CANDEUR ICON PHASE II
RG-KA-91708 · RERA PRM/KA/RERA/1251/446/PR/311026/009067 · Last updated on RERA Karnataka portal: 13 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Nothing adverse is on this record. The buyer report still lays out every unit and the land chain as filed and places this filing against the promoter's other registrations.
See what the report covers Free either way: .Saved.
CANDEUR ICON PHASE II is a Mixed Development project by M/s CANDEUR CONSTRUCTIONS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/311026/009067 on 31 Oct 2026. Possession is promised by 1 Aug 2032.
At a glance
Project
- NameCANDEUR ICON PHASE II
- TypeMixed Development
- Location
- Bengaluru East
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/446/PR/311026/009067
- ReraGenie IDRG-KA-91708
Builder
- NameM/s CANDEUR CONSTRUCTIONS
- Entity typePartnership Firm
- GSTIN29AAPFC8451Q1ZF
- Authorized SignatoryKatamreddy Srikanth Reddy
- Other registrations3 more →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on31 Oct 2026
- Promised completion1 Aug 2032
- Revised completionNone
- Buildings6 building records
- Documents filed756 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| G | - | - | - | - | - | 196 |
| H | - | - | - | - | - | 196 |
| I | - | - | - | - | - | 260 |
| J | - | - | - | - | - | 191 |
| VILLAMENTS | - | - | - | 7 | 0 | 7 |
| COMMERCIAL 2 | - | - | - | 6 | 0 | 6 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 13 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities40
As on 13 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | Yes | - |
| Solid waste management and disposal | Yes | - |
| Emergency Evacuation services | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas | Yes | - |
| Provision for lodging of management staff and security staff | Yes | - |
| Water conservation and renewable energy | Yes | - |
| Common storage spaces | Yes | - |
Land and ownership85
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Nagendra Puthamakula | - | - |
| Smt. Shanti Puthamakula and Others | - | - |
| Smt. Shanti Puthamakula and Others | - | - |
| Smt. Shanti Puthamakula and Others | - | - |
| M/s. Nikhar Estates LLP by P. Nagendra | - | - |
| M/s. Nikhar Estates LLP by P. Nagendra | - | - |
| Satvik Developers | - | - |
| Ashok Kumar and Others | - | - |
| Ashok Kumar and others | - | - |
| Sathvik Developers (Ashok Kumar) | - | - |
| Satvik Developers | - | - |
| Nikhar Estates LLP (Nagendhra Puthamakula) | - | - |
| Satvik Developers | - | - |
| R Ravi Kant Singal & Others | - | - |
| Mr. Krishan Kumar and Others | - | - |
| Mr. Kali Vamsi Krishna | - | - |
| Smt. Swati Kumari and others | - | - |
| Mr. Veerendrapratap Singh and Others | - | - |
| Mrs. Deepthi Vodapalli and Others | - | - |
| Mrs. Deepthi Vodapalli and Others | - | - |
| Mrs Shreelakshmi Janardhanan Nallasura and Others | - | - |
| Mrs Shreelakshmi Janardhanan Nallasura and Others | - | - |
| Segu Praveen Kumar and Others | - | - |
| Segu Praveen Kumar and Others | - | - |
| Segu Praveen Kumar and Others | - | - |
| BK Venugopal | - | - |
| Smt. Chaithanya Patibandla and others | - | - |
| Mrs. Helo Tena Leno and Others | - | - |
| Mrs. Helo Tena Leno and Others | - | - |
| Helo Tena Leno and Others | - | - |
| Smt. Shanti Puthamakula and One | - | - |
| Shanti P | - | - |
| M/s. Winterberry Dreamspace LLP | - | - |
| M/s. Winterberry Dreamspace LLP | - | - |
| M/s. Nikhar Estates LLP | - | - |
| M/s. Nikhar Estates LLP | - | - |
| M/s. Winterberry Dreamspace LLP | - | - |
| M/s. Nikhar Estates LLP | - | - |
| GK Dhanaraj | - | - |
| GK Nagaraj | - | - |
| GC Jagadhish | - | - |
| M/s. Nelvie Develpers LLP | - | - |
| Shanti P | - | - |
| Sathyanarayana | - | - |
| WINTERBERRY DREAMSPACE LLP | - | - |
| M/s. Pasupati Barter LLP | - | - |
| Nagendra Puthamakula | - | - |
| GM VENUGOPAL | - | - |
| G Vedavathi | - | - |
| Smt. Gowramma | - | - |
| Purushotham GA and Others | - | - |
| Purushotham GA and Others | - | - |
| Purushotham GA and Others | - | - |
| Smt. Mallamma and Others | - | - |
| Smt. Mallamma and Others | - | - |
| G K Suresh | - | - |
| V. Ramaiah | - | - |
| Smt. B.R. Harishilpa | - | - |
| Raghu B S and Others | - | - |
| M/s. Nikhar Estates LLP | - | - |
| Mr. Krishan Kumar and Others | - | - |
| GR NARENDRA KUMAR | - | - |
| GM Rajendra Babu | - | - |
| HS SUDHAMANI | - | - |
| CHALAMA REDDY | - | - |
| Pandiyan G | - | - |
| GC Narayanappa | - | - |
| Smt. G. Vedavathi | - | - |
| Dr. KS Ramesh | - | - |
| Smt. G. Vedavathi | - | - |
| Smt. Shanti Puthamakula and One | - | - |
| GC Jagadhish | - | - |
| GN RAMACHANDRAIAH | - | - |
| M/s. Pasupati Barter LLP | - | - |
| GR Savitha | - | - |
| SATYANARAYANA | - | - |
| V Chandraiah | - | - |
| GN Ramachandraiah | - | - |
| GR Savitha | - | - |
| Harish GM | - | - |
| Sanjay GA | - | - |
| GN RAMACHANDRAIAH | - | - |
| G R Thimma Reddy | - | - |
| G R Thimma Reddy and Others | - | - |
| G R Thimma Reddy and Others | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 501.16 cr | - |
| Other Cost | Rs 47.02 cr | - |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 41.59 cr | - |
| Payment of taxes | Rs 9.63 cr | - |
| On-site expenditure-Site Overhead | Rs 4.47 cr | - |
| On-site expenditure-Consultants Fees | Rs 4.12 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Bommu Veera Narendranath Reddy |
| Engineer | Ramesh B |
| Chartered Accountant | Rama Krishna Animireddi |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed756
As listed on the registration, under the names the promoter filed them with; the newest 80 of 756 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/311026/009067 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| FORM-1 CA CERTIFICATEFile: FORM-1 CA CERTIFICATE.pdf | 13 Oct 2026 |
| CLARIFICATION FOR NO FINANCIALSFile: Clarification for No Previous FInancial Statements.pdf | 13 Oct 2026 |
| SOURCE OF FUNDSFile: Acc Source of Fund Phase II.pdf | 13 Oct 2026 |
| FORM-6 ENGINEER CERTIFICATEFile: FORM-6 ENGINEER CERTIFICATE.pdf | 13 Oct 2026 |
| FORM-2 ARCHITECT CERTIFICATEFile: FORM-2 ARCHITECT CERTIFICATE.pdf | 13 Oct 2026 |
| NO SALES CLARIFICATIONFile: Clarification for Previous Projects Sales.pdf | 13 Oct 2026 |
| FORM-B AFFIDAVITFile: Affidavit Form B Ph 2.pdf | 13 Oct 2026 |
| SECTION-3 AFFIDAVITFile: Affidavit Section 3 Ph II.pdf | 13 Oct 2026 |
| NON LITIGATION AFFIDAVITFile: Affidavit NonLitigation Ph 2.pdf | 13 Oct 2026 |
| BANK AFFIDAVITFile: Affidavit Bank Ph 2.pdf | 13 Oct 2026 |
| JD DECLARATION AFFIDAVITFile: Affidavit Cum Declaration Ph 2.pdf | 13 Oct 2026 |
| PHASE WISE DECLARATION AFFIDAVITFile: Affidavit Phase Wise updated.pdf | 13 Oct 2026 |
| PHASE WISE AREA AND UNIT DETAILSFile: PHASE WISE UNIT DETAILS UPDATED.pdf | 13 Oct 2026 |
| PHASE WISE DEMARKATION PLANFile: Phasewise Demarcation in Plan.pdf | 13 Oct 2026 |
| ADVOCATE SEARCH REPORTFile: Legal Opinion compressed.pdf | 13 Oct 2026 |
| DP PLAN ORDERFile: Plan Approval Letter DP.pdf | 13 Oct 2026 |
| DP PLANFile: Plan Approval DP.pdf | 13 Oct 2026 |
| ADLR SURVEY SKETCHFile: ADLR Survey Sketch.PDF | 13 Oct 2026 |
| CDP MASTER PLAN DEMARKATEDFile: CDP Map.pdf | 13 Oct 2026 |
| VILLAGE MAP DEMARKATEDFile: Village Map with demarkation.pdf | 13 Oct 2026 |
| VILLAGE MAPFile: GUNJURU VILLAGE MAP.pdf | 13 Oct 2026 |
| COMMENCEMENT CERTIFICATE CLARIFICATIONFile: TCP Clarification for Commencement Certificate I &II.pdf | 13 Oct 2026 |
| KSPCB CLARIFICATIONFile: KSPCB NOC CLARIFICATION.pdf | 13 Oct 2026 |
| PHASE WISE DEMARKATED PLANFile: Phasewise Demarcation in Plan.pdf | 13 Oct 2026 |
| KTCP NOC CLARIFICATIONFile: TCP Clarification for KTCP NOC Phase II.pdf | 13 Oct 2026 |
| CLARIFICATION ON FACILITIESFile: TCP Clarification for Facilities Provided Phase II.pdf | 13 Oct 2026 |
| CLARIFICATION ON AMENITIESFile: Eng Clarification for Aminities Phase II.pdf | 13 Oct 2026 |
| PROJECT SPECIFICATIONFile: Eng Clarification for Specifications Phase II.pdf | 13 Oct 2026 |
| BROCHURE CLARIFICATIONFile: CLARIFICATION FOR NO BROCHURE.pdf | 13 Oct 2026 |
| LOCATION DETAILSFile: Location Map.pdf | 13 Oct 2026 |
| CLARIFICATION ON RelinquishmentFile: TCP Clarification for Relinquishment Phase II.pdf | 13 Oct 2026 |
| NOC AAIFile: NOC AAI.pdf | 13 Oct 2026 |
| NOC BESCOMFile: NOC BESCOM.pdf | 13 Oct 2026 |
| NOC BSNLFile: NOC BSNL.pdf | 13 Oct 2026 |
| NOC KSPCBFile: NOC KSPCB.pdf | 13 Oct 2026 |
| NOC SEIAAFile: NOC Environment.pdf | 13 Oct 2026 |
| NOC FIREFile: NOC FIRE.pdf | 13 Oct 2026 |
| NOC HALFile: NOC HAL.pdf | 13 Oct 2026 |
| NOC KSRSAC HALFile: NOC KSRSAC HAL.pdf | 13 Oct 2026 |
| PHASE WISE AREA PARKING DETAILSFile: PARKING CLARIFICATION PHASE 2.pdf | 13 Oct 2026 |
| FORM-6 ENGINEER CERTIFICATEFile: FORM-6 ENGINEER CERTIFICATE.pdf | 13 Oct 2026 |
| SECTIONAL DRAWINGSFile: SECTIONAL DRAWINGS.pdf | 13 Oct 2026 |
| SECTIONAL DRAWING ALLFile: Plan Approval.pdf | 13 Oct 2026 |
| STRUCTURAL STABILITY CERTIFICATEFile: PHASE-II Structural Stability Certificate Candeur Icon - Signed LH.pdf | 13 Oct 2026 |
| STRUCTURAL ENGINEER LICENCEFile: Structural Engineer Licence.pdf | 13 Oct 2026 |
| AGREEMENT FOR SALE PROFORMAFile: Proforma Agreement for Sale Ph 2.pdf | 13 Oct 2026 |
| ALLOTMENT LETTER PROFORMAFile: Proforma Allotment For Sale Ph 2.pdf | 13 Oct 2026 |
| SECTION 3 AFFIDAVITFile: Affidavit Section 3 Ph II.pdf | 13 Oct 2026 |
| WATER SUPPLY NOCFile: NOC BWSSB.pdf | 13 Oct 2026 |
| WATER SUPPLY NOC FEE PAIDFile: NOC BWSSB FEE PAID.pdf | 13 Oct 2026 |
| STP DRAWING 700 KLDFile: STP 700 KLD Candeur and Ramesh Signed.pdf | 13 Oct 2026 |
| STP DRAWING 700 KLDFile: STP 700 KLD Model 2 Signed by Ramesh.pdf | 13 Oct 2026 |
| STP DRAWING 820 KLDFile: STP 820 KLD Signed by Ramesh.pdf | 13 Oct 2026 |
| STP DRAWING 820 KLDFile: STP 820 KLD Model 2 Signed by Ramesh.pdf | 13 Oct 2026 |
| COST ESTIMATIONFile: Eng Brief Estimated Cost of Construction Phase II.pdf | 13 Oct 2026 |
| LAND COST CALCULATIONFile: LAND COST CALCULATION WITH GV.pdf | 13 Oct 2026 |
| GUIDANCE VALUE CERTIFICATEFile: Guidance Value Certificate.pdf | 13 Oct 2026 |
| SOURCE OF WATER DECLARATIONFile: Eng Clarification for Source of Water Phase II.pdf | 13 Oct 2026 |
| AMENITIES DECLARATIONFile: Eng Clarification for Aminities Phase II.pdf | 13 Oct 2026 |
| E-KHATHAFile: E Khatha for Complete Land.pdf | 13 Oct 2026 |
| Deed of Amalgamation for E-KHATHAFile: Deed oF Amalgamation - Candeur Icon.pdf | 13 Oct 2026 |
