ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / Central Heights 3

Registered No litigation declared Residential / Group Housing project

Central Heights 3

By NIRMAAN INFRA

RG-MH-96139 · RERA P50500053562 · Last updated on MahaRERA portal: 16 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
5 of 33Construction stages doneacross 3 buildings; furthest along: External plumbing and external plaster, 75%
128 of 162Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

Central Heights 3 is a Residential / Group Housing project by NIRMAAN INFRA in Nagpur, Maharashtra, registered with MahaRERA as P50500053562 on 10 Nov 2023. Possession is promised by 31 Dec 2028. 34 of the 162 units on this registration are recorded sold or booked, and 5 of 33 construction stages are filed complete.

At a glance

Project

  • NameCentral Heights 3
  • TypeResidential / Group Housing
  • Location
    • Besa - Pipla Road
    • Pipla
    • Nagpur (Rural)
    • Nagpur
    • 440034
  • Pincode440034
  • RERA no.P50500053562
  • ReraGenie IDRG-MH-96139

Builder

  • NameNIRMAAN INFRA
  • Entity typePartnership
  • GSTIN27AASFN5950G1ZS
  • PartnersMilind Prabhakar Bhawsar, Ratnesh Sudhakarsa Paralkar, Aniket Jagannath Khandaskar, Satish Vasant Belsare, Archana Sandeep Madurwar, Ashish Arun Nilawar, Jitendra Manindranath Bose, Ashok Dhirubhai Bhuva, Vinod Ramesh Paralikar, Varsha Rajendra Kondawar, Snehal Damodhar Dandekar
  • Other registrations2 more →

Key dates

this monthRegisteredNov 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Nov 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings3 building records
  • Documents filed81 files

Current status

21%34 of 162 units booked
19.6%Work done, per cost certificate

Figures as on 16 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D Wing SARA HEIGHTSNA9756056
Block - H MRUNALNA9756056
Block - I AROHINA9750050

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is External plumbing and external plaster, at 75%.

D Wing SARA HEIGHTS53%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure7%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block - H MRUNAL0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block - I AROHI0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed204

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots204
Closed/Covered204
BuildingClosed/CoveredTotal
D Wing SARA HEIGHTS6969
Block - H MRUNAL7272
Block - I AROHI6363

Land and ownership11

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,640 sq m
Land owned byThe promoter, with other names on the file
Named landowners11
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Jul 2026
LandownerVillageDistrict
MR. ASHOK D. BHUVANagpur (M Corp.)Nagpur
MR. ASHISH A NILAWARNagpur (M Corp.)Nagpur
MR. JITENDRA M. BOSENagpur (M Corp.)Nagpur
SMT. VARSHA R. KONDAWARNagpur (M Corp.)Nagpur
MR. ANIKET J. KHANDASKARNagpur (M Corp.)Nagpur
MR. SATISH V. BELSARENagpur (M Corp.)Nagpur
MRS. ARCHANA S. MADURWARNagpur (M Corp.)Nagpur
MR. MILIND P. BHAWSARNagpur (M Corp.)Nagpur
MR. RATNESH S PARALKARNagpur (M Corp.)Nagpur
MR. VINOD R PARALIKARNagpur (M Corp.)Nagpur
MR. DAMODHARRAO S. DANDEKARNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNagpur Metropolitan Regional Development Authority
Permissible FSI9589.25
Proposed, not sanctioned9,589 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBESA, NAGPUR - 440037
Estimated costRs 20.47 cr
Cost incurredRs 4.02 cr
Work done19.64%
BuildingWingEstimatedIncurred
D Wing SARA HEIGHTSNARs 6.81 crRs 4.02 cr
Block - H MRUNALNARs 6.81 cr-
Block - I AROHINARs 5.84 cr-
-NARs 1.00 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSanjay Basantani
ArchitectSSB ASSOCIATES
EngineerDevendra Nathabhai Patel
EngineerDEVBHUMI CONSULTANTS
Chartered AccountantGKJ And Associates
Chartered AccountantGKJ & Associates
PartnerRole in project
NIRMAAN INFRA-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect_CH3.pdf16 Jul 2026
Withdrawal Update Form 2File: Engineer_CH3.pdf16 Jul 2026
Withdrawal Update Form 3File: CA_CH3.pdf16 Jul 2026
Withdrawal Update Form 1File: Architect_CH3.pdf20 Apr 2026
Withdrawal Update Form 2File: Engineer_CH3.pdf20 Apr 2026
Withdrawal Update Form 3File: CA_CH3.pdf20 Apr 2026
Withdrawal Update Form 1File: Architect_CH3.pdf19 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate_CH3.pdf19 Jan 2026
Withdrawal Update Form 3File: CA Certificate_CH3_compressed.pdf19 Jan 2026
Withdrawal Update Form 1File: Architect Certificate_CH3.pdf17 Oct 2025
Withdrawal Update Form 2File: Engineer Certificate_CH3.pdf17 Oct 2025
Withdrawal Update Form 3File: CA Certificate_CH3.pdf17 Oct 2025
Withdrawal Update Form 1File: Architect_CH3.pdf17 Jul 2025
Withdrawal Update Form 2File: Engineer_CH3.pdf17 Jul 2025
Withdrawal Update Form 3File: CA_CH3.pdf17 Jul 2025
Withdrawal Update Form 1File: Arch_CH3_update.pdf30 May 2025
Withdrawal Update Form 2File: Engr_CH3_update.pdf30 May 2025
Withdrawal Update Form 3File: CA_CH3_update.pdf30 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect C H 3.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A C h 3_compressed.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer C H 3.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: inventory C H 3_compressed.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_CH3.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_CH3_compressed.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_CH3.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: sold unsold inventory_CH3.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-CH3.pdf17 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-CH3_comp.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate-CH-3.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: sold booked inventory-CH3_comp.pdf17 Oct 2024
Proforma of Agreement for saleFile: ATS Draft-CH3-RERA.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect central heights-3.pdf13 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer central heights-3.pdf13 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Central heights -3_compressed.pdf13 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A central heights-3_compressed.pdf13 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch - ch 3.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: devbhumi - ch 3.pdf16 Apr 2024
Disclosure of sold/ booked inventoryFile: sold unsold - ch 3.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca - ch 3_compressed.pdf16 Apr 2024
Proforma of Agreement for saleFile: Agreement to Sale.pdf6 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch-CH3.pdf11 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Devbhumi - CH3.pdf11 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure - CH3_compressed.pdf11 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA-CH3_compressed.pdf11 Jan 2024
Proforma of Agreement for saleFile: 36 Agreement to Sale new.pdf25 Aug 2023
Copy of the legal title reportFile: 2 Legal Title Report new.pdf1 Aug 2023
Details of encumbrances concerned to FinanceFile: 3 Declaration concerned to Finance.pdf1 Aug 2023
Details of encumbrances concerned to LegalFile: 3 Declaration concerned to Finance.pdf1 Aug 2023
CERSAI detailsFile: 22 Cersai Search.pdf1 Aug 2023
Deviation Report with respect to model copy of AgreementFile: 53 Deviation Report Agreement To sale New.pdf1 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Ashok Bhuva.pdf22 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Ashish Nilawar.pdf22 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 3 Jitendra Bose.pdf22 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 4 Varsha Kondawar.pdf22 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 5 Aniket Khandaskar.pdf22 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 6 Satish Belsare.pdf22 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 7 Archana Madurwar.pdf22 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 8 Milind Bhawsar.pdf22 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 9 Ratnesh Paralkar.pdf22 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 10 Vinod Paralikar.pdf22 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 11 Damodhar Dandekar.pdf22 Jul 2023
Declaration in FORM BFile: Form B.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 15 Architect Certificate.pdf21 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 23 CA Certificate.pdf21 Jul 2023
Proforma of Allotment letterFile: 42 Allotment Letter NEW.pdf21 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 51 Separate Bank Details new.pdf21 Jul 2023
Layout approvalFile: 5 Layout Approval.pdf26 Jun 2023
Building plan approvalFile: 7 Building Plan Block D.pdf26 Jun 2023
Building plan approvalFile: 8 Building Plan Block H.pdf26 Jun 2023
Building plan approvalFile: 9 Building Plan Block I.pdf26 Jun 2023
PAN CardFile: 1 PAN -PDF.pdf26 Jun 2023
Details of encumbrances concerned to FinanceFile: 4 Declaration concerned to Legal.pdf26 Jun 2023
Details of encumbrances concerned to LegalFile: 4 Declaration concerned to Legal.pdf26 Jun 2023
Copy of Layout Approval (in case of layout)File: 5 Layout Approval.pdf26 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 7 Building Plan Block D.pdf26 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 8 Building Plan Block H.pdf26 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: 9 Building Plan Block I.pdf26 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: 11 Commencement Certificate (Building Permit).pdf26 Jun 2023
Declaration about Commencement CertificateFile: 12 Declaration about Commencement Certificate.pdf26 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 16 Engineer's Certificate.pdf26 Jun 2023

How this compares with Nagpur

21%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Central Heights 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pipla2,800+ in Nagpur

Builder: NIRMAAN INFRA

NIRMAAN INFRA has 3 registrations on MahaRERA, including Central Heights 1 and Central Heights 3. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Central Heights 3 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Central Heights 3?

The registered promoter entity is NIRMAAN INFRA, a partnership as per the filing. Its GSTIN 27AASFN5950G1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Central Heights 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Central Heights 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Central Heights 3?

The professionals named in the filing: Architect: Sanjay Basantani; Architect: SSB ASSOCIATES; Engineer: Devendra Nathabhai Patel; Engineer: DEVBHUMI CONSULTANTS; Chartered Accountant: GKJ And Associates; Chartered Accountant: GKJ & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Central Heights 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Central Heights 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Central Heights 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.