Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 4 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
BUSINESS SIGNATURE is a Commercial project by Roongta Buildcon Ltd. in Nashik, Maharashtra, registered with MahaRERA as P51600024585 on 24 Feb 2020. The registration is recorded completed; possession was promised by 30 Jun 2024. 1 complaint is on record with the regulator.
At a glance
Project
- NameBUSINESS SIGNATURE
- TypeCommercial
- Location
- Anuradha Theater Road
- Nashik Road Nashik
- Nashik
- 422101
- Pincode422101
- RERA no.P51600024585
- ReraGenie IDRG-MH-13320
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on24 Feb 2020
- Promised completion30 Jun 2024
- Revised completionNone
- Buildings1 building record
- Documents filed45 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUSINESS SIGNATURE | NA | 6 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 4 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
BUSINESS SIGNATURE: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 4 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mr.Sagar Kabre Kabre Consultants |
| Engineer | Mr.Bhushan Shintre |
| Chartered Accountant | Ashok S Zawar and Co |
| Partner | Role in project |
|---|---|
| Roongta Buildcon Ltd. | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12502058 | Roongta Buildcon Ltd. | Mr Dinesh Verma | 24/06/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Feb 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 14 Feb 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Sep 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Sep 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 2 Apr 2024
Documents filed45
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_B Signature_2023-24.pdf | 4 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-12-23.pdf | 15 Apr 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form-4.pdf | 8 Apr 2024 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Signature_Declaration.pdf | 3 Apr 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Cert_FO_359120_419vXCgiSign_.pdf | 2 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RBL_B Signature_Form 5.pdf | 8 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form-2A_B Signature_22-23.pdf | 3 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arct certificate Form 1_B Sign.pdf | 24 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Bhushan Shintre Form 2A_B Sign.pdf | 24 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_B Sign_21-22.pdf | 24 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 11 Sep 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 (1).pdf | 11 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form_3.pdf | 11 Sep 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form_5.pdf | 11 Sep 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf | 31 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2.pdf | 31 Aug 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A.pdf | 31 Aug 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 RERA AUDIT REPORT FY 19-20.pdf | 26 Aug 2021 |
| Building plan approvalFile: B Sign Revised plan pg1.pdf | 15 Sep 2020 |
| Building plan approvalFile: B Sing Revised plan pg2.pdf | 15 Sep 2020 |
| Building plan approvalFile: B Sign Revised plan pg3.pdf | 15 Sep 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: B Sign Revised plan pg1.pdf | 15 Sep 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: B Sing Revised plan pg2.pdf | 15 Sep 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: B Sign Revised plan pg3.pdf | 15 Sep 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: B Signature Revised Comm.PDF | 15 Sep 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 B Signature RERA Arch Certificate Mar 2020.pdf | 23 May 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 B Signature RERA Engg Certificate Mar 2020.pdf | 23 May 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A B Signature RERA Engg Quality Certificate Mar 2020 new.pdf | 23 May 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 B Signature RERA CA Certificate Mar 2020.pdf | 23 May 2020 |
| Layout approvalFile: B Signature Layout copy.pdf | 14 Feb 2020 |
| Copy of Layout Approval (in case of layout)File: B Signature Layout copy.pdf | 14 Feb 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3.pdf | 14 Feb 2020 |
| Layout approvalFile: B Signature Commn Cert 2.pdf | 13 Feb 2020 |
| Building plan approvalFile: B Signature Commen Cert 1.pdf | 13 Feb 2020 |
| Building plan approvalFile: B Signature Commn Cert 2.pdf | 13 Feb 2020 |
| PAN CardFile: RBL PAN card.pdf | 13 Feb 2020 |
| Copy of the legal title reportFile: Title serch report B Sign.pdf | 13 Feb 2020 |
| Details of encumbrancesFile: B Signature Non Incrumbance.pdf | 13 Feb 2020 |
| Copy of Layout Approval (in case of layout)File: B Signature Commn Cert 2.pdf | 13 Feb 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: B Signature Commen Cert 1.pdf | 13 Feb 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: B Signature Commn Cert 2.pdf | 13 Feb 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement B Signature.PDF | 13 Feb 2020 |
| Declaration in FORM BFile: Form B Dec B Signature.PDF | 13 Feb 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert B Signature.pdf | 13 Feb 2020 |
| Proforma of Allotment letterFile: Draft Roongta Signature.pdf | 13 Feb 2020 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Business PointP51600026139 | Kamatwade Nashik, Nashik | - | Aug 2020 | Completed | Jun 2024 | May 2024 |
| Business Center | Near Business Court Opp Indigo Park Tidke Colony Link Road Nashik 422009 | 1 | - | Completed | Dec 2020 | Dec 2019 |
| Business Park | Opp. Sadhashiv Nagar Near Sagar Sweet Tidake Colony Link Road Nashik 422009 | 1 | - | Completed | Feb 2018 | Feb 2018 |
| Business Court | Opp Indigo park Tidke Colony Road Govind Nagar NAsik | 1 | - | Completed | Dec 2014 | Dec 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations, which the RERA portal never shows together
- All 45 filed documents as one ZIP, foldered, with a manifest
Keep BUSINESS SIGNATURE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nashik Road Nashik4,100+ in Nashik
The Exchange
Viraj Estates Pvt. Ltd. & Others
HARI SANSKRUTI PHASE II
KBC GLOBAL LIMITED
ARRPAN HOUSING
A C JAIN BUILDERS AND DEVELOPERS LLP
Shilpa Madhuvan
Shilpa Estate
STAR PLUS B
DEEPAK KALYANJI CHANDE
SKY ONE
OM SAI OM BUILDERS
See every Nashik project, with the district possession charts
Builder: Roongta Buildcon Ltd.
Roongta Buildcon Ltd. has 4 registrations on MahaRERA, including Business Center and Business Park. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if BUSINESS SIGNATURE is delayed beyond 30 Jun 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of BUSINESS SIGNATURE?
The registered promoter entity is Roongta Buildcon Ltd., a company as per the filing. Its CIN U67120MH1994PLC255254 and GSTIN 27AAACS0773M1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in BUSINESS SIGNATURE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against BUSINESS SIGNATURE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for BUSINESS SIGNATURE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at BUSINESS SIGNATURE?
The professionals named in the filing: Architect: Mr.Sagar Kabre Kabre Consultants; Engineer: Mr.Bhushan Shintre; Chartered Accountant: Ashok S Zawar and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in BUSINESS SIGNATURE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback