CALISTA
RG-MH-04519 · RERA P52000022210 · Last updated on MahaRERA portal: 17 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 2 cases
- 1 complaint at MahaRERA
- Completion date moved by 11 months
- 2 extensions taken
Clear
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CALISTA is a Others project by BLUESCAPE INFRA in Raigarh, Maharashtra, registered with MahaRERA as P52000022210 on 5 Sep 2019. Possession is promised by 15 Nov 2026. The completion date has moved by 11 months from the original filing. 89 of the 129 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameCALISTA
- TypeOthers
- Location
- PUSHPAK NEW
- SECTOR 3
- Navi Mumbai Panvel Rigardh (CT)
- Panvel
- Raigarh
- 410206
- Pincode410206
- RERA no.P52000022210
- ReraGenie IDRG-MH-04519
Builder
- NameBLUESCAPE INFRA
- Entity typePartnership
- PartnersCHANDRAKANT DEVJI CHEDDA, KHETSHI GANGJI CHAMARIYA, DEVJI BECHARA CHOUDHARY, VIJAY GANESH PATEL
- Authorized SignatoryVIPUL DHIRAJ VERAT
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Sep 2019
- Promised completion15 Nov 2026
- Revised completionRevised to 15 Nov 2026 (originally 30 Dec 2025)
- Buildings1 building record
- Documents filed128 files
Current status
Figures as on 17 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| CALISTA | NA | 15 | 14 | 123 | 6 | 129 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 17 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
CALISTA: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 17 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed143
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| CALISTA | NA | Rs 40.75 cr | Rs 36.11 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ATUL PATEL |
| Engineer | PUSHPENDRA VISHWAKARMA |
| Engineer | DHANAJI BHIMARAV CHAVAN |
| Chartered Accountant | CA JYOTI GAJRA |
| Chartered Accountant | H. M. SHAH & ASSOCIATES |
| Chartered Accountant | P. R. VORA & ASSOCIATES |
| Partner | Role in project |
|---|---|
| BLUESCAPE INFRA | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe construction of the aforesaid project has been carried out in accordance with the sanctioned plans. However, the promoter has applied for issuance of further amended Commencement Certificate (CC) and approval of amended building plans from the concerned Planning Authority. Despite submission of all requisite applications, documents, and compliances, the issuance of the further amended Commencement Certificate and sanctioned amended plans has been delayed due to administrative and procedural reasons at the level of the Planning Authority, which are beyond the control of the promoter. In vie
Reason as filed by the promoterWe, Bluescape Infra, hereby declare the following with respect to the project Calista bearing registration number P52000022210 registered under MahaRERA. The delay in the completion of the real estate project has been primarily caused by a delay in OC. The project is 100% completed, and we have received the Occupation Certificate (OC) on 07/04/2026 and we have also initiated the process for the possession as well. However, there is mismatch occurred in certain details on the MahaRERA profile as compared with the sanctioned plans, such as the sanctioned built-up area, Permissible Built-up Area,
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 96/2017/2017 | PANVEL DISTRICT COURT | NO LITIGATION |
| WP/9293/2021/2019 | High Court of Bombay | Ongoing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12501219 | Pradeep Agarwal | Krishan Builders and Developers | 12/04/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Aug 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Aug 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Jul 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Aug 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 15 Nov 2026
Documents filed128
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 128 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 - March 2026.pdf | 17 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 - March 2026.pdf | 17 Aug 2026 |
| Withdrawal Update Form 3File: Form 3 - May 2026.pdf | 17 Aug 2026 |
| Building plan approvalFile: OC Plan 1_highlighted.pdf | 24 Jul 2026 |
| Building plan approvalFile: OC Plan 2_highlighted.pdf | 24 Jul 2026 |
| Building plan approvalFile: OC Plan 3_highlighted.pdf | 24 Jul 2026 |
| Building plan approvalFile: OC Plan 4.pdf | 24 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 - March 2026.pdf | 9 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 - March 2026.pdf | 9 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 - March 2026.pdf | 9 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 - March 2026.pdf | 9 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 - May 2026.pdf | 9 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 - May 2026.pdf | 9 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A - 2025-26.pdf | 9 Jul 2026 |
| Form 5 (FY 2023-2024)File: Bluescape infra FY 23-24.pdf | 19 Dec 2025 |
| Form 5 (FY 2024-2025)File: Bluescape infra FY 24-25.pdf | 19 Dec 2025 |
| Form 1File: FORM 1.pdf | 12 Dec 2025 |
| Form 2File: Form-2.pdf | 12 Dec 2025 |
| Form 3File: Form 3 with sign.pdf | 12 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory sold details.pdf | 12 Dec 2025 |
| Form 1File: FORM 1.pdf | 12 Dec 2025 |
| Form 2File: Form-2.pdf | 12 Dec 2025 |
| Form 3File: Form 3 final.pdf | 12 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: inventory sold details.pdf | 12 Dec 2025 |
| Withdrawal Update Form 1File: FORM1 Q2 25-26.pdf | 3 Dec 2025 |
| Withdrawal Update Form 2File: FORM2 Q2 25-26.pdf | 3 Dec 2025 |
| Withdrawal Update Form 3File: FORM3 25-26.pdf | 3 Dec 2025 |
| Withdrawal Update Form 1File: Final FORM 1.pdf | 19 Aug 2025 |
| Withdrawal Update Form 2File: Final FORM 2.pdf | 19 Aug 2025 |
| Withdrawal Update Form 3File: final FORM 3.pdf | 19 Aug 2025 |
| Withdrawal Update Form 1File: Final FORM 1.pdf | 28 Jul 2025 |
| Withdrawal Update Form 2File: Final FORM 2.pdf | 28 Jul 2025 |
| Withdrawal Update Form 3File: final FORM 3.pdf | 28 Jul 2025 |
| Withdrawal Update Form 1File: Final FORM 1.pdf | 25 Jul 2025 |
| Withdrawal Update Form 2File: Final FORM 2.pdf | 25 Jul 2025 |
| Withdrawal Update Form 3File: final FORM 3.pdf | 25 Jul 2025 |
| Form 2A (FY 2020-2021)File: FORM 2A (20-21).pdf | 24 Jun 2025 |
| Form 2A (FY 2019-2020)File: FORM 2A (19-20).pdf | 24 Jun 2025 |
| Form 2A (FY 2021-2022)File: FORM 2A (21-22).pdf | 24 Jun 2025 |
| Form 2A (FY 2022-2023)File: FORM 2A (22-23).pdf | 24 Jun 2025 |
| Form 2A (FY 2023-2024)File: FORM 2A (23-24).pdf | 24 Jun 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A (24-25).pdf | 24 Jun 2025 |
| Form 1File: Form 1.pdf | 18 Jun 2025 |
| Form 2File: Form 2.pdf | 18 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: invenotry sold june 24.pdf | 18 Jun 2025 |
| Form 3File: FORM 3 with sign.pdf | 18 Jun 2025 |
| Form 1File: FORM 1_.pdf | 18 Jun 2025 |
| Form 2File: FORM 2.pdf | 18 Jun 2025 |
| Form 3File: FORM 3.pdf | 18 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: invenotry sold sep 24.pdf | 18 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: invenotry sold dec 24.pdf | 18 Jun 2025 |
| Form 1File: Final FORM 1.pdf | 18 Jun 2025 |
| Form 2File: FORM 2.pdf | 18 Jun 2025 |
| Form 3File: Final FORM 3.pdf | 18 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: invenotry sold march 25.pdf | 18 Jun 2025 |
| Form 2File: FORM 2.pdf | 18 Jun 2025 |
| Form 1File: Final FORM 1.pdf | 18 Jun 2025 |
| Form 3File: Final FORM 3.pdf | 18 Jun 2025 |
| Form 5 (FY 2021-2022)File: Form 5 New.pdf | 24 May 2025 |
| Form 5 (FY 2022-2023)File: Form 5 with Sign.pdf | 24 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final FORM 1.pdf | 23 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final FORM 3.pdf | 23 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 23 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Final FORM 1.pdf | 28 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final FORM 3.pdf | 28 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 28 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_.pdf | 26 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 26 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 26 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 with sign.pdf | 20 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 9 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 9 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Sold Letter-March 24.pdf | 1 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_signed_11zon.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 10 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: final form 2.pdf | 10 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: inventory sold details.pdf | 9 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 with sign.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 19 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf | 19 Jan 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- All 128 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep CALISTA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SECTOR 35,900+ in Raigarh
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: BLUESCAPE INFRA
BLUESCAPE INFRA has 1 registration on MahaRERA, including CALISTA. Its filings disclose 1 earlier MahaRERA project, none completed yet. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if CALISTA is delayed beyond 15 Nov 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CALISTA?
The registered promoter entity is BLUESCAPE INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CALISTA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against CALISTA?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for CALISTA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CALISTA?
The professionals named in the filing: Architect: ATUL PATEL; Engineer: PUSHPENDRA VISHWAKARMA; Engineer: DHANAJI BHIMARAV CHAVAN; Chartered Accountant: CA JYOTI GAJRA; Chartered Accountant: H. M. SHAH & ASSOCIATES; Chartered Accountant: P. R. VORA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CALISTA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback