Home / Browse projects / Pune, Maharashtra / CHANDAN HERITAGE
CHANDAN HERITAGE
RG-MH-71613 · RERA P52100017547 · Last updated on MahaRERA portal: 31 Oct 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Possession 1 months past the filed date
- Completion date moved by 57 months
- 7 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CHANDAN HERITAGE is a Residential / Group Housing project by CITY DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100017547 on 24 Aug 2018. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 57 months from the original filing. 9 of the 18 units on this registration are recorded sold or booked, and 16 of 22 construction stages are filed complete.
At a glance
Project
- NameCHANDAN HERITAGE
- TypeResidential / Group Housing
- Location
- LOHEGAON D Y PATIL ROAD
- Pune (M Corp.)
- Pune City
- Pune
- 411047
- Pincode411047
- RERA no.P52100017547
- ReraGenie IDRG-MH-71613
Builder
- NameCITY DEVELOPERS
- Entity typeOthers
- GSTIN27AADAC9891R1ZP
- Named personsRAFIK A MULLA, GAJANAN V DESHMUKH, HARSHAL P PISAL
- Other registrations1 more →
- Completed1 of 2
- Past their filed date1
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on24 Aug 2018
- Promised completion30 Sep 2026
- Revised completionRevised to 30 Sep 2026 (originally 31 Dec 2021)
- Buildings2 building records
- Documents filed101 files
Current status
Figures as on 31 Oct 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| CHANDAN HERITAGE - WING B | NA | 2 | 2 | 8 | 0 | 8 |
| CHANDAN HERITAGE - WING A | NA | 2 | 2 | 8 | 2 | 10 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 31 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
16 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Installation of Lifts, at 99%.
CHANDAN HERITAGE - WING B82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 99% |
CHANDAN HERITAGE - WING A82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 99% |
Progress on shared amenities15
As on 31 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed10
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| CHANDAN HERITAGE - WING B | 4 | 4 |
| CHANDAN HERITAGE - WING A | 6 | 6 |
Land and ownership4
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| BALJIT SINGH | LOHGAON | Pune |
| KAMESHWAR PRASAD | VIMANNAGAR | Pune |
| DIBBYANDU KUMAR SARKAR | VIMANNAGAR | Pune |
| BHARTI MOHAN GUPTA | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | CUBIX ARCHITECT |
| Engineer | HARSHAL PISAL |
| Chartered Accountant | DHANANJAY JAMBHULKAR |
| Chartered Accountant | MRK AND COMPANY |
| Partner | Role in project |
|---|---|
| CITY DEVELOPERS | - |
Extensions applied for7
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to Covid 19 and revised in FSi extension required till 30/06/2023 i.e. one year from existing extension for Covid . Due to covid 19 Project extension already issued till 30/06/2022. Hence extension required till 30/06/2023 but system does not accept till 30/06/2022.
Reason as filed by the promoterDue to pandamic consditions as well as revised plan sanctioned . Also final D.P. has not finalised by Pune Municipal Corporation , Local Authority and other Government Authorities.
Reason as filed by the promoterNow PMC authoritIes demanding Fire NOC which was not previously asked . So for this sufficient time required as now a days many officers are on election duty for upcoming election till June 2024 and afterwords they can work for completion certificate. All above NOC and Letter are already attached for last extention certificate Our project construction is fully completed and just waiting for Completition Certifcate. So please consider the above and approve extension for project till 30/09/2024.
Reason as filed by the promoterConstructions activities have been fully completed . All flats are ready for possession. But completion certificate procedure, various NOC are not getting further from Local Authority i.e. Pune Municipal Corporation due to their work load and other activities. Local authorities have assure us thse will get within two three months . Hence extension required. Secondly Flats/Shops alloted to Bharati Mohan Gupta has given consent orally due to out of station . Hence we have 100 % consents obtained .
