ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Castalia

Registered Litigation declared Residential / Group Housing project

Castalia

By Triax Developers LLP

RG-MH-59385 · RERA P51800031613 · Last updated on MahaRERA portal: 6 Aug 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 3 cases
  • 2 complaints at MahaRERA
  • Completion date moved by 15 months
  • 1 extension taken

Clear

  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 15 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 98%
23 of 310Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 205 documents Report an error

Castalia is a Residential / Group Housing project by Triax Developers LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800031613 on 3 Nov 2021. Possession is promised by 31 Mar 2027. The completion date has moved by 15 months from the original filing. 287 of the 310 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameCastalia
  • TypeResidential / Group Housing
  • Location
    • New Link Road
    • Kandivali West
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800031613
  • ReraGenie IDRG-MH-59385

Builder

  • NameTriax Developers LLP
  • Entity typeOthers
  • Named personsChitrang Motiwala, Hiten Sheth, Milan Sheth

Key dates

this monthRegisteredNov 2021First promiseDec 2025Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 Nov 2021
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed205 files

Current status

93%287 of 310 units booked
78.1%Work done, per cost certificate

Figures as on 6 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CastaliaNA47433100310

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 98%.

Castalia: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor96%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises1%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.64%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.55%

Progress on shared amenities15

As on 6 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes37%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes70%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed488

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots488
Closed/Covered488

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,207 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Jul 2025
LandownerVillageDistrict
Penrose Constructions LLP (As Development Manager)Mumbai CityMumbai City

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI29049.61
Proposed, not sanctioned29,050 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGalleria Shopping Mall, Hiranandani Gardens, Powai, Mumbai 400 076
Estimated costRs 241.53 cr
Cost incurredRs 188.53 cr
Work done78.06%
BuildingWingEstimatedIncurred
CastaliaNARs 226.42 crRs 178.40 cr
-NARs 15.11 crRs 10.13 cr

Certifying professionals and partners11

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectQutub Mandviwala
ArchitectMr. Manoj V. Daisaria
EngineerMahimtura consultants Pvt. Ltd
EngineerDattaram Dhakne
Chartered AccountantAnand Yadav
Chartered AccountantShailesh Laddha
Chartered AccountantVikas Shukla
Chartered AccountantDinesh Rajgor
Chartered AccountantMNJ & Associates
Chartered AccountantP S S V & Associates LLP.
Chartered AccountantManikandan Perumal
PartnerRole in project
Triax Developers LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA03122518505Dec 2025 → Mar 2027

Reason as filed by the promoterThe earlier proposed date of completion of CASTALIA (hereinafter referred to as “Project”), as registered with MahaRERA was 31/12/2025 and that the completion of the Project has been delayed due to circumstances beyond the reasonable control of TRIAX DEVELOPERS LLP (hereinafter referred to as “Promoter”), including delays in issuance of certain statutory permissions/approvals by the concerned authorities and other administrative factors. Having said that, the Promoter, has received all the requisite approvals as below: 1. Rehab Bldg 1 - Full OC (dt. 17/10/2025) 2. Rehab Bldg 2 - Full OC (dt. 1

Litigation declared3

CaseCourtStatus
WP 2967/2021/2021High CourtAdmission
WP 153/2023/2023High CourtPre Admission
WP 2967/2021/2021High CourtOngoing

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12600503Abhishek Ambadas ShendeTriax Developers LLP29/01/2026
CC12601069Mithil Chandulal VithlaniTriax Developers LLP26/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed205

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 205 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Catsalia Form 1-Jun26 QPR.pdf6 Aug 2026
Withdrawal Update Form 2File: Catsalia Form 2-Jun26 QPR.pdf6 Aug 2026
Withdrawal Update Form 3File: Catsalia Form 3-Jun26 QPR.pdf6 Aug 2026
Form 2A (FY 2025-2026)File: Form - 2A_Executed_Castalia_Secured.pdf12 May 2026
Withdrawal Update Form 1File: Form 1-Castalia_Mar26 QPR.pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2-Castalia_Mar26 QPR.pdf21 Apr 2026
Withdrawal Update Form 3File: Form 3-Castalia_Mar26 QPR.pdf21 Apr 2026
Building plan approvalFile: 1- Layout Plan_Castalia.pdf18 Mar 2026
Building plan approvalFile: 2- Ground Floor Plan- Castalia.pdf18 Mar 2026
Building plan approvalFile: 3_1st Podium Plan.pdf18 Mar 2026
Building plan approvalFile: 4- 2nd Podium Plan.pdf18 Mar 2026
Building plan approvalFile: 5_3rd Podium Plan.pdf18 Mar 2026
Building plan approvalFile: 6_4th Podium Plan.pdf18 Mar 2026
Building plan approvalFile: 7-5th Podium Plan.pdf18 Mar 2026
Building plan approvalFile: 8_6th Podium Plan.pdf18 Mar 2026
Building plan approvalFile: 9_7th Podium Plan.pdf18 Mar 2026
Building plan approvalFile: 10_8th Podium Plan.pdf18 Mar 2026
Building plan approvalFile: 11- Amenity Floor Plan.pdf18 Mar 2026
Building plan approvalFile: 12- Area Line Diagram for 9th Podium.pdf18 Mar 2026
Building plan approvalFile: 13_Area Line Diagram for 3rd to 6th_8th Podium.pdf18 Mar 2026
Building plan approvalFile: 14-Typical Floor Plan.pdf18 Mar 2026
Building plan approvalFile: 15-Terrace Floor Plan.pdf18 Mar 2026
Building plan approvalFile: 16- Refuge Floor Plan.pdf18 Mar 2026
Building plan approvalFile: 17- Refuge Floor Plan - 33rd Floor.pdf18 Mar 2026
Building plan approvalFile: 18- Section 1-1.pdf18 Mar 2026
Building plan approvalFile: 19- Section -2 - 2.pdf18 Mar 2026
Building plan approvalFile: 20- Section 3-3.pdf18 Mar 2026
Building plan approvalFile: 21- Section 4-4.pdf18 Mar 2026
Building plan approvalFile: 22- Section 5-5.pdf18 Mar 2026
Building plan approvalFile: 23- Podium Elevation.pdf18 Mar 2026
Withdrawal Update Form 1File: Form 1_200226.pdf6 Mar 2026
Withdrawal Update Form 2File: Form 2_200226.pdf6 Mar 2026
Withdrawal Update Form 3File: Form 3_240226.pdf6 Mar 2026
Form 5 (FY 2024-2025)File: Form_5_271225.pdf4 Mar 2026
Withdrawal Update Form 1File: Form - 1 - Castalia -Sep25-Secured.pdf17 Oct 2025
Withdrawal Update Form 2File: Form - 2 - Castalia -Sep25-Secured.pdf17 Oct 2025
Withdrawal Update Form 3File: Form - 3 - Castalia -Sep25-Secured.pdf17 Oct 2025
Withdrawal Update Form 1File: Form 1 Castalia Jun 25.pdf23 Jul 2025
Withdrawal Update Form 2File: Form 2 Castalia Jun 25.pdf23 Jul 2025
Withdrawal Update Form 3File: Form 3 Castalia Jun 25.pdf23 Jul 2025
Form 2A (FY 2024-2025)File: Castalia Form 2A Quality Mar25.pdf30 Jun 2025
Form 1File: Form 1 Castalia Mar 25.pdf19 Jun 2025
Form 2File: Form 2 Castalia Mar 25.pdf19 Jun 2025
Form 3File: Form 3 Castalia Mar 25.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Castalia Mar 25.pdf19 Jun 2025
Form 1File: Form 1 Castalia Dec24.pdf19 Jun 2025
Form 2File: Form 2 Castalia Dec24.pdf19 Jun 2025
Form 3File: Form 3 Castalia Dec24.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Castalia Dec24.pdf19 Jun 2025
Form 1File: Castalia Form 1 Sep 24.pdf19 Jun 2025
Form 2File: Castalia Form 2 Sep 24.pdf19 Jun 2025
Form 3File: Castalia Form 3 Sep 24.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold - Booked Inventory Sep 24.pdf19 Jun 2025
Form 1File: Form 1 Jun24.pdf19 Jun 2025
Form 2File: Form 2 Jun24.pdf19 Jun 2025
Form 3File: Form 3 Jun24.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory.pdf19 Jun 2025
Form 1File: Castalia Form 1 Mar24.pdf19 Jun 2025
Form 2File: Castalia Form 2 Mar24.pdf19 Jun 2025
Form 3File: Castalia Form 3 Mar24.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD Castalia Mar24.pdf19 Jun 2025
Form 1File: Form 1 Dec 23.pdf19 Jun 2025
Form 2File: Form 2 Dec 23.pdf19 Jun 2025
Form 3File: Form 3 Dec 23.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Dec 23.pdf19 Jun 2025
Form 1File: Form 1 Castalia Sept23.pdf19 Jun 2025
Form 2File: Form 2 Castalia Sept23.pdf19 Jun 2025
Form 3File: Form 3 Castalia Sept23.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory as on 30092023.PDF19 Jun 2025
Form 1File: Castalia Form1 June'23.pdf19 Jun 2025
Form 2File: Castalia Form2 June'23.pdf19 Jun 2025
Form 3File: Castalia June 23 Form - 3.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory Jun'23_Optimized.pdf19 Jun 2025
Form 1File: Architects Certificate 31032023.pdf19 Jun 2025
Form 2File: Engineers Certificate 31032023.pdf19 Jun 2025
Form 3File: Form 3 31032023.pdf19 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Inventory Mar'23_Optimized.pdf19 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Castalia Mar 25.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Castalia Mar 25.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Castalia Mar 25.pdf23 Apr 2025

How this compares with Mumbai Suburban

93%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 15 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Castalia on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kandivali West6,700+ in Mumbai Suburban

2 kmCastaliaCompleted 113Lapsed / revoked 70Other 153Dot size: filed unitsN

Filed coordinates, straight-line distance. 336 registered projects within 2 km.

Builder: Triax Developers LLP

Triax Developers LLP has 1 registration on MahaRERA, including Castalia. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Castalia is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Castalia?

The registered promoter entity is Triax Developers LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Castalia?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Castalia?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Castalia?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Castalia?

The professionals named in the filing: Architect: Qutub Mandviwala; Architect: Mr. Manoj V. Daisaria; Engineer: Mahimtura consultants Pvt. Ltd; Engineer: Dattaram Dhakne; Chartered Accountant: Anand Yadav; Chartered Accountant: Shailesh Laddha. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Castalia?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Castalia. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Castalia to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.