Home / Browse projects / Pune, Maharashtra / CHAITRANGAN

Completed No litigation declared Residential / Group Housing project

CHAITRANGAN

By DEDGE HOUSING DEVELOPMENT LLP

RG-MH-92990 · RERA P52100045554 · Last updated on MahaRERA portal: 25 Apr 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 125 documents Report an error

CHAITRANGAN is a Residential / Group Housing project by DEDGE HOUSING DEVELOPMENT LLP in Pune, Maharashtra, registered with MahaRERA as P52100045554 on 24 May 2022. The registration is recorded completed; possession was promised by 30 Jun 2025. The completion date has moved by 6 months from the original filing.

At a glance

Project

  • NameCHAITRANGAN
  • TypeResidential / Group Housing
  • Location
    • SINHAGAD ROAD
    • KIRKATWADI
    • Haveli
    • Pune
    • 411024
  • Pincode411024
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100045554
  • ReraGenie IDRG-MH-92990

Builder

  • NameDEDGE HOUSING DEVELOPMENT LLP
  • Entity typePartnership
  • GSTIN27AASFD6044K1ZY
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersMILIND RAMESH DEDGE, SACHIN ASHOK DEDGE, SUMEET NITIN DEDGE
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredMay 2022First promiseDec 2024Revised toJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 May 2022
  • Promised completion30 Jun 2025
  • Revised completionRevised to 30 Jun 2025 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed125 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CHAITRANGAN PHASE 1NA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

CHAITRANGAN PHASE 1: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed68

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots68
Open Space68

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,250 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
NAMDEV SAYAJI HAGAWANE & OTHERSKIRKATWADIPune
VITTHAL SAYAJI HAGAWANE & OTHERSKIRKATWADIPune
MILIND RAMESH DEDGE & OTHERSKIRKATWADIPune
SHASHIKANT RANCHANDRA DEDGE & OTHERSKIRKATWADIPune

Approvals and building plan

Permissible FSI7978.54
Proposed, not sanctioned7,979 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPoorva Shrusti Building Next To Lokmat, Sinhagad Road Pune 41

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYASH DESAI
ArchitectAbhishek Panse Architects
EngineerSANTOSH PADSAGALE
EngineerSandeep kisanrao Landge
Chartered AccountantPATEL & SHARMA
PartnerRole in project
DEDGE HOUSING DEVELOPMENT LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100027332Dec 2024 → Jun 2025

Reason as filed by the promoterSupply chain disruptions and increased lead times for the delivery of essential construction materials, such as cement, steel, and other building components, have caused delays in the construction schedule. The scarcity of these materials in the local market and price volatility have further compounded the problem, leading to intermittent halts in construction activities. Additionally, there has been a marked shortage of both skilled and unskilled labour in the construction sector, adversely affecting the developer's capacity to sustain the required workforce levels necessary for the continuou

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 May 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Apr 2025