Reason as filed by the promoterWe would like to state that previously we had applied for extension for project on 28/06/2023 . At the time of that application we had state that due to certain difficulties arises for availing completion certificate in Local Authority i.e. P.M.C. However in the meantime respective officers were not available due to visits of various Ministers of India to Pune. And also due to festivals and holidays, offices were closed for many times. We have received some NOC which requires for completion certificate from various departments of P.M.C. in this month. Also M.S.E.B. has given load sanction lett
Reason as filed by the promoterWe have applied for extension for our Project bearing No. P52100017547. In this connection we would like to state that previously we had applied extension upto 30-09-2024 . At the time of that application we had state that due to certain difficulties arises for availing completion certificate in P.M.C.as respective officers were not available and now demanding Fire NOC which was not previously asked by them. We have received some NOC which requires for completion certificate from various departments of PMC and already submitted to respective authorities. So for this sufficient time required as
Reason as filed by the promoterWe have applied for extension for our Project bearing No. P52100017547. In this connection we would like to state that please refer our letter dated 19/10/2024 for the previous extension upto 30-09-2025 . At that time we have not received D.P.opinion from PMC because Maharashtra Government had transferred the said opinion to Town Planning Dept. Due to this we have received Part Completion (Part OC) on 17-10-2025 from PMC. Now again Maharashtra Govt. has transferred the D.P. Opinion rights to Local Authorities i.e. PMC and for this we are following the required procedure at the office of PMC. A
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Oct 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Sep 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Sep 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed101
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: ARCHITECT CERT 29-4-24.pdf | 31 Oct 2025 |
| Withdrawal Update Form 2File: engg certificate3006204.pdf | 31 Oct 2025 |
| Withdrawal Update Form 3File: CA CERT 31-3-2024_ RERA.pdf | 31 Oct 2025 |
| Withdrawal Update Form 1 | 19 Oct 2025 |
| Withdrawal Update Form 1File: ARCHITECT CERT 29-4-24.pdf | 19 Oct 2025 |
| Withdrawal Update Form 2 | 19 Oct 2025 |
| Withdrawal Update Form 2File: engg certificate3006204.pdf | 19 Oct 2025 |
| Withdrawal Update Form 3 | 19 Oct 2025 |
| Withdrawal Update Form 3File: CA CERT 31-3-2024_ RERA.pdf | 19 Oct 2025 |
| Form 2A (FY 2024-2025)File: ENGG CERT 2A 24-25.pdf | 19 Oct 2025 |
| Form 5 (FY 2024-2025)File: CA CERT 24-25 ANNUAL.pdf | 19 Oct 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY CERT CHANDAN HERITAGE.pdf | 9 Jan 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY CERT CHANDAN HERITAGE.pdf | 9 Jan 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY CERT CHANDAN HERITAGE.pdf | 9 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: GetUserDocumentFileContent.pdf | 21 Oct 2024 |
| Declaration in FORM BFile: AFFIDAVIT NEW.pdf | 21 Oct 2024 |
| Details of encumbrances concerned to LegalFile: GetUserDocumentFileContent.pdf | 21 Oct 2024 |
| Certificates of CA (Form 3)File: CA CERT 30-6-24.pdf | 10 Oct 2024 |
| Certificates of CA (Form 3)File: CA CERT 30-9-24.pdf | 10 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERT 30-06-24 RERA.pdf | 10 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: UNSOLD DETAILS 30-9-24.pdf | 10 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERT 29-4-24.pdf | 30 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGG CERT 2A 23-24.pdf | 30 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA CERT ANNUAL 23-24.pdf | 30 Apr 2024 |
| Declaration in FORM BFile: AFFIDAVIT RERA 28-4-24.pdf | 28 Apr 2024 |
| CERSAI detailsFile: CERSAI REPORT.pdf | 28 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: OTHER ORG FORMATS.pdf | 28 Apr 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DECL.pdf | 28 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: UNSOLD LIST 31-3-24.pdf | 12 Apr 2024 |
| Certificates of CA (Form 3)File: CA CERT 03 31-3-2024_.pdf | 12 Apr 2024 |
| Proforma of Agreement for saleFile: AGREEMENT FORMAT RERA REV.pdf | 12 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERT 31-3-24.pdf | 10 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENGG CERT 2A 23-24.pdf | 10 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CITY DEV Engg Certificate 311223.pdf | 11 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: CITY - UNSOLD 31-12-23.pdf | 11 Jan 2024 |
| Certificates of CA (Form 3)File: CITY DEV CA CERT 31-12-23_11zon.pdf | 11 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT FORMAT 30-9-23.pdf | 3 Oct 2023 |
| Declaration about Commencement CertificateFile: COMMENCEMENT FORMAT 30-9-23.pdf | 3 Oct 2023 |
| Declaration in FORM BFile: AAFIDAVIT 3-10-23.pdf | 3 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Rera 2A sept23.pdf | 3 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: UNSOLD SOLD LIST 30-9-23.pdf | 3 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENG 2A 22-23_11zon.pdf | 14 Jul 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA CERT ANNUAL 22-23 MRK_11zon.pdf | 14 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERT 22-23_11zon.pdf | 24 May 2023 |
| Certificates of CA (Form 3)File: CA CERT 22-23_11zon.pdf | 24 May 2023 |
| Certificates of CA (Form 3)File: CITY DEV CA CERT NEW.pdf | 15 Dec 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 a for rera 2021- 2022.pdf | 4 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2 a for rera 2021- 2022.pdf | 4 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: UNSOLD FORMAT 30-11-22.pdf | 4 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA CERT CITY DEV ANNUAL 21-22 rera.pdf | 4 Dec 2022 |
| Certificates of CA (Form 3)File: Full page photo.pdf | 12 Jun 2022 |
| Declaration about Commencement CertificateFile: DECL C C FORMAT_compressed.pdf | 30 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A.pdf | 30 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 02.pdf | 30 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: UNSOLD FORMAT RERA.pdf | 30 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CA Certificate FY 2018-19.PDF | 30 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA Certificate FY 2019-20.PDF | 30 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA Certificate FY 2020-21.PDF | 30 Sep 2021 |
| OtherFile: CORRECTION FORAMT C 01_compressed.pdf | 30 Sep 2021 |
| OtherFile: CORRECTION FORMAT C 02_compressed.pdf | 30 Sep 2021 |
| Building plan approvalFile: CC 02 RERA.pdf | 9 Sep 2021 |
| Layout approvalFile: PLAN COMBINE RERA REV.pdf | 9 Sep 2021 |
| Copy of Layout Approval (in case of layout)File: PLAN COMBINE RERA REV.pdf | 9 Sep 2021 |
| Building Plan Approval (IOD)File: CC 02 RERA.pdf | 9 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert 8-9-21.pdf | 9 Sep 2021 |
| Certificates of CA (Form 3)File: CA CERT RERA REV.pdf | 9 Sep 2021 |
| Proforma of Allotment letterFile: CITY DEVELOERS DRAFT RERA.pdf | 26 Oct 2020 |
| OtherFile: CREDAI REG.pdf | 12 Dec 2019 |
| Layout approvalFile: subdivision-min.pdf | 14 Oct 2019 |
| Layout approvalFile: plan 001.pdf | 14 Oct 2019 |
| Layout approvalFile: Plan 002.pdf | 14 Oct 2019 |
| PAN CardFile: PAN CARD CITY DEV .pdf | 14 Oct 2019 |
| Copy of the legal title reportFile: SEARCH MIN.pdf | 14 Oct 2019 |
| Details of encumbrancesFile: ANNX B min.pdf | 14 Oct 2019 |
| Details of encumbrancesFile: subdivision-min.pdf | 14 Oct 2019 |
| Copy of Layout Approval (in case of layout)File: subdivision-min.pdf | 14 Oct 2019 |
| Copy of Layout Approval (in case of layout)File: plan 001.pdf | 14 Oct 2019 |
| Copy of Layout Approval (in case of layout)File: Plan 002.pdf | 14 Oct 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: cc cert.pdf | 14 Oct 2019 |
| Declaration in FORM BFile: ANNX B min.pdf | 14 Oct 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 101 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep CHANDAN HERITAGE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near LOHEGAON D Y PATIL ROAD13,700+ in Pune
NESTERRA - PHASE 1
Triaa Skyscrapers LLP
Divine Garden Phase II
SHRIRAM ASSOCIATES
Divine Garden Phase 1
SHRIRAM ASSOCIATES
Solitaire Business Hub Viman Nagar Phase 1
Classic Promoters and Builders Private Lim
Krishna Lake Town
Krishna Housing
NIVASA ENCHANTE - PHASE I
NIVASA ASSOCIATES
Builder: CITY DEVELOPERS
CITY DEVELOPERS has 2 registrations on MahaRERA, including ADARSH TOWER and CHANDAN HERITAGE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if CHANDAN HERITAGE is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CHANDAN HERITAGE?
The registered promoter entity is CITY DEVELOPERS, an others as per the filing. Its GSTIN 27AADAC9891R1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CHANDAN HERITAGE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for CHANDAN HERITAGE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CHANDAN HERITAGE?
The professionals named in the filing: Architect: CUBIX ARCHITECT; Engineer: HARSHAL PISAL; Chartered Accountant: DHANANJAY JAMBHULKAR; Chartered Accountant: MRK AND COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CHANDAN HERITAGE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback