Registered No litigation declared Residential / Group Housing project

Charkop Akash Kiran CHS Ltd

By Sangam Developers

RG-MH-30384 · RERA P51800031000 · Last updated on MahaRERA portal: 23 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 24 months from the original
27 of 33Construction stages doneacross 3 buildings; furthest along: Installation of Lifts, 90%
89 of 260Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 144 documents Report an error

Charkop Akash Kiran CHS Ltd is a Residential / Group Housing project by Sangam Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800031000 on 29 Sep 2021. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 171 of the 260 units on this registration are recorded sold or booked, and 27 of 33 construction stages are filed complete.

At a glance

Project

  • NameCharkop Akash Kiran CHS Ltd
  • TypeResidential / Group Housing
  • Location
    • RSC-2/2A
    • CHARKOP KANDIVALI WEST
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800031000
  • ReraGenie IDRG-MH-30384

Builder

  • NameSangam Developers
  • Entity typePartnership
  • PartnersChunilal Manshi Gala, Meghji Jasa Patel
  • Other registrations1 more →

Key dates

this monthRegisteredSep 2021First promiseDec 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Sep 2021
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2024)
  • Buildings3 building records
  • Documents filed144 files

Current status

66%171 of 260 units booked
97.6%Work done, per cost certificate

Figures as on 23 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA232380080
B WINGNA232380080
C and D WINGNA23231000100

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 23 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 90%.

A WING90%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
B WING99%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
C and D WING81%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 23 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed132

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots132
Closed/Covered68
Open Space64
BuildingClosed/CoveredOpen SpaceTotal
A WING231942
B WING131831
C and D WING322759

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,762 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Charkop Akashkiran CHS LtdBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityBrihanmumbai Mahanagarpalika
Permissible FSI15600.0
Proposed, not sanctioned15,600 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBORIVALI
Estimated costRs 99.51 cr
Cost incurredRs 97.14 cr
Work done97.63%
BuildingWingEstimatedIncurred
C and D WINGNARs 38.27 crRs 37.36 cr
A WINGNARs 30.62 crRs 29.89 cr
B WINGNARs 30.62 crRs 29.89 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPACE MOULDERS
EngineerKrishnakumar L GOHEL
EngineerSURA & ASSOCIATES
Chartered AccountantJ B PATEL & ASSOCIATES
Chartered AccountantT. N. Gala & Associates
PartnerRole in project
Sangam Developers-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800026029Dec 2024 → Dec 2025

Reason as filed by the promoterUnforeseen labor shortages, disruptions in the supply chain, Challenges in acquiring specific building materials, especially in the case of global supply chain disruptions

EA24122518983Dec 2024 → Dec 2026

Reason as filed by the promoterThe project was delayed mainly due to shortages of skilled labor and contractor resources, along with unexpected supply chain disruptions that delayed the availability of critical materials. These issues significantly affected the project timeline, although steps have since been taken to mitigate the delays and move toward completion.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed144

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 144 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form -1 - Q4.pdf23 Jun 2026
Withdrawal Update Form 1File: Form -1 - Q4.pdf23 Jun 2026
Withdrawal Update Form 2File: Form 2.pdf23 Jun 2026
Withdrawal Update Form 2File: Form 2 Q-4 - Signed.pdf23 Jun 2026
Withdrawal Update Form 3File: Form-3- Final Q-4.pdf23 Jun 2026
Withdrawal Update Form 3File: Form-3- Final Q-4.pdf23 Jun 2026
Withdrawal Update Form 1File: Sangam Charkop - Q3 - Form -1 .pdf27 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf27 Feb 2026
Withdrawal Update Form 3File: FORM 3.pdf27 Feb 2026
Withdrawal Update Form 1File: Sangam Charkop - Q3 - Form -1 .pdf26 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf26 Feb 2026
Withdrawal Update Form 3File: FORM 3 31 12 25 SANGAM DEVELOPERS signed.pdf26 Feb 2026
Withdrawal Update Form 1File: Form1.pdf24 Dec 2025
Withdrawal Update Form 1File: FORM 1 .pdf24 Dec 2025
Withdrawal Update Form 2File: form 2.pdf24 Dec 2025
Withdrawal Update Form 2File: form 2.pdf24 Dec 2025
Withdrawal Update Form 3File: Form 3.pdf24 Dec 2025
Withdrawal Update Form 3File: form 3 .pdf24 Dec 2025
Form 2A (FY 2024-2025)File: FORM 2A FY 2024 25 CERTIFICATE NO1.pdf24 Dec 2025
Form 5 (FY 2024-2025)File: form 5 (2).pdf24 Dec 2025
Other - TechnicalFile: 6 (3).pdf15 Mar 2025
Declaration in FORM BFile: FORM B - Promoter Meghji Jasa Patel.pdf13 Mar 2025
Declaration in FORM BFile: FORM B - Promoter Chunilal Manshi Gala.pdf13 Mar 2025
Declaration in FORM BFile: FORM B- LANDOWNER HITESH VIRJI PATEL.PDF13 Mar 2025
Declaration in FORM BFile: 6 (7).pdf4 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 24_compressed.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 Form 2 - Dec 24.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Form 2 - Sep 24.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Form 2 - Jun 24.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Form 2 - Mar 24.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Form 2 - Jun 23.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Form 2 - Dec 23.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Form 2 - Mar 23.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form 2 - Sep 22.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Form 2 - Jun 22.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Mar 22.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Form 2 - Dec 21.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 0 Form 2 - Sep 21.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Form 2 - Sep 23.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Form 1 - Dec 24.pdf13 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Form 3 - Dec 22.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 Form 3 - Sep 24_compressed.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form 3 - Jun 24_compressed.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 - Mar 24_compressed.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 Form 3 - Mar 23.pdf10 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A - 2021-2022 - SANGAM DEVELOPERS.pdf10 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A - 2022-2023 - SANGAM DEVELOPERS.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Form 1 - Mar 24.pdf8 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Form 1 - Sep 24.pdf8 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Form 1 - June 24.pdf8 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Form 1 - Mar 23.pdf8 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Form 1 - Dec 22.pdf8 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form 1 - Jun 22.pdf8 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form 1 - Mar 22.pdf8 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Dec 21.pdf8 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sep 24.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dec 24.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Booked Disclosure - Dec 24.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD-UNSOLD UNITS 30 09 24.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Booked Disclosure - Dec 24.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD-UNSOLD UNITS 31 03 24_compressed.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD-UNSOLD UNITS 31 12 22.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD-UNSOLD UNITS 30 06 24.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD-UNSOLD UNITS- sangam.pdf2 Jan 2025
Declaration about Commencement CertificateFile: DECLARATION ABOUT CC.pdf2 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Separate bank details_page.pdf2 Jan 2025
Deviation Report with respect to Allotment letterFile: No Deviation from Allotment Letter.pdf2 Jan 2025
Other - TechnicalFile: Annexure A OP OR.pdf2 Jan 2025
Other - TechnicalFile: Annexure A OP OR.pdf2 Jan 2025
Deviation Report with respect to model copy of AgreementFile: No deviation from agreement for sale.pdf2 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Chunilal- Disclosure of other projects.pdf2 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Meghji- Disclosure of other projects.pdf2 Jan 2025
Details of encumbrances concerned to FinanceFile: Encumbrances to Legal.pdf30 Dec 2024
Details of encumbrances concerned to LegalFile: Encumbrances to Legal.pdf30 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 sangam final.pdf25 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - 2023-2024.pdf25 Dec 2024
Details of encumbrancesFile: RERA Encumbrance SANGAM.pdf7 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 sangam Sept.pdf27 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 sangam June.pdf27 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sangam D.pdf5 Nov 2024

How this compares with Mumbai Suburban

66%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Charkop Akash Kiran CHS Ltd on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHARKOP KANDIVALI WEST6,700+ in Mumbai Suburban

2 kmCharkop Akash Kiran CHS Completed 59Lapsed / revoked 40Other 70Dot size: filed unitsN

Filed coordinates, straight-line distance. 169 registered projects within 2 km.

Builder: Sangam Developers

Sangam Developers has 2 registrations on MahaRERA, including Charkop Akash Kiran CHS Ltd and Om residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Charkop Akash Kiran CHS Ltd is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Charkop Akash Kiran CHS Ltd?

The registered promoter entity is Sangam Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Charkop Akash Kiran CHS Ltd?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Charkop Akash Kiran CHS Ltd?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Charkop Akash Kiran CHS Ltd?

The professionals named in the filing: Architect: SPACE MOULDERS; Engineer: Krishnakumar L GOHEL; Engineer: SURA & ASSOCIATES; Chartered Accountant: J B PATEL & ASSOCIATES; Chartered Accountant: T. N. Gala & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Charkop Akash Kiran CHS Ltd?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Charkop Akash Kiran CHS Ltd. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Charkop Akash Kiran CHS Ltd to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.