Documents filed125

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 125 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf25 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Dedge Completion Certificate - Full OC.pdf25 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf25 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf21 Apr 2025
Deviation Report with respect to Allotment letterFile: 11 Draft Deviation Report Allotment Letter .pdf22 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 10 Disclosure of Interest - Milind Dedge .pdf22 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 10 Disclosure of Interest - Sachin Dedge .pdf22 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 10 Disclosure of Interest - Sumeet Dedge .pdf22 Feb 2025
Other - TechnicalFile: Schedule for Pending Activities .pdf13 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 01 Form- 2A 2022-23 .pdf13 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 01 Form- 2A 2023-24 .pdf13 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: dedge housing dec24 form 3 final_signed (2).pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 01-01-25 to 31-03-25.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold 05-02-25.pdf5 Feb 2025
Declaration in FORM BFile: 03 From B.pdf28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Q3.pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Q3.pdf28 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Rera Audit From 5.pdf7 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 01-10-24 to 31-12-24.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 01-10-24 to 31-12-24.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 01-10-24 to 31-12-24.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 20-07-24 (2).pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf11 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf11 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3.pdf11 Jul 2024
Layout approvalFile: Layout.pdf24 Jun 2024
Copy of Layout Approval (in case of layout)File: Layout.pdf24 Jun 2024
Disclosure of sold/ booked inventoryFile: Revised Declaration about Sold Unsold - March 2024.pdf24 Jun 2024
Disclosure of sold/ booked inventoryFile: 1 July to Sept 22 Updated.pdf21 Jun 2024
Disclosure of sold/ booked inventoryFile: 2 Oct To Dec 22 Updated.pdf21 Jun 2024
Disclosure of sold/ booked inventoryFile: 3 Jan To March 23 Updated.pdf21 Jun 2024
Disclosure of sold/ booked inventoryFile: 4 April to June 23 Updated.pdf21 Jun 2024
Disclosure of sold/ booked inventoryFile: 5 July to Sept 23 Updated.pdf21 Jun 2024
Disclosure of sold/ booked inventoryFile: 6 Oct to Dec 23 updated.pdf21 Jun 2024
Disclosure of sold/ booked inventoryFile: 7 Jan To March 24 updated.pdf21 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf21 Jun 2024
Building plan approvalFile: HPSCANNER0159.pdf27 May 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER0159.pdf27 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Revised CC_compressed.pdf3 May 2024
Declaration about Commencement CertificateFile: Declaration about commencement.pdf3 May 2024
Layout approvalFile: 1-6.pdf2 May 2024
Building plan approvalFile: 2-6 f.pdf2 May 2024
Building plan approvalFile: 3-6 f.pdf2 May 2024
Building plan approvalFile: 4-6 f.pdf2 May 2024
Building plan approvalFile: 5-6.pdf2 May 2024
Building plan approvalFile: 6-6.pdf2 May 2024
Copy of Layout Approval (in case of layout)File: 1-6.pdf2 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 2-6 f.pdf2 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 3-6 f.pdf2 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 4-6 f.pdf2 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 5-6.pdf2 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 6-6.pdf2 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - March 24.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_March 24.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_March 24.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cetrificate.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cetrificate.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf17 Jan 2024
Building plan approvalFile: 1 Plan_compressed.pdf4 Jan 2024
Building plan approvalFile: 2 Plan_compressed.pdf4 Jan 2024
Building plan approvalFile: 4 Plan_compressed.pdf4 Jan 2024
Building plan approvalFile: 5 Plan_compressed.pdf4 Jan 2024
Building plan approvalFile: 6 Plan_compressed.pdf4 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 Plan_compressed.pdf4 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 Plan_compressed.pdf4 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 4 Plan_compressed.pdf4 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 5 Plan_compressed.pdf4 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 6 Plan_compressed.pdf4 Jan 2024
Declaration about Commencement CertificateFile: Declaration About CC.pdf4 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf21 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold Inventory.pdf20 Nov 2023
Building plan approvalFile: Saction Plan.pdf16 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Saction Plan.pdf16 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: NEW CC.pdf16 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf30 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf30 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed_compressed.pdf14 Oct 2023

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 6 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CHAITRANGAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KIRKATWADI13,700+ in Pune

2 kmCHAITRANGANCompleted 24Lapsed / revoked 20Other 30Dot size: filed unitsN

Filed coordinates, straight-line distance. 74 registered projects within 2 km.

Builder: DEDGE HOUSING DEVELOPMENT LLP

DEDGE HOUSING DEVELOPMENT LLP has 2 registrations on MahaRERA, including CHAITRANGAN and CHAITRANGAN PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if CHAITRANGAN is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CHAITRANGAN?

The registered promoter entity is DEDGE HOUSING DEVELOPMENT LLP, a partnership as per the filing. Its GSTIN 27AASFD6044K1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CHAITRANGAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CHAITRANGAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CHAITRANGAN?

The professionals named in the filing: Architect: YASH DESAI; Architect: Abhishek Panse Architects; Engineer: SANTOSH PADSAGALE; Engineer: Sandeep kisanrao Landge; Chartered Accountant: PATEL & SHARMA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CHAITRANGAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CHAITRANGAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CHAITRANGAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.