Engineer: Chandra Bhooshan Yadav; Engineer: ANIKET CHAVAN; Engineer: Satish Kadam; Chartered Accountant: MUSAMJI & PATEL; Chartered Accountant: PUNIT PATEL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CHARKOP NANDANVAN CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CHARKOP NANDANVAN CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CHARKOP NANDANVAN CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.