| LEGAL CLARIFICATION 170_3_4_5_6File: Revenue Clarification for Sy No 170-3, 4, 5 & 6.pdf | 13 Oct 2026 |
| MR 170_3_4_5_6File: MR 170 2 3 4 5 6.pdf | 13 Oct 2026 |
| MR 171_3 TO 171_16File: mr 171.pdf | 13 Oct 2026 |
| TITLE DEED 170_3_4_5_6File: TITLE 170-2.pdf | 13 Oct 2026 |
| TITLE DEED 170_3_4_5_6File: PARTITION DEED 170-2_compressed.pdf | 13 Oct 2026 |
| MR WILL 170_2File: MR WILL 170_2.pdf | 13 Oct 2026 |
| PHASE WISE BIFURCATION DETAILS CLARIFICATIONFile: PHASE WISE UNIT DETAILS UPDATED.pdf | 13 Oct 2026 |
| PHASE WISE BIFURCATION DETAILS AFFIDAVITFile: Affidavit Phase Wise updated.pdf | 13 Oct 2026 |
| FOrm 1File: Form 1 CA Certificate Ph 2.pdf | 1 Oct 2026 |
| RERA Bank Account DetailsFile: Bank Account Phase II.pdf | 1 Oct 2026 |
| Bank AffidavitFile: Affidavit Bank Ph 2.pdf | 1 Oct 2026 |
| Upload profit and loss account and balance sheet for 2022-23, 2023-24 and 2024-25 CA certification wFile: Clarification for No Previous FInancial Statements.pdf | 1 Oct 2026 |
| Source of FundsFile: Source of Fund.pdf | 1 Oct 2026 |
| Form 6 Engineer CertificateFile: Form 3 Ph II.pdf | 1 Oct 2026 |
| Non-Litigation AffidavitFile: Affidavit Non-Litigation Ph 2.pdf | 1 Oct 2026 |
| Form 2 Architect CertificateFile: Form 2 CANDEUR ICON PHASE II.pdf | 1 Oct 2026 |
| There is revenue from sales/ operation why it is not considered for section 3(1) violation of the acFile: Clarification for Previous Projects & Sales.pdf | 1 Oct 2026 |
| Affidavit Bank Ph 2File: Affidavit Bank Ph 2.pdf | 1 Oct 2026 |
| Affidavit Cum Declaration Ph 2File: Affidavit Cum Declaration Ph 2.pdf | 1 Oct 2026 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Free monthly report: Bengaluru on RERA Karnataka, month by month. What registered each month, the flat types and carpet areas being built, the taluks and the completion pipeline, from these same filings.
Buyer report
Built from this project's RERA Karnataka filing, in plain language.
- Red flags and clear checks, the possession story and who you are dealing with
- Every unit as filed, tower by tower: carpet area, undivided share of the land and parking, with the sizes placed against the other projects of the taluk
- The land chain survey by survey: conversion order, deed, khata and joint development, in date order
- Joined against the promoter's other registrations on RERA Karnataka, which the register never shows together
- What to check before you book, drawn from this filing
Not included: the filed documents themselves (the report lists which are on file and does not read them) and a project watch.
Keep CANDEUR ICON PHASE II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: M/s CANDEUR CONSTRUCTIONS
M/s. Candeur Constructions has 4 registrations on RERA Karnataka, including Candeur Landmark and CANDEUR SIGNATURE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if CANDEUR ICON PHASE II is delayed beyond 1 Aug 2032?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of CANDEUR ICON PHASE II?
The registered promoter entity is M/s CANDEUR CONSTRUCTIONS, a partnership firm as per the filing. Its GSTIN 29AAPFC8451Q1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in CANDEUR ICON PHASE II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at CANDEUR ICON PHASE II?
The professionals named in the filing: Architect: Bommu Veera Narendranath Reddy; Engineer: Ramesh B; Chartered Accountant: Rama Krishna Animireddi. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CANDEUR ICON PHASE II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.