Home / Browse projects / Pune, Maharashtra / Chandrarang Floret
Chandrarang Floret
By Chandrarang Developer and Builders Private Limited
RG-MH-39431 · RERA P52100047033 · Last updated on MahaRERA portal: 9 Nov 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 24 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Chandrarang Floret is a Residential / Group Housing project by Chandrarang Developer and Builders Private Limited in Pune, Maharashtra, registered with MahaRERA as P52100047033 on 26 Sep 2022. Possession was promised by 31 Oct 2024 and is now 24 months past that date.
At a glance
Project
- NameChandrarang Floret
- TypeResidential / Group Housing
- Location
- Pimple Gurav
- Pimpale Gurav
- Haveli
- Pune
- 411061
- Pincode411061
- RERA no.P52100047033
- ReraGenie IDRG-MH-39431
Builder
- NameChandrarang Developer and Builders Private Limited
- Entity typeCompany
- Managing DirectorVijay Pandurang Jagtap
- DirectorsShankar Pandurang Jagtap, Ashwini Laxman Jagtap
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on26 Sep 2022
- Promised completion31 Oct 2024
- Revised completionNone
- Buildings4 building records
- Documents filed63 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Building | NA | 6 | 0 | 0 | 0 | 0 |
| B Building | NA | 5 | 0 | 0 | 0 | 0 |
| C Building | NA | 5 | 0 | 0 | 0 | 0 |
| D Building | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 9 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
44 of 44 construction stages are filed complete across 4 buildings.
A Building100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B Building100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C Building100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D Building100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 9 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Parking filed76
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A Building | 12 | 12 | 24 |
| B Building | 10 | 10 | 20 |
| C Building | 10 | 10 | 20 |
| D Building | 0 | 12 | 12 |
Land and ownership3
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Mr Murlidhar Khandu Jagtap | Pimpale Gurav | Pune |
| Mr Sumit Lakshman Jagtap | Pimpale Gurav | Pune |
| Sumit Lakshman Jagtap | Pimpale Gurav | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar Suhas Ankush Undre |
| Engineer | Mr Ashok Gadhave |
| Chartered Accountant | CA Sumeet Kate and Co |
| Partner | Role in project |
|---|---|
| Chandrarang Developer and Builders Private Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Aug 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Aug 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Sep 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 9 Nov 2024
Documents filed63
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: FLORET - FORM.pdf | 9 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FLORET PART COMPLITION.pdf | 9 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: floret complition -.pdf | 9 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 2022-2023 (1).pdf | 9 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2022-2023 (1) (1).pdf | 9 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2022-2023 (1) (2).pdf | 9 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Floret (1) FORM 1_11zon.pdf | 21 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Chandrarang Floret form 2.pdf | 29 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: B Building Sold Unsold 01-04-2024.pdf | 29 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE (4) (1).pdf | 29 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Floret_FY2022-23_Form 5.pdf | 14 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera- Floret_compressed.pdf | 23 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2.pdf | 23 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2.pdf | 23 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 23 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 23 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sold Unsold.pdf | 23 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CDBPL (Chandrarang Floret) Signed Form 3_compressed.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: sold unsold (2).pdf | 17 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: GetUserDocumentFileContent (5) (3).pdf | 11 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: F1_11zon.pdf | 9 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: chandrarang floret QU october 23.pdf | 9 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: chandrarang floret July 23_compressed (1).pdf | 22 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: _From 3_compressed (1).pdf | 22 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: _From 3_compressed (1).pdf | 22 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: CDBPL-Floret_FY2023-24_Q1_Sold Unsold CIRCULAR (1)_compressed.pdf | 11 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Floret_FY2022-23_Q-4_Sold Unsold Inventory CIRCULAR (1).pdf | 11 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CDBPL-FLORET - RERA UPDATES FY 2023-24 Q1.pdf | 10 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Chandrarang Floret_RERA_QU4-2022-23_Form 1__compressed.pdf | 20 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Chandrarang Floret (3).pdf | 17 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Chandrarang floret.pdf | 11 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: IMG20230220133813 (1).pdf | 21 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: sold unsold_compressed.pdf | 20 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Floret_compressed (2).pdf | 20 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch certificate.pdf | 17 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Chandrarang Floret(1).pdf | 17 Jan 2023 |
| Building plan approvalFile: IOD (3).pdf | 6 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD (3).pdf | 6 Sep 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200246269085_For_Asset_Based_Search_03_09_2022_12_46_06_487.pdf | 3 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chandrarang Floret From No 03_removed_compressed-1-5.pdf | 3 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3- 4-8.pdf | 3 Sep 2022 |
| Proforma of Allotment letterFile: Final 5 - DRAFT -Floret- 13-09-2022.pdf | 2 Sep 2022 |
| Proforma of Allotment letterFile: Model From Allotment Latter_compressed-1-5.pdf | 2 Sep 2022 |
| Proforma of Allotment letterFile: Model From Allotment Latter_compressed-6-9.pdf | 2 Sep 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Form A Floret.pdf | 2 Sep 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter.pdf | 2 Sep 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report- 30-Revised.pdf | 2 Sep 2022 |
| Layout approvalFile: 1_compressed.pdf | 30 Aug 2022 |
| Building plan approvalFile: 2_compressed.pdf | 30 Aug 2022 |
| Building plan approvalFile: 3_compressed.pdf | 30 Aug 2022 |
| Building plan approvalFile: 4_compressed.pdf | 30 Aug 2022 |
| PAN CardFile: CDBPL_PAN Card.pdf | 30 Aug 2022 |
| Copy of the legal title reportFile: RERA FORMAT-A- SEARCH AND TITLE- CHANDRARANG FLORET-SNO30-1 PIMPLE GURAV_compressed (1).pd | 30 Aug 2022 |
| Copy of the legal title reportFile: Search Title- CHANDRARANG FLORET-Sno 30-1 PIMPLE GURAV_compressed.pdf | 30 Aug 2022 |
| Details of encumbrances concerned to FinanceFile: Encumbrance (4).pdf | 30 Aug 2022 |
| Details of encumbrances concerned to LegalFile: Encumbrance (4).pdf | 30 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: 1_compressed.pdf | 30 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 2_compressed.pdf | 30 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 3_compressed.pdf | 30 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 4_compressed.pdf | 30 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_compressed.pdf | 30 Aug 2022 |
| Declaration about Commencement CertificateFile: Format D (4).pdf | 30 Aug 2022 |
| Declaration in FORM BFile: Floret_Developer_Form - B_page-0001.pdf | 30 Aug 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 63 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Chandrarang Floret on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pimple Gurav13,700+ in Pune
Samrajya Wing GH
Garve Patil Construction Company
Eastern River Residency Wing C
Kishor Shankar Garve
KRISHNA PRABHA AANGAN
RATHOD AND SONS
Eastern River Residency Wing D
Kishor Shankar Garve
Eastern River Residency Wing B
Kishor Shankar Garve
Samrajya C Wing
Garve Patil Construction Company
Builder: Chandrarang Developer and Builders Private Limited
Chandrarang Developer and Builders Private Limited has 1 registration on MahaRERA, including Chandrarang Floret. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that Chandrarang Floret shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Chandrarang Floret is delayed beyond 31 Oct 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Chandrarang Floret?
The registered promoter entity is Chandrarang Developer and Builders Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Chandrarang Floret?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Chandrarang Floret?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Chandrarang Floret?
The professionals named in the filing: Architect: Ar Suhas Ankush Undre; Engineer: Mr Ashok Gadhave; Chartered Accountant: CA Sumeet Kate and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Chandrarang Floret?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback