ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Butterfly Wings

Registration lapsed No litigation declared Residential / Group Housing project

Butterfly Wings

By Om SHree Maruti Sthapatya

RG-MH-35795 · RERA P51700013843 · Last updated on MahaRERA portal: 29 Sep 2021

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 29 months past the filed date
  • Completion date moved by 42 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
May 2024Possession promised29 months past this date
13 of 44Construction stages doneacross 4 buildings; furthest along: Installation of Lifts, 75%
0Complaints at MahaRERAon this registration
Jump to the 32 documents Report an error

Butterfly Wings is a Residential / Group Housing project by Om SHree Maruti Sthapatya in Thane, Maharashtra, registered with MahaRERA as P51700013843 on 27 Oct 2017. Possession was promised by 31 May 2024 and is now 29 months past that date. The completion date has moved by 42 months from the original filing.

At a glance

Project

  • NameButterfly Wings
  • TypeResidential / Group Housing
  • Location
    • Asangaon (CT)
    • Shahapur
    • Thane
    • 421601
  • Pincode421601
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700013843
  • ReraGenie IDRG-MH-35795

Builder

  • NameOm SHree Maruti Sthapatya
  • Entity typePartnership
  • PartnersNimisha Rajesh Vadaliya, Bina Dharmesh Vadalia, Ekta Denish Vadalia, Rajat Shivshankar Gaur, Harsha Ramesh Senjaliya, Amit Vallabhdas Senjaliya, Pravin Babubhai Senjaliya, Kaushikbhai Vallabhbhai Senjaliya

Key dates

29 months past promisethis monthRegisteredOct 2017First promiseNov 2020Revised toMay 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on27 Oct 2017
  • Promised completion31 May 2024
  • Revised completionRevised to 31 May 2024 (originally 30 Nov 2020)
  • Buildings4 building records
  • Documents filed32 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA60000
B WINGNA60000
C WINGNA60000
D WINGNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 29 Sep 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Installation of Lifts, at 75%.

A WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C WING38%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
D WING89%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 29 Sep 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Closed/Covered4
BuildingClosed/CoveredTotal
A WING11
B WING11
C WING11
D WING11

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,957 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
DEEPAK WEKHANDEAsangaon (CT)Thane
HEMANT WEKHANDEKalyanThane

Approvals and building plan

Permissible FSI2956.0
Proposed, not sanctioned2,464 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKalyan

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectO'ARCHILOS
PartnerRole in project
Om SHree Maruti Sthapatya-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700010122Nov 2020 → May 2024

Reason as filed by the promoterThere is covid situation and also as FSI is increased we want to revise the plan. So kindly grant the exemption also we have taken the consent and we are attaching herewith.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Oct 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Oct 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Oct 2017
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed32

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Om Shree maruti Sthapatya Form 5 March 21.pdf29 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2A Certificate 20.pdf24 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2A Certificate 20.pdf24 Aug 2021
Declaration about Commencement CertificateFile: declaration of CC.pdf23 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: O'ARCHILOS March 19.pdf23 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: O'ARCHILOS March 20.pdf23 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: O'ARCHILOS March 21.pdf23 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: O'ARCHILOS June 21.pdf23 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R-2 Rajesh Vadaliya_compressed.pdf23 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R-3 Rajesh Vadaliya_compressed.pdf23 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R-4 Rajeah Vadaliya_compressed.pdf23 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: R-5 Rajesh Vadaliya_compressed.pdf23 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2 A Quality Certificate_compressed.pdf23 Aug 2021
Disclosure of sold/ booked inventoryFile: 16 Cercular Flat Details.pdf23 Aug 2021
Certificates of CA (Form 3)File: Form - 3 PDF 1.pdf23 Aug 2021
Certificates of CA (Form 3)File: Form - 3 PDF 2.pdf23 Aug 2021
Certificates of CA (Form 3)File: Form - 3 PDF 3.pdf23 Aug 2021
Certificates of CA (Form 3)File: Form - 3 PDF 4.pdf23 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 310318.pdf23 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 310319.pdf23 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 310320.pdf23 Aug 2021
Layout approvalFile: Plan Copy Final 1.pdf12 Oct 2017
Layout approvalFile: Plan Copy Final2.pdf12 Oct 2017
Building plan approvalFile: IOD.pdf12 Oct 2017
Copy of the legal title reportFile: Titale Certificate.pdf12 Oct 2017
Details of encumbrancesFile: Encumbrances Certificate.pdf12 Oct 2017
Copy of Layout Approval (in case of layout)File: Plan Copy Final 1.pdf12 Oct 2017
Copy of Layout Approval (in case of layout)File: Plan Copy Final2.pdf12 Oct 2017
Building Plan Approval (IOD)File: IOD.pdf12 Oct 2017
Declaration in FORM BFile: From B.pdf12 Oct 2017
Certificates of CA (Form 3)File: Form 3.pdf12 Oct 2017
Proforma of Allotment letterFile: AGREEMENT FOR SALE FINAL FLAT.pdf12 Oct 2017

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 42 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Butterfly Wings on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Asangaon (CT)7,600+ in Thane

2 kmButterfly WingsCompleted 16Lapsed / revoked 12Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 37 registered projects within 2 km.

Builder: Om SHree Maruti Sthapatya

Om SHree Maruti Sthapatya has 1 registration on MahaRERA, including Butterfly Wings. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Butterfly Wings shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Butterfly Wings is delayed beyond 31 May 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Butterfly Wings?

The registered promoter entity is Om SHree Maruti Sthapatya, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Butterfly Wings?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Butterfly Wings?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Butterfly Wings?

The professionals named in the filing: Architect: O'ARCHILOS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Butterfly Wings?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Butterfly Wings. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Butterfly Wings to